International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2008-02-11 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2008-02-11) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2008-02-11 to 2008-02-22

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2007-06-04  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Results:21 total items.
Contributions  [ Source: BT ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 884 ]  
 
G.INP, G.ADSL, Requirements for Retransmission in VDSL2/INP and ADSL2/INP     BT   Q4/15   2008-02-01
[ 883 ]  
 
G.VDSL: Requirements for Longitudinal Conversion Loss     BT   Q4/15   2008-02-01
[ 882 ]  
 
G.hn Noise Model Proposal for G.hn     BT   Q4/15   2008-02-01
[ 881 ]  
 
G.ploam: Control of Virtual Noise     BT   Q4/15   2008-02-01
[ 880 ]  
 
ADSL: Low Power ADSL variants - Issues: P.10.3     BT   Q4/15   2008-02-01
[ 788 ]  
 
Complexity, Scalability, Independency, and Transparency     BT   Q12/15   2008-01-31
[ 744 ]  
 
G.lt: Attenuation Measurement     Ericsson , BT   Q4/15   2008-01-30
[ 742 ]  
 
G.lt: Quiet Line Noise Measurement     Ericsson , BT   Q4/15   2008-01-30
[ 740 ]  
 
G.lt: Test Management and Communications     BT , Ericsson   Q4/15   2008-01-30
[ 739 ]  
 
G.lt: Impulse Noise Measurement     BT   Q4/15   2008-01-30
[ 723 ]  
 
Protection amendments for G.984.1     BT   Q2/15   2008-01-30
[ 722 ]  
 
Circuit emulation contribution for G.984.1     BT   Q2/15   2008-01-30
[ 721 ]  
 
G.984.1: Extra examples of SNI     BT   Q2/15   2008-01-30
[ 720 ]  
 
Synchronisation improvements for G.984.1     BT   Q2/15   2008-01-30
[ 713 ]  
 
VLAN model in G.8010     BT, Nortel Networks (Europe)   Q12/15   2008-01-30
[ 712 ]  
 
PBB model for G.8010     BT, Nortel Networks (Europe)   Q12/15   2008-01-30
[ 711 ]  
 
Approach to modelling in G.pbb-te     BT, Nortel Networks (Europe)   Q12/15   2008-01-30
[ 703 ]  
 
G.lt: Table of Contents     BT   Q4/15   2008-01-30
[ 700 ]  
 
Proposal for Erratum to G.703 for the 2048KHz synchronisation interface     BT   Q11/15   2008-01-30
[ 626 ]  
 
Manual switch command in G.8032     BT   Q9/15   2007-12-04
[ 625 ]  
 
Extending Wait to Restore times in G.841, G.808.1, G.8031, G.8032     BT   Q9/15, Q11/15   2007-11-30
Results:21 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-5-9