Contributions
[ AI/Question: Q14/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 913 ]
|
Some concerns about and proposals for the future direction of ASON
|
NTT
|
Q14/15, Q12/15
|
2008-02-06 |
|
[ 856 ]
|
Change Proposal for G.7712 re the T-MPLS Management Communication Channel
|
Alcatel-Lucent
|
Q12/15, Q14/15
|
2008-02-01 |
|
[ 846 ]
|
Proposed inter-domain restoration extensions for G.7713.2
|
China Telecom
,
ZTE
,
Huawei
|
Q14/15
|
2008-02-01 |
|
[ 845 ]
|
Additional hard rerouting scenarios in multiple domains for G.7713
|
China Telecom
,
Huawei
,
ZTE
,
Alcatel-Lucent
|
Q14/15
|
2008-02-01 |
|
[ 830 ]
|
G.pacmod-bis: Test results of the new timing distribution mechanism
|
Huawei
|
Q14/15, Q13/15, Q12/15
|
2008-02-01 |
|
[ 828 ]
|
Requirements for Network Automatic Configuration
|
Huawei
|
Q14/15, Q12/15
|
2008-01-31 |
|
[ 782 ]
|
Proposed study items for packet based transport technologies for the next study period (2009-2012)
|
NTT
|
QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15
|
2008-01-31 |
|
[ 745 ]
|
A5 Reference Proforma for revised G.7712/Y.1703 Recommendation
|
Cisco
|
Q14/15
|
2008-01-30 |
|
[ 736 ]
|
Comments on Draft new recommendation G.8152
|
ZTE
|
Q14/15
|
2008-01-30 |
|
[ 735 ]
|
Add fault and configuration management requirement section to Draft new recommendation G.8152
|
ZTE
|
Q14/15
|
2008-01-30 |
|
[ 732 ]
|
Proposal on adding switching resource attribute of node
|
ZTE
|
Q14/15
|
2008-01-30 |
|
[ 679 ]
|
G.7713 - SP34-interlayer details
|
Nortel Networks (Canada)
|
Q14/15
|
2008-01-29 |
|
[ 677 ]
|
Proposed liaison response for PCE
|
Nortel Networks (Canada)
|
Q14/15, Q12/15
|
2008-01-29 |
|
[ 654 ]
|
DCN Architecture and Gateways
|
Ciena Corp
|
Q14/15, Q12/15
|
2008-01-29 |
|
[ 653 ]
|
Problems with G.8010
|
Ciena Corp
|
Q14/15, Q12/15, Q9/15
|
2008-01-29 |
|
[ 652 ]
|
Problems with G.7718.1
|
Ciena Corp
|
Q14/15
|
2008-01-29 |
|
[ 618 ]
|
T-MPLS Performance Monitoring
|
Alcatel-Lucent
|
Q14/15, Q9/15
|
2007-05-25 |
|
[ 595 ]
|
IP/MPLS and T-MPLS Interoperability
|
Alcatel-Lucent
|
Q14/15, Q12/15
|
2007-05-25 |
|
[ 592 ]
|
MCC and SCC Options for T-MPLS
|
Alcatel-Lucent
|
Q12/15, Q14/15
|
2007-05-25 |
|
[ 591 ]
|
Proposal how to eliminate the SCC/MCC PDU length limitation in G.8114
|
Alcatel-Lucent
|
Q12/15, Q14/15
|
2007-05-25 |
|
[ 585 ]
|
Comments on draft new Amendment 2 to G.7041
|
Alcatel-Lucent
|
Q14/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 562 ]
|
G.7713, SP34 - interlayer description
|
Nortel Networks (Canada)
|
Q14/15
|
2007-05-25 |
|
[ 561 ]
|
ASON Call Routing
|
Nortel Networks (Canada)
|
Q14/15, Q12/15
|
2007-05-25 |
|
[ 507 ]
|
Proposal to Update IETF RFC Reference in G.7712
|
Cisco Systems Inc.
|
Q14/15
|
2007-05-25 |
|
[ 470 ]
|
Trigger events for auditing process
|
Huawei Technologies Co., Ltd
|
Q14/15
|
2007-05-24 |
|
[ 445 ]
|
Proposal for new signalling for preventing undesirable operational events in ASON
|
Nippon Telegraph & Telephone Corp. (NTT)
|
Q14/15
|
2007-05-24 |
|
[ 427 ]
|
Comments to G.tmpls_mgmt
|
ZTE
|
Q14/15
|
2007-05-24 |
|
[ 426 ]
|
Suggestion to information model definition of T-MPLS
|
ZTE
|
Q14/15
|
2007-05-24 |
|
[ 421 ]
|
Correcting the binding relationship between different control plane components in G.7716
|
ZTE Corporation
|
Q14/15
|
2007-05-24 |
|
[ 418 ]
|
Proposed modification of accounting management to G.7718
|
China, Telecom
|
Q14/15
|
2007-05-24 |
|
[ 417 ]
|
Proposals for control plane performance monitoring parameters
|
China Academy of Telecommunications Research (MII)
|
Q14/15, Q12/15
|
2007-05-24 |
|
[ 411 ]
|
Proposed text for section 6, 9.3 and 11.2.1 of G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 410 ]
|
Proposed text for section 5 of G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 406 ]
|
Proposed new section 14 in G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 405 ]
|
Proposed text for section 10.3 of G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 404 ]
|
Proposal to table 1 of section 8.1 of G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 395 ]
|
Component and protocol for Management of Control Channels in G.8080
|
ETRI
|
Q14/15, Q12/15
|
2007-05-24 |
|
[ 394 ]
|
Configuration, Liveliness Check and Resilience of Control Channels in ASON
|
ETRI
|
Q14/15, Q12/15
|
2007-05-24 |
|
[ 306 ]
|
Traffic Conditioning Function for GFP MCC and SCC
|
Ceterus Networks
|
Q14/15, Q12/15, Q11/15, Q9/15
|
2007-05-22 |
|
[ 243 ]
|
Proposal to continue work on 10GbE bit rates
|
Cisco Systems
|
Q14/15, Q12/15, Q11/15
|
2006-10-20 |
|
[ 242 ]
|
Impact of T-MPLS on a carrier operations group
|
Cisco Systems
|
Q14/15, Q12/15, Q11/15, Q9/15
|
2006-10-20 |
|
[ 227 ]
|
Protocol extension for automatic discovery in OTN networks
|
ETRI
|
Q14/15
|
2006-10-20 |
|
[ 213 ]
|
Proposal of amendments for flexible connection release in G.7713
|
NTT
|
Q14/15
|
2006-10-20 |
|
[ 201 ]
|
The corrigendum for G.8080 and G.7713
|
ZTE Corporation
|
Q14/15, Q12/15
|
2006-10-20 |
|
[ 200 ]
|
Some concerns on the new-type control plane for circuit & packet transport network
|
ZTE Corporation
|
Q14/15, Q12/15
|
2006-10-20 |
|
[ 199 ]
|
Proposals to start Directory Service research work
|
ZTE Corporation
|
Q14/15
|
2006-10-20 |
|
[ 147 ]
|
Proposed text for G.7716 draft
|
Huawei Technologies
|
Q14/15
|
2006-10-19 |
|
[ 80 ]
|
Ethernet priorities
|
Nortel Networks (Canada)
|
Q14/15, Q11/15, Q9/15, Q12/15
|
2006-10-18 |
|
[ 67 ]
|
Protocol extension for automatic discovery in OTN networks
|
ETRI
|
Q14/15
|
2006-10-18 |
|
[ 55 ]
|
10GbE LAN PHY within OTN optical hierarchy
|
Sprint Nextel
|
Q14/15, Q13/15, Q12/15, Q9/15, Q6/15, Q11/15
|
2006-10-17 |
Results:52 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):