Contributions
[ AI/Question: 11/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 910 ]
|
Requirements on OTN enhancements
|
Deutsche Telekom
|
Q11/15
|
2008-02-03 |
|
[ 909 ]
|
Requirements on Mapping of 40GBase and 100GBase into ODUs
|
Deutsche Telekom
|
Q11/15
|
2008-02-03 |
|
[ 892 ]
|
Mapping of 40 GbE into OTN and Mean Time to False Packet Acceptance (MTTFPA)
|
Alcatel-Lucent
|
Q11/15
|
2008-02-03 |
|
[ 865 ]
|
Transparent Transport of FC1200 over OPU2e/OPU1e
|
Nortel
|
Q11/15
|
2008-02-01 |
|
[ 861 ]
|
Client services Sub ODU1 mapping into OTN using HO-VC
|
Alcatel-Lucent
|
Q11/15, Q9/15
|
2008-02-01 |
|
[ 855 ]
|
Ethernet Virtual Private LAN service descriptions and function model
|
CMCC
,
Alcatel Shangai Bell
|
Q11/15
|
2008-02-01 |
|
[ 854 ]
|
Functional model of EVPRMP in G.8011.4
|
Alcatel shangai bell
,
LSI Corp
|
Q11/15
|
2008-02-01 |
|
[ 848 ]
|
TTL operation in the TM-SPRing
|
China Telecom
,
Beijing University of P&T
|
Q11/15, Q9/15
|
2008-02-01 |
|
[ 843 ]
|
Requirement of MS-PW over T-MPLS
|
CMCC
,
Alcatel Shangai Bell
,
CU
,
CATR MII China
|
Q12/15, Q11/15, Q9/15
|
2008-02-01 |
|
[ 842 ]
|
Requirement of GE service transport on optical network
|
CMCC
|
Q11/15
|
2008-02-01 |
|
[ 841 ]
|
G.8011.3 -Ethernet Virtual Private LAN-Draft 01
|
CMCC
,
Alcatel Shangai Bell
|
Q11/15
|
2008-02-01 |
|
[ 824 ]
|
Independently Transport of Four 512/513b Transcoded 10GbEs in standard ODU3
|
Huawei
|
Q11/15
|
2008-01-31 |
|
[ 819 ]
|
Consideration about NG OTN hierarchy
|
Huawei
|
Q11/15
|
2008-01-31 |
|
[ 818 ]
|
Consideration about 40GE/100GE transport
|
Huawei
|
Q11/15
|
2008-01-31 |
|
[ 816 ]
|
Behaviour of Cn transport for GMP
|
Huawei
|
Q11/15
|
2008-01-31 |
|
[ 813 ]
|
2048/2049B transcoded 10GbE in ODU2
|
Huawei
|
11/15
|
2008-01-31 |
|
[ 811 ]
|
Proposal on OAM architecture and attribute for EVPLAN services
|
Huawei
,
China Mobile
|
Q11/15
|
2008-01-31 |
|
[ 810 ]
|
Proposal on the model and architecture of EVPLAN
|
Huawei
,
China Mobile
|
Q11/15
|
2008-01-31 |
|
[ 804 ]
|
Comment on G.8011.4
|
Hitachi
|
Q11/15
|
2008-01-31 |
|
[ 802 ]
|
Comment on Connectivity Monitoring in G.8011.4
|
Hitachi
|
Q11/15
|
2008-01-31 |
|
[ 796 ]
|
Proposed OTN hierarchy for SDH, 10GE, 40GE and 100GE
|
Fujitsu
|
Q11/15
|
2008-01-31 |
|
[ 795 ]
|
Consideration on mapping10GbE x 4 mapping into ODU3
|
Fujitsu
|
Q11/15
|
2008-01-31 |
|
[ 786 ]
|
40 GbE MTTFPA when using 512B/513B transcoding
|
NTT
|
Q11/15
|
2008-01-31 |
|
[ 785 ]
|
OTN enhancement accommodating Ethernet clients with bit transparency as well as block code transparency
|
NTT
|
Q11/15
|
2008-01-31 |
|
[ 782 ]
|
Proposed study items for packet based transport technologies for the next study period (2009-2012)
|
NTT
|
QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15
|
2008-01-31 |
|
[ 773 ]
|
Proposal on requirements for the transportation of Ethernet client over OTN
|
KDDI
|
Q11/15
|
2008-01-31 |
|
[ 719 ]
|
GFP DCI Considerations
|
Tellabs Oy
|
Q11/15
|
2008-01-30 |
|
[ 718 ]
|
CSF Usage with GFP-F
|
Tellabs Oy
|
Q11/15
|
2008-01-30 |
|
[ 702 ]
|
Mapping of 40 GbE and 100 GbE into OTN
|
Lucent Technologies
|
Q11/15
|
2008-01-30 |
|
[ 700 ]
|
Proposal for Erratum to G.703 for the 2048KHz synchronisation interface
|
BT
|
Q11/15
|
2008-01-30 |
|
[ 692 ]
(Rev.1) |
G.8011 - Y.1731 parameters
|
Nortel Networks (Canada)
|
Q11/15
|
2008-01-29 |
|
[ 656 ]
|
Frame structures and multiplexing approach to support ODUk sub-wavelength service multiplexing in OTN
|
Ciena Corporation, Vitesse Semiconductor
|
Q11/15
|
2008-01-29 |
|
[ 655 ]
|
Overhead required to support sub-ODU1 service multiplexing and add/drop
|
Ciena Corporation, Vitesse Semiconductor
|
Q11/15
|
2008-01-29 |
|
[ 625 ]
|
Extending Wait to Restore times in G.841, G.808.1, G.8031, G.8032
|
BT
|
Q9/15, Q11/15
|
2007-11-30 |
Results:34 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):