Contributions
[ AI/Question: Q9/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 622 ]
|
Proposed enhancements in G.8132
|
Alcatel-Lucent
|
Q9/15
|
2007-05-25 |
|
[ 620 ]
|
Protection switching triggers for TM-SPRing
|
Alcatel-Lucent
|
Q9/15
|
2007-05-25 |
|
[ 618 ]
|
T-MPLS Performance Monitoring
|
Alcatel-Lucent
|
Q14/15, Q9/15
|
2007-05-25 |
|
[ 616 ]
|
Encapsulation of Ethernet signals in T-MPLS multipoint service cases
|
Alcatel-Lucent
|
Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 615 ]
|
E-LAN and E-TREE service related CI and AI in T-MPLS networks
|
Alcatel-Lucent
|
Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 611 ]
|
E-LAN and E-TREE service support in T-MPLS networks
|
Alcatel-Lucent
|
Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 610 ]
|
Designing a scalable T-MPLS network architecture
|
Alcatel-Lucent
|
Q12/15, Q9/15
|
2007-05-25 |
|
[ 607 ]
|
Managed- FDB APS scheme by selective deletion for Ethernet ring protection
|
ETRI
|
Q9/15
|
2007-05-25 |
|
[ 596 ]
|
Support of PDH over T-MPLS (PW adaptation)
|
Alcatel-Lucent
|
Q13/15, Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 594 ]
|
Support of ATM over T-MPLS (PW adaptation)
|
Alcatel-Lucent
|
Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 589 ]
|
Textual proposal for APS protocol description G.8132
|
Alcatel-Lucent
|
Q9/15
|
2007-05-25 |
|
[ 585 ]
|
Comments on draft new Amendment 2 to G.7041
|
Alcatel-Lucent
|
Q14/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 584 ]
|
Inconsistencies in G.8021v2
|
ITEK
|
Q9/15
|
2007-05-25 |
|
[ 583 ]
|
Computing cost of managed FDB APS scheme in ERP
|
ETRI
|
Q9/15
|
2007-05-25 |
|
[ 560 ]
|
Link Aggregation
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 559 ]
|
RPR for G.8021
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 556 ]
|
ERP Interactions with Layer 2 Network Control Protocols
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 555 ]
|
Ethernet - Shared Protection Ring (E-SPRing)
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 554 ]
|
E-SPRing Handling of Multiple Failures
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 553 ]
|
E-SPRing Failure Propagation
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 552 ]
|
Specification of point to multipoint in G.8121 amendment 1
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 550 ]
|
Ethernet services
|
Nortel Networks (Canada)
|
Q9/15, Q11/15
|
2007-05-25 |
|
[ 535 ]
|
Proposal on state transition tables for T-MPLS linear protection switching
|
ETRI,
,
Huawei Technologies
|
Q9/15
|
2007-05-25 |
|
[ 531 ]
|
Support of 1 Gbps and 10Gbps Ethernet remote failures via GFP CMF/CSF
|
Tellabs Oy
|
Q11/15, Q9/15
|
2007-05-25 |
|
[ 525 ]
|
Proposal for Ethernet Rings Protection Switching Mechanisms
|
NTT
,
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2007-05-25 |
|
[ 524 ]
|
Proposal of ERP initial state
|
NTT
|
Q9/15
|
2007-05-25 |
|
[ 523 ]
|
Proposal of identification of APS frame
|
NTT
|
Q9/15
|
2007-05-25 |
|
[ 522 ]
|
Proposal of range restrictions for transmission of APS frame
|
NTT
|
Q9/15
|
2007-05-25 |
|
[ 514 ]
|
Proposed study items for packet based transport technologies for the next study period (2009-2012)
|
NTT
|
Q12/15, Q11/15, Q9/15, Q3/15
|
2007-05-25 |
|
[ 512 ]
|
A proposed modification to the response to DNR in G.8031v2
|
ETRI
|
Q9/15
|
2007-05-25 |
|
[ 493 ]
|
Proposed modification for G.8131 Amendment
|
Fujitsu
|
Q9/15
|
2007-05-24 |
|
[ 489 ]
|
APS protocol for Ethernet Ring Protection (G.8032)
|
Fujitsu
|
Q9/15
|
2007-05-24 |
|
[ 488 ]
|
Comments and proposed modification for draft G.8132
|
Fujitsu
|
Q9/15
|
2007-05-24 |
|
[ 487 ]
|
Proposed work plan for Q9
|
Fujitsu
|
Q9/15
|
2007-05-24 |
|
[ 486 ]
|
Comments on APS MEG level in G.8032
|
Hitachi
|
Q9/15
|
2007-05-24 |
|
[ 485 ]
|
Proposal of text modification in G.8031
|
Hitachi
|
Q9/15
|
2007-05-24 |
|
[ 474 ]
|
A proposed modification to Signal Degrade in G.8031v2
|
ETRI
|
Q9/15
|
2007-05-24 |
|
[ 469 ]
|
1+1/1:1 protection switching mechanism for RMPS
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 468 ]
|
Requirement of partial protection switching for RMPS
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 465 ]
|
Proposal on OAM model and Ring APS for Ethernet ring protection
|
Huawei
|
Q9/15
|
2007-05-24 |
|
[ 464 ]
|
Proposal on OAM Model for T-MPLS SPRing
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 462 ]
|
Proposal for FC over T-MPLS
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 461 ]
|
Considerations in Sync Ethernet over OTN
|
Huawei Technologies Co., Ltd
|
Q13/15, Q11/15, Q9/15
|
2007-05-24 |
|
[ 459 ]
|
Connections between ring nodes on T-MPLS ring
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 440 ]
|
Clarification of EXER and RR operation on G.8031
|
NEC Corporation
|
Q9/15
|
2007-05-24 |
|
[ 439 ]
|
Proposal on the protection switching mechanisms on G.8032
|
NEC Corporation
|
Q9/15
|
2007-05-24 |
|
[ 428 ]
|
Proposed Mechanism of Ethernet Smart Ring Protection ( For G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2007-05-24 |
|
[ 424 ]
|
Comparing the extended linear protection mechanisms with the wrapping and steering in the T-MPLS ring
|
ZTE Corporation
|
Q9/15
|
2007-05-24 |
|
[ 423 ]
|
Applying the extended linear protection switching mechanisms in the T-MPLS ring
|
ZTE Corporation
|
Q9/15
|
2007-05-24 |
|
[ 393 ]
|
Completion of jitter specifications in G.783 and G.825 for 10 Gb/s and 40 Gb/s
|
Lucent Technologies Germany
|
Q9/15, Q13/15
|
2007-05-24 |
Results:62 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):