International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2008-01-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  C (2008-01-14) 

ITU-T SG13

Project management and coordination; Architectures and internetworking principles; Multi-protocol networks and mechanisms; Network performance and resource management

Study Period 2005

Meeting  from 2008-01-14 to 2008-01-25

held in Korea (Rep. of) [Seoul]

Other Meetings : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  2007-09-21  2007-04-16  2006-11-03  2006-07-17  2006-01-16  2005-08-29  2005-04-25  2004-12-07 

Results:43 total items.
Contributions  [ AI/Question: Q4/13 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 551 ]  
 
Proposal on adding study item and task in Q13/SG12 for IPTV performance monitoring     China Telecom   Q4/13, IPTV-GSI   2008-01-11
[ 545 ]  
 
Proposed General Architecture in Y.ngn-account-R2     ETRI   Q4/13, Q2/13   2008-01-09
[ 543 ]  
 
Proposed Modification of the Clause 9 Procedures in Y.mpm     ETRI   Q4/13   2008-01-08
[ 542 ]  
(Rev.1) 
Additional description on Rn and Rc reference point for y.racf-mpls centralized architecture     ETRI   Q4/13   2008-01-08
[ 541 ]  
 
Proposed Modification of the Clause 7. Reference Measurement Network Model in Y.mpm     ETRI   Q4/13   2008-01-08
[ 537 ]  
 
Proposed Modification of the Clause 8.3. Reference Points in Y.mpm     ETRI   Q4/13   2008-01-08
[ 536 ]  
 
Proposed Modification of the Clause 8.2. Functional Architecture in Y.mpm     ETRI   Q4/13   2008-01-08
[ 535 ]  
 
Proposed Modification of the Clause 8.1. General Architecture in Y.mpm     ETRI   Q4/13   2008-01-08
[ 515 ]  
 
Proposed modifications to section 6.2 in Y.enet     ETRI   Q4/13   2008-01-08
[ 503 ]  
 
Supplement to Appendix V in Y.RACF R2     ZTE Corporation   Q4/13   2008-01-08
[ 502 ]  
 
Proposal to add the PD-FE selection function of TRC-FE and PE-FE     ZTE Corporation   Q4/13   2008-01-08
[ 501 ]  
 
Proposal to add the function of processing the resource control granularity     ZTE Corporation   Q4/13   2008-01-08
[ 500 ]  
 
Proposal to add new resource control scenarios for nomadism     ZTE Corporation   Q4/13   2008-01-08
[ 499 ]  
 
Modification to the hand-over procedure     ZTE Corporation   Q4/13   2008-01-08
[ 498 ]  
 
CPE-requested QoS resource reservation procedure triggered by TRE-FE     ZTE Corporation   Q4/13   2008-01-08
[ 490 ]  
 
Proposed changes to resource control procedure consideration for Y.racf-mpls     ZTE Corporation   Q4/13   2008-01-08
[ 485 ]  
 
Proposal on modification of Rn and TRE-FE of Y.RACF     ZTE Corporation   Q4/13   2008-01-08
[ 484 ]  
 
Proposal on modification of function overview of Y.MPLS-RACF     ZTE Corporation   Q4/13   2008-01-08
[ 480 ]  
 
Proposal for Resource Control Scenarios for Mobility in RACF     ZTE Corporation   Q4/13   2008-01-08
[ 478 ]  
 
Modification to the procedure for pull mode in Y.RACF R2     ZTE Corporation   Q4/13   2008-01-08
[ 477 ]  
 
Add a information component to Rs in Y.RACF R2     ZTE Corporation   Q4/13   2008-01-08
[ 454 ]  
 
Initial Draft on Requirements for Flow Aggregate Parameter Exchange in NGN     ETRI   Q4/13   2008-01-07
[ 453 ]  
 
Proposed initial document for RACF-MPLS for centralized architecture     ETRI   Q4/13   2008-01-07
[ 452 ]  
(Rev.1) 
Considerations on mobility aspects of clause 9.3 in Y.RACF(Y.2111)     ETRI   Q4/13   2008-01-07
[ 446 ]  
 
Proposed changes to Appendix IV     Huawei Technologies Co., Ltd.   Q4/13   2008-01-07
[ 432 ]  
 
Proposed to section 7 of RACF R2     Huawei Technologies Co., Ltd.   Q4/13   2008-01-07
[ 431 ]  
 
Proposal for additional text on Resource Admission Control with mobility support     Huawei Technologies Co., Ltd.   Q4/13   2008-01-07
[ 429 ]  
 
Proposal for additional scenario of resource control for multicast     Huawei Technologies Co., Ltd.   Q4/13   2008-01-07
[ 417 ]  
 
Proposed texts to Rh interface     China Telecom, Huawei Technologies Co., Ltd   Q4/13, Q5/11   2008-01-07
[ 404 ]  
 
Mechanism for authenticating flow of bearer traffic in NGN (contribution to the draft Recommendation Y.NGN Security Mechanisms)     Lucent Technologies, USA   Q4/13, Q15/13   2008-01-06
[ 403 ]  
 
Enhance RACF procedures (Y.RACF R2) for Multicast Admission Control     Lucent Technologies   Q4/13   2008-01-06
[ 402 ]  
 
Complement Information Components of Rp reference point in Y.RACF R2     Lucent Technologies   Q4/13   2008-01-06
[ 401 ]  
 
Complement functional requirements of Rp reference point in Y.RACF R2     Lucent Technologies   Q4/13   2008-01-06
[ 400 ]  
 
Modification of Multicast Admission Control Examples in Y.RACF R2     Lucent Technologies   Q4/13   2008-01-06
[ 399 ]  
 
Proposed Revisions in Clause 1 (Scope), 5 (Conventions), 6 (Distributed RACF Architecture and Requirements), and Supporting Appendices for Y.RACF-DistribMPLS     AT&T   Q4/13   2008-01-06
[ 398 ]  
 
Proposed Initial Text for Draft Recommendation Y.RACF-DistribMPLS     AT&T   Q4/13   2008-01-06
[ 397 ]  
 
Proposal to Split Y.RACF-MPLS into Two Documents - Centralized Architecture & Distributed Architecture     AT&T & ETRI   Q4/13   2008-01-06
[ 381 ]  
 
Proposals for requirements on inter-domain reference point (Ri) in RACF     KDDI Corporation   Q4/13   2008-01-06
[ 380 ]  
 
Proposals of creating new appendix describing RACF distribution and reliable transaction handling     KDDI Corporation   Q4/13   2008-01-06
[ 379 ]  
 
Proposal for multi-MPM communications based on RTP/RTCP in Y.mpm     KDDI Corporation   Q4/13   2008-01-06
[ 373 ]  
 
Revised draft Recommendation Y.enet "Ethernet QoS control Next Generation Networks"     Korea (Republic of)   Q4/13   2008-01-07
[ 368 ]  
 
Proposed modifications to Sections 7.3 and 7.4 of Y.enet     Korea (Republic of)   Q4/13   2008-01-07
[ 305 ]  
 
Proposal Regarding Topology and Resource Information Retrieval in RACF-R2     Hitachi, Ltd.   Q4/13   2008-01-03
Results:43 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-27