Contributions
[ AI/Question: Q12/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 913 ]
|
Some concerns about and proposals for the future direction of ASON
|
NTT
|
Q14/15, Q12/15
|
2008-02-06 |
|
[ 908 ]
|
Layer model of Ethernet
|
Deutsche Telekom
|
Q12/15
|
2008-02-03 |
|
[ 856 ]
|
Change Proposal for G.7712 re the T-MPLS Management Communication Channel
|
Alcatel-Lucent
|
Q12/15, Q14/15
|
2008-02-01 |
|
[ 843 ]
|
Requirement of MS-PW over T-MPLS
|
CMCC
,
Alcatel Shangai Bell
,
CU
,
CATR MII China
|
Q12/15, Q11/15, Q9/15
|
2008-02-01 |
|
[ 830 ]
|
G.pacmod-bis: Test results of the new timing distribution mechanism
|
Huawei
|
Q14/15, Q13/15, Q12/15
|
2008-02-01 |
|
[ 828 ]
|
Requirements for Network Automatic Configuration
|
Huawei
|
Q14/15, Q12/15
|
2008-01-31 |
|
[ 826 ]
|
Corrections to FD/FDFr Usage in G.8010
|
Huawei
|
Q12/15
|
2008-01-31 |
|
[ 823 ]
|
PBB Model for G.8010
|
Huawei
|
Q12/15
|
2008-01-31 |
|
[ 822 ]
|
G.800 Term for Interconnect Transport Entities
|
Huawei
|
Q12/15
|
2008-01-31 |
|
[ 821 ]
|
G.800 description modification
|
Huawei
|
Q12/15
|
2008-01-31 |
|
[ 815 ]
|
Annex of G.8010v2 to describe the PVT network application
|
Huawei
,
Nokia Siemens Networks
|
Q12/15
|
2008-01-31 |
|
[ 797 ]
|
Consideration on IP/MPLS and T-MPLS interworking
|
Fujitsu
|
Q12/15
|
2008-01-31 |
|
[ 788 ]
|
Complexity, Scalability, Independency, and Transparency
|
BT
|
Q12/15
|
2008-01-31 |
|
[ 782 ]
|
Proposed study items for packet based transport technologies for the next study period (2009-2012)
|
NTT
|
QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15
|
2008-01-31 |
|
[ 738 ]
|
Combination of protection and restoration in G.8080
|
ZTE
|
Q12/15
|
2008-01-30 |
|
[ 734 ]
|
Clarification for FP partitioning in G.8010
|
ZTE
|
Q12/15
|
2008-01-30 |
|
[ 730 ]
|
Proposal for adding definition of control component topology in ASON
|
ZTE
|
Q12/15
|
2008-01-30 |
|
[ 713 ]
|
VLAN model in G.8010
|
BT, Nortel Networks (Europe)
|
Q12/15
|
2008-01-30 |
|
[ 712 ]
|
PBB model for G.8010
|
BT, Nortel Networks (Europe)
|
Q12/15
|
2008-01-30 |
|
[ 711 ]
|
Approach to modelling in G.pbb-te
|
BT, Nortel Networks (Europe)
|
Q12/15
|
2008-01-30 |
|
[ 677 ]
|
Proposed liaison response for PCE
|
Nortel Networks (Canada)
|
Q14/15, Q12/15
|
2008-01-29 |
|
[ 654 ]
|
DCN Architecture and Gateways
|
Ciena Corp
|
Q14/15, Q12/15
|
2008-01-29 |
|
[ 653 ]
|
Problems with G.8010
|
Ciena Corp
|
Q14/15, Q12/15, Q9/15
|
2008-01-29 |
|
[ 651 ]
|
The future of G.7716
|
Ciena Corp, Nortel Networks (USA)
|
Q12/15
|
2008-01-29 |
|
[ 619 ]
|
Deployment of MAC addresses in transport network equipment and relation with Access Point ID and MEG and MEP/MIP ID
|
Alcatel-Lucent
|
Q12/15
|
2007-05-25 |
|
[ 617 ]
|
Architecture of multipoint connections in a transport network with channel and path layers
|
Alcatel-Lucent
|
Q12/15
|
2007-05-25 |
|
[ 616 ]
|
Encapsulation of Ethernet signals in T-MPLS multipoint service cases
|
Alcatel-Lucent
|
Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 615 ]
|
E-LAN and E-TREE service related CI and AI in T-MPLS networks
|
Alcatel-Lucent
|
Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 614 ]
|
Structured and unstructured labels and label allocation policy
|
Alcatel-Lucent
|
Q12/15
|
2007-05-25 |
|
[ 613 ]
|
Subnetwork, Matrix and Link
|
Alcatel-Lucent
|
Q12/15
|
2007-05-25 |
|
[ 612 ]
|
Pre-condition for client/server independence
|
Alcatel-Lucent
|
Q12/15
|
2007-05-25 |
|
[ 611 ]
|
E-LAN and E-TREE service support in T-MPLS networks
|
Alcatel-Lucent
|
Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 610 ]
|
Designing a scalable T-MPLS network architecture
|
Alcatel-Lucent
|
Q12/15, Q9/15
|
2007-05-25 |
|
[ 597 ]
|
Proposal for T-MPLS TCS (Traffic Conditioning and Shaping) in G.8110.1
|
Alcatel-Lucent
|
Q12/15
|
2007-05-25 |
|
[ 596 ]
|
Support of PDH over T-MPLS (PW adaptation)
|
Alcatel-Lucent
|
Q13/15, Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 595 ]
|
IP/MPLS and T-MPLS Interoperability
|
Alcatel-Lucent
|
Q14/15, Q12/15
|
2007-05-25 |
|
[ 594 ]
|
Support of ATM over T-MPLS (PW adaptation)
|
Alcatel-Lucent
|
Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 593 ]
|
Proposals for Current Draft of G.ufatn and Future Work
|
BT
|
Q12/15
|
2007-05-25 |
|
[ 592 ]
|
MCC and SCC Options for T-MPLS
|
Alcatel-Lucent
|
Q12/15, Q14/15
|
2007-05-25 |
|
[ 591 ]
|
Proposal how to eliminate the SCC/MCC PDU length limitation in G.8114
|
Alcatel-Lucent
|
Q12/15, Q14/15
|
2007-05-25 |
|
[ 561 ]
|
ASON Call Routing
|
Nortel Networks (Canada)
|
Q14/15, Q12/15
|
2007-05-25 |
|
[ 551 ]
|
Updates to G.8080 LRM and TAP components to support packet switching
|
Nortel Networks (Canada)
|
Q12/15
|
2007-05-25 |
|
[ 533 ]
|
Items under study in Q12
|
BT
|
Q12/15
|
2007-05-25 |
|
[ 514 ]
|
Proposed study items for packet based transport technologies for the next study period (2009-2012)
|
NTT
|
Q12/15, Q11/15, Q9/15, Q3/15
|
2007-05-25 |
|
[ 492 ]
|
Consideration on T-MPLS connections and its server layer
|
Fujitsu
|
Q12/15
|
2007-05-24 |
|
[ 491 ]
|
Proposed update for G.8112
|
Fujitsu
|
Q12/15, Q11/15
|
2007-05-24 |
|
[ 471 ]
|
VS Technical Clarification
|
Huawei Technologies Co., Ltd
,
China Telecom Co., Ltd
|
Q12/15
|
2007-05-24 |
|
[ 432 ]
|
Proposals to add directory service component into G.8080
|
ZTE Corporation
|
Q12/15
|
2007-05-24 |
|
[ 417 ]
|
Proposals for control plane performance monitoring parameters
|
China Academy of Telecommunications Research (MII)
|
Q14/15, Q12/15
|
2007-05-24 |
|
[ 409 ]
|
Proposals of new interface to LRM component in G.8080
|
Ministry of Information Industry of P.R. China
|
Q12/15
|
2007-05-24 |
Results:128 total items. Result page:
1 -
2 -
3
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):