Contributions
[ AI/Question: Q4/13 ]
Number
Title
Source
AI/Question
Filter...
IPTV-GSI
Q15/13
Q2/13
Q5/11
Q8/13
Clear filter
Date
[ 551 ]
Proposal on adding study item and task in Q13/SG12 for IPTV performance monitoring
China Telecom
Q4/13 , IPTV-GSI
2008-01-11
[ 545 ]
Proposed General Architecture in Y.ngn-account-R2
ETRI
Q4/13 , Q2/13
2008-01-09
[ 543 ]
Proposed Modification of the Clause 9 Procedures in Y.mpm
ETRI
Q4/13
2008-01-08
[ 542 ]
(Rev.1)
Additional description on Rn and Rc reference point for y.racf-mpls centralized architecture
ETRI
Q4/13
2008-01-08
[ 541 ]
Proposed Modification of the Clause 7. Reference Measurement Network Model in Y.mpm
ETRI
Q4/13
2008-01-08
[ 537 ]
Proposed Modification of the Clause 8.3. Reference Points in Y.mpm
ETRI
Q4/13
2008-01-08
[ 536 ]
Proposed Modification of the Clause 8.2. Functional Architecture in Y.mpm
ETRI
Q4/13
2008-01-08
[ 535 ]
Proposed Modification of the Clause 8.1. General Architecture in Y.mpm
ETRI
Q4/13
2008-01-08
[ 515 ]
Proposed modifications to section 6.2 in Y.enet
ETRI
Q4/13
2008-01-08
[ 503 ]
Supplement to Appendix V in Y.RACF R2
ZTE Corporation
Q4/13
2008-01-08
[ 502 ]
Proposal to add the PD-FE selection function of TRC-FE and PE-FE
ZTE Corporation
Q4/13
2008-01-08
[ 501 ]
Proposal to add the function of processing the resource control granularity
ZTE Corporation
Q4/13
2008-01-08
[ 500 ]
Proposal to add new resource control scenarios for nomadism
ZTE Corporation
Q4/13
2008-01-08
[ 499 ]
Modification to the hand-over procedure
ZTE Corporation
Q4/13
2008-01-08
[ 498 ]
CPE-requested QoS resource reservation procedure triggered by TRE-FE
ZTE Corporation
Q4/13
2008-01-08
[ 490 ]
Proposed changes to resource control procedure consideration for Y.racf-mpls
ZTE Corporation
Q4/13
2008-01-08
[ 485 ]
Proposal on modification of Rn and TRE-FE of Y.RACF
ZTE Corporation
Q4/13
2008-01-08
[ 484 ]
Proposal on modification of function overview of Y.MPLS-RACF
ZTE Corporation
Q4/13
2008-01-08
[ 480 ]
Proposal for Resource Control Scenarios for Mobility in RACF
ZTE Corporation
Q4/13
2008-01-08
[ 478 ]
Modification to the procedure for pull mode in Y.RACF R2
ZTE Corporation
Q4/13
2008-01-08
[ 477 ]
Add a information component to Rs in Y.RACF R2
ZTE Corporation
Q4/13
2008-01-08
[ 454 ]
Initial Draft on Requirements for Flow Aggregate Parameter Exchange in NGN
ETRI
Q4/13
2008-01-07
[ 453 ]
Proposed initial document for RACF-MPLS for centralized architecture
ETRI
Q4/13
2008-01-07
[ 452 ]
(Rev.1)
Considerations on mobility aspects of clause 9.3 in Y.RACF(Y.2111)
ETRI
Q4/13
2008-01-07
[ 446 ]
Proposed changes to Appendix IV
Huawei Technologies Co., Ltd.
Q4/13
2008-01-07
[ 432 ]
Proposed to section 7 of RACF R2
Huawei Technologies Co., Ltd.
Q4/13
2008-01-07
[ 431 ]
Proposal for additional text on Resource Admission Control with mobility support
Huawei Technologies Co., Ltd.
Q4/13
2008-01-07
[ 429 ]
Proposal for additional scenario of resource control for multicast
Huawei Technologies Co., Ltd.
Q4/13
2008-01-07
[ 417 ]
Proposed texts to Rh interface
China Telecom, Huawei Technologies Co., Ltd
Q4/13 , Q5/11
2008-01-07
[ 404 ]
Mechanism for authenticating flow of bearer traffic in NGN (contribution to the draft Recommendation Y.NGN Security Mechanisms)
Lucent Technologies, USA
Q4/13 , Q15/13
2008-01-06
[ 403 ]
Enhance RACF procedures (Y.RACF R2) for Multicast Admission Control
Lucent Technologies
Q4/13
2008-01-06
[ 402 ]
Complement Information Components of Rp reference point in Y.RACF R2
Lucent Technologies
Q4/13
2008-01-06
[ 401 ]
Complement functional requirements of Rp reference point in Y.RACF R2
Lucent Technologies
Q4/13
2008-01-06
[ 400 ]
Modification of Multicast Admission Control Examples in Y.RACF R2
Lucent Technologies
Q4/13
2008-01-06
[ 399 ]
Proposed Revisions in Clause 1 (Scope), 5 (Conventions), 6 (Distributed RACF Architecture and Requirements), and Supporting Appendices for Y.RACF-DistribMPLS
AT&T
Q4/13
2008-01-06
[ 398 ]
Proposed Initial Text for Draft Recommendation Y.RACF-DistribMPLS
AT&T
Q4/13
2008-01-06
[ 397 ]
Proposal to Split Y.RACF-MPLS into Two Documents - Centralized Architecture & Distributed Architecture
AT&T & ETRI
Q4/13
2008-01-06
[ 381 ]
Proposals for requirements on inter-domain reference point (Ri) in RACF
KDDI Corporation
Q4/13
2008-01-06
[ 380 ]
Proposals of creating new appendix describing RACF distribution and reliable transaction handling
KDDI Corporation
Q4/13
2008-01-06
[ 379 ]
Proposal for multi-MPM communications based on RTP/RTCP in Y.mpm
KDDI Corporation
Q4/13
2008-01-06
[ 373 ]
Revised draft Recommendation Y.enet "Ethernet QoS control Next Generation Networks"
Korea (Republic of)
Q4/13
2008-01-07
[ 368 ]
Proposed modifications to Sections 7.3 and 7.4 of Y.enet
Korea (Republic of)
Q4/13
2008-01-07
[ 305 ]
Proposal Regarding Topology and Resource Information Retrieval in RACF-R2
Hitachi, Ltd.
Q4/13
2008-01-03
[ 273 ]
Updated draft for Y.mpls-racf
ETRI
Q4/13
2007-04-11
[ 272 ]
Improve self completeness of Y.flowreq
ETRI
Q4/13
2007-04-11
[ 271 ]
Proposal for initiating a work on Requirement for flow aggregation in Next generation networks
ETRI
Q4/13
2007-04-11
[ 258 ]
Proposed changes to security consideration for Y.123.qos
Huawei
Q4/13
2007-04-10
[ 257 ]
Multicasting Extension of NACF
Huawei
Q4/13
2007-04-10
[ 254 ]
Multicast Dynamic Scenario
Huawei
Q4/13
2007-04-10
[ 243 ]
Requirement of QoS Control in Metro network
ZTE
Q4/13
2007-04-10
Results:86 total items. Result page:
1 -
2
- Next
Multiple Document Download: Formats and Languages to be included (when available):