International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Results:913 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 613 ]  
 
Subnetwork, Matrix and Link     Alcatel-Lucent   Q12/15   2007-05-25
[ 612 ]  
 
Pre-condition for client/server independence     Alcatel-Lucent   Q12/15   2007-05-25
[ 611 ]  
 
E-LAN and E-TREE service support in T-MPLS networks     Alcatel-Lucent   Q12/15, Q11/15, Q9/15   2007-05-25
[ 610 ]  
 
Designing a scalable T-MPLS network architecture     Alcatel-Lucent   Q12/15, Q9/15   2007-05-25
[ 609 ]  
 
Wording for "Reference source selection mechanism" in G.paclock     Semtech   Q13/15   2007-05-25
[ 608 ]  
 
Wording for "Frequency accuracy" in G.paclock     Semtech   Q13/15   2007-05-25
[ 607 ]  
 
Managed- FDB APS scheme by selective deletion for Ethernet ring protection     ETRI   Q9/15   2007-05-25
[ 606 ]  
 
Notion of alignment in time, phase, and frequency     Semtech   Q13/15   2007-05-25
[ 605 ]  
 
Min_TDEV Metric     Semtech   Q13/15   2007-05-25
[ 604 ]  
 
Performance of DP-QPSK in 40 Gbit/s Networks     Nortel Networks (Europe)   Q6/15   2007-05-25
[ 603 ]  
 
Verifying Differential Methods of TDM Clock Recovery     Semtech   Q13/15   2007-05-25
[ 602 ]  
 
G.ploam: G.vdsl: Proposal for updates of the baseline text on INM     Infineon   Q4/15   2007-05-25
[ 601 ]  
 
G.vdsl: Comparison of Retransmission and Frame Blanking in REIN     Infineon   Q4/15   2007-05-25
[ 600 ]  
 
G.992.3/G.992.5: Proposed accuracy for the absolute error of HLOG and QLN     Infineon   Q4/15   2007-05-25
[ 599 ]  
 
G.vdsl, G.ploam: Proposal for SNRM per latency path     Infineon   Q4/15   2007-05-25
[ 598 ]  
 
G.hn: On the FEC structure in G.hn     Infineon   Q4/15   2007-05-25
[ 597 ]  
 
Proposal for T-MPLS TCS (Traffic Conditioning and Shaping) in G.8110.1     Alcatel-Lucent   Q12/15   2007-05-25
[ 596 ]  
 
Support of PDH over T-MPLS (PW adaptation)     Alcatel-Lucent   Q13/15, Q12/15, Q11/15, Q9/15   2007-05-25
[ 595 ]  
 
IP/MPLS and T-MPLS Interoperability     Alcatel-Lucent   Q14/15, Q12/15   2007-05-25
[ 594 ]  
 
Support of ATM over T-MPLS (PW adaptation)     Alcatel-Lucent   Q12/15, Q11/15, Q9/15   2007-05-25
[ 593 ]  
 
Proposals for Current Draft of G.ufatn and Future Work     BT   Q12/15   2007-05-25
[ 592 ]  
 
MCC and SCC Options for T-MPLS     Alcatel-Lucent   Q12/15, Q14/15   2007-05-25
[ 591 ]  
 
Proposal how to eliminate the SCC/MCC PDU length limitation in G.8114     Alcatel-Lucent   Q12/15, Q14/15   2007-05-25
[ 590 ]  
 
Proposal for an Amendment 1 to G.8112     Alcatel-Lucent   Q11/15   2007-05-25
[ 589 ]  
 
Textual proposal for APS protocol description G.8132     Alcatel-Lucent   Q9/15   2007-05-25
[ 588 ]  
 
G.VDSL2, G.ADSL: Spreading of uncorrectable errors by the Reed-Solomon Interleaver     Infineon   Q4/15   2007-05-25
[ 587 ]  
 
G.VDSL2, G.ADSL: A proposal for a new data-continuous interleaver     Infineon   Q4/15   2007-05-25
[ 586 ]  
 
(NRZ-)DQPSK as a suitable modulation format for 100+ Gb/s serial transport     Alcatel-Lucent Germany   Q6/15   2007-05-25
[ 585 ]  
 
Comments on draft new Amendment 2 to G.7041     Alcatel-Lucent   Q14/15, Q11/15, Q9/15   2007-05-25
[ 584 ]  
 
Inconsistencies in G.8021v2     ITEK   Q9/15   2007-05-25
[ 583 ]  
 
Computing cost of managed FDB APS scheme in ERP     ETRI   Q9/15   2007-05-25
[ 582 ]  
 
Synchronization inputs in G.paclock     Semtech   Q13/15   2007-05-25
[ 581 ]  
 
Scope of G.paclock     Semtech   Q13/15   2007-05-25
[ 580 ]  
 
Wording for "Scope" in G.paclock     Semtech   Q13/15   2007-05-25
[ 579 ]  
 
Proposal to keep SSM transport based upon IEEE802.3ah as an option     Tellabs Oy   Q13/15   2007-05-25
[ 578 ]  
 
Addition of "Through Clock" for Synchronous Ethernet     Tellabs Oy   Q13/15   2007-05-25
[ 577 ]  
 
Two-Way Protocols Test Cases in Appendix VI/G.8261     IL-MOC   Q13/15   2007-05-27
[ 576 ]  
 
A New Appendix for Background Traffic Models Generation Examples     IL-MOC   Q13/15   2007-05-27
[ 575 ]  
 
Modification for Test Case 7 of G.8261     IL-MOC   Q13/15   2007-05-27
[ 574 ]  
 
Information on alternative modulation formats for revision of sup.39     Alcatel-Lucent   Q6/15   2007-05-25
[ 573 ]  
 
Proposal for 43Gb/s application at G.dapp2 considering PSBT (ODB) modulation format for 100GHz and for 50 GHz channel spacing.     Alcatel-Lucent   Q6/15   2007-05-25
[ 572 ]  
 
Proposal for revision of G.671 to extend the wavelength range of chromatic dispersion compensating components     Alcatel-Lucent   Q7/15   2007-05-25
[ 571 ]  
 
G.paclock document structure     Zarlink   Q13/15   2007-05-25
[ 570 ]  
 
G.paclock - editorial/clarifications     Zarlink   Q13/15   2007-05-25
[ 569 ]  
 
G.paclock - Clause 5.7.4.1 - Phase discontinuity for EEC-Option 1     Zarlink   Q13/15   2007-05-25
[ 568 ]  
 
G.paclock - Clause 5.7.3 - Phase response to input signal interruptions     Zarlink   Q13/15   2007-05-25
[ 567 ]  
 
G.paclock - Figure 14     Zarlink   Q13/15   2007-05-25
[ 566 ]  
 
Synchronous Ethernet - jitter requirements     Zarlink   Q13/15   2007-05-25
[ 565 ]  
 
G.paclock - Clause 5.4.3 Jitter     Zarlink   Q13/15   2007-05-25
[ 564 ]  
 
G.paclock - Clause 5.5.2 Jitter Tolerance     Zarlink   Q13/15   2007-05-25
Results:913 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2006-09-28