International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2006-07-17 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  D (2006-07-17) 

ITU-T SG13

Next-generation networks

Study Period 2005

Meeting  from 2006-07-17 to 2006-07-28

held in Switzerland [Geneva]

Other Meetings : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  2008-01-14  2007-09-21  2007-04-16  2006-11-03  [ 2006-07-17 ]  2006-01-16  2005-08-29  2005-04-25  2004-12-07 

Results:41 total items.
Delayed Contributions  [ Source: ETRI ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 872 ]  
 
Proposed Texts on Candidate Protocols for Handover Management in HMF     ETRI   Q6/13   2006-07-12
[ 871 ]  
 
Proposed Texts on Cross-layer mechanism at Mobile terminal for heterogeneous access networks in HMF     ETRI   Q6/13   2006-07-12
[ 870 ]  
 
Proposed revision to Section 6, 7 and 8 of MMF (Generic framework of mobility management for systems beyond IMT-2000)     ETRI   Q6/13   2006-07-12
[ 862 ]  
 
An consideration on the mapping between LLM and ANs     ETRI   Q6/13   2006-07-11
[ 861 ]  
 
Proposed text for the revision of Rec.MMR 1.0     ETRI   Q6/13   2006-07-11
[ 853 ]  
 
Proposed Text for Introduction and Scope sections in Y.mpm     ETRI   Q4/13   2006-07-10
[ 850 ]  
 
Proposed a New Definition of a Functional Component in Y.FRA     ETRI   Q4/13, Q3/13   2006-07-10
[ 828 ]  
 
Proposed modification of service and functional requirements in Y.ngn-openenv     ETRI   Q2/13   2006-07-07
[ 827 ]  
 
Proposed texts for definitions section in Y.ngn-openenv     ETRI   Q2/13   2006-07-07
[ 826 ]  
 
Proposed global figure for open service environment capabilities in Y.ngn-openenv     ETRI   Q2/13   2006-07-07
[ 823 ]  
 
Proposal to split IP into Identifier and Locator in NGN     ETRI   Q3/13   2006-07-07
[ 808 ]  
 
Concept, frame format, and Control Procedure for DiffProbe     ETRI   Q5/13   2006-07-07
[ 805 ]  
 
Proposed Functional Architecture in Y.mpm     ETRI   Q4/13   2006-07-07
[ 804 ]  
 
Proposed modification and reallocation of the section 7.2 in Y.mpm     ETRI   Q4/13   2006-07-07
[ 803 ]  
 
Proposed Performance Management Overall Architecture in Y.mpm     ETRI   Q4/13   2006-07-07
[ 802 ]  
 
Proposed Rearrangement of "Annex A: Passive Measurement" in Y.mpm     ETRI   Q4/13   2006-07-07
[ 801 ]  
(Rev.1) 
IPv6 Protocols and their Functions in the NGN     ETRI   Q9/13   2006-07-07
[ 800 ]  
 
Revised Draft of Y.ipv6req "Service Requirements and Functional Capabilities of IPv6-based NGN     ETRI   Q9/13   2006-07-07
[ 799 ]  
 
Revised Draft of Y.ipv6multi (Framework of IPv6 Multi-homing for NGN)     ETRI   Q9/13   2006-07-07
[ 798 ]  
 
Correlation analysis of IPv6 Multi-homing with FRA     ETRI   Q9/13   2006-07-07
[ 797 ]  
 
Initial draft of Y.ipv6transit "Functional Requirements and Deployment Scenarios of NGN for IPv4/IPv6 transitional phases"     ETRI   Q9/13   2006-07-07
[ 796 ]  
(Rev.1) 
Functional Capabilities of the IPv6 Protocols and their Interfaces in the NGN     ETRI   Q9/13   2006-07-07
[ 795 ]  
 
Functional capabilities of IPv6 protocols for NGN Services/Application     ETRI   Q9/13   2006-07-07
[ 794 ]  
 
General Requirements of IPv6 protocols in NGN     ETRI   Q9/13   2006-07-07
[ 793 ]  
 
The added section 9.1 Functional scenarios of Y.mpls-mob (MPLS-based Mobility and QoS capabilities for NGN services)     ETRI (Korea, Rep. of)   Q2/13   2006-07-07
[ 792 ]  
 
Initial draft for Context-aware convergence services scenario over NGN     ETRI   Q8/13   2006-07-07
[ 767 ]  
 
Proposal on the updated texts of section 7 in Y.wsconv     ETRI   Q8/13   2006-07-06
[ 766 ]  
 
Proposal on the updated texts and figure of section 6.2 in Y.wsconv     ETRI   Q8/13   2006-07-06
[ 759 ]  
 
Proposal of detail description texts and some new items for "NGN Service Requirements for ID-based Applications (Y.idserv-reqts)"     ETRI   Q2/13   2006-07-06
[ 758 ]  
 
Considerations for IPv6 signaling to support RACF in NGN environments     ETRI   Q4/13, Q9/13   2006-07-06
[ 757 ]  
 
Proposed modifications of Section 7.3 on RACF in Y.ipv6sig     ETRI   Q9/13   2006-07-06
[ 756 ]  
 
Contribution for classification of handover management for Recommendation HMF (version 0.1)     ETRI   Q6/13   2006-07-06
[ 700 ]  
 
Proposal to modify texts for Recommendation MMR (version 1.0)     ETRI   Q6/13   2006-07-06
[ 699 ]  
 
Contribution to TR-enet for VPN service     ETRI   Q4/13   2006-07-06
[ 698 ]  
 
Proposal for modification of sub-clause 5.17 Open service environment of Y.NGN-R1-Reqts     ETRI   Q2/13   2006-07-06
[ 693 ]  
 
Proposal for separation of implementation part from Y.ngn-openenv     ETRI   Q2/13   2006-07-06
[ 692 ]  
 
Priority-based one-way Ethernet frame delay measurement scheme for the next version of Y.1731     ETRI   Q5/13   2006-07-06
[ 690 ]  
 
On the proposed frame loss measurement scheme for multicast service in multipoint connectivity     ETRI   Q5/13   2006-07-06
[ 681 ]  
 
Editorial comments for Y.RACF     ETRI   Q4/13   2006-07-06
[ 680 ]  
 
Clarification of the behaviour of path-coupled signalling in push mode in Y.RACF     ETRI   Q4/13   2006-07-06
[ 582 ]  
 
MPLS OAM based SLA Performance Parameters Monitoring     ETRI   Q5/13   2006-07-04
Results:41 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26