International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG11  C 

ITU-T SG11

Signalling requirements and protocols

Study Period 2005

Results:145 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 145 ]  
 
Proposal of Peer-to-Peer Approach for Distributed Content Distribution     Huawei Technologies Co., Ltd.   Q7/11, Q3/13, Q3/11, Q2/13, Q1/11, IPTV-GSI   2008-01-11
[ 144 ]  
 
Proposal on IGMP Filter in DOC-0190     China Telecom   Q3/13, Q2/13, Q2/11, Q1/11, IPTV-GSI   2008-01-11
[ 143 ]  
 
Add interactions with other services to the draft of Q.CRBT_CRT     ZTE Corporation   2/11, 3/11   2008-01-09
[ 142 ]  
 
Add IMS signalling requirement for CRT to the draft of Q.CRBT_CRT     ZTE Corporation   2/11, 3/11   2008-01-09
[ 141 ]  
 
Add IMS signalling requirement for CRBT to the draft of Q.CRBT_CRT     ZTE Corporation   2/11, 3/11   2008-01-09
[ 140 ]  
 
Add of References to the draft of Q.CRBT_CRT     ZTE Corporation   2/11, 3/11   2008-01-09
[ 139 ]  
 
Add interaction between CDIVN and OIR/TIR     ZTE Corporation   3/11   2008-01-09
[ 138 ]  
 
Add service/signalling flows for CRBT/CRT to the draft of Q.CRBT_CRT     ZTE Corporation   2/11, 3/11   2008-01-09
[ 137 ]  
 
Modifications to the draft of Q.ECT     ZTE Corporation   3/11   2008-01-09
[ 136 ]  
 
SIP-ISDN and SIP-SIP Network Integration Tests     Telekom Austria TA   8/11   2008-01-08
[ 135 ]  
 
Q.1912.5 Conformance tests     Telecom Austria TA   8/11   2008-01-08
[ 134 ]  
 
Additional call flows for Q.UNI profile     ETRI   3/11   2008-01-08
[ 133 ]  
 
Call flows for Q.3401 Amendment A     ETRI   3/11   2008-01-08
[ 132 ]  
 
Extensions for early media in Q.UNI profile     ETRI   3/11   2008-01-08
[ 131 ]  
 
Extensions for early media in Q.3401 Amendment A     ETRI   3/11   2008-01-08
[ 130 ]  
 
Proposed ToR extension for Q.7/11 in the next study period (2009 - 2012)     ETRI   7/11   2008-01-08
[ 129 ]  
 
Appropriate range of ANM response time at inter-operator ISUP     ETRI   3/11   2008-01-08
[ 128 ]  
 
Analysis about the difference of NACF R1 and R2     ETRI   7/11   2008-01-08
[ 127 ]  
 
Proposal for SG11 work scope for the next study period     Korea (Republic of)   ALL/11   2008-01-08
[ 126 ]  
 
Proposal for expanded scope to Q.2/11     Korea (Republic of)   2/11   2008-01-08
[ 125 ]  
 
Revised texts of Draft Recommendation Q.nacp.S-TC1     Korea (Republic of)   7/11   2008-01-08
[ 124 ]  
 
Proposal for adding new text of Q.NGN-trx.profile     Korea (Republic of)   7/11   2008-01-08
[ 123 ]  
 
Draft Recommendation Q.nacf.auth1 "Authentication Protocols based on EAP-AKA for Interworking among 3GPP, WiMax, and WLAN in NGN"     Korea (Republic of)   7/11   2008-01-08
[ 122 ]  
 
Proposal on the updated texts in draft Q.nacp.S-TC1     KT   7/11   2008-01-08
[ 121 ]  
 
Proposed texts on service model for Q.CRBT_CRT     KT   2/11, 3/11   2008-01-08
[ 120 ]  
 
Proposed texts on service description and architecture for Q.CRBT_CRT     KT   2/11, 3/11   2008-01-08
[ 119 ]  
 
Proposed updates to TRQ.rsf     MII, People?s Republic of China, Huawei Technologies Co., Ltd.   5/11   2008-01-08
[ 118 ]  
 
Proposed texts to Rt interface     MII, People's Republic of China   5/11   2008-01-08
[ 117 ]  
 
Proposed texts on clause 9.3 of Rs interface     MII, People's Republic of China   5/11   2008-01-08
[ 116 ]  
 
Propose to consent Draft Recommendation Q.NGN-trx.profile at January 2008 SG 11 Meeting     China Telecom   7/11   2008-01-08
[ 115 ]  
 
Proposal to revise Q.2/11     Huawei Technologies Co,. Ltd.   2/11   2008-01-08
[ 114 ]  
 
Propose for CRT service flow in IMS (download)     Huawei Technologies Co.,Ltd.   2/11, 3/11   2008-01-08
[ 113 ]  
 
Propose for CRT service flow in IMS     Huawei Technologies Co.,Ltd.   2/11, 3/11   2008-01-08
[ 112 ]  
 
Propose for CRBT service flow in IMS     Huawei Technologies Co.,Ltd.   2/11, 3/11   2008-01-08
[ 111 ]  
 
Proposed texts to Q.NACF.mob0     Huawei Technologies Co., Ltd.   7/11   2008-01-08
[ 110 ]  
 
Draft of Q.3306.1 (Q.rcp6) update     Telekomunikacja Polska (Poland)   5/11   2008-01-08
[ 109 ]  
 
Proposed additions for handbook clauses     Telekomunikacja Polska (Poland)   6/11   2008-01-08
[ 108 ]  
 
Proposals of new questions under study for 2009-2012 Study Period from Q.8/11 responsibilities     Telecommunication Administration of the Russian Federation   8/11   2008-01-08
[ 107 ]  
 
Inexpediency of association of the SG11, SG13 and SG19     Telecommunication Administration of the Russian Federation   8/11   2008-01-08
[ 106 ]  
 
Call to develop a Signalling Recommendation supporting Flow State Aware Resource Control     Anagran Inc.   5/11   2008-01-07
[ 105 ]  
 
Considerations regarding security requirements associated with draft Recommendation Q.3304.1     Nortel Networks (Canada)   5/11   2008-01-07
[ 104 ]  
 
Consideration of the configuration and scope of Rh reference point     ETRI   5/11   2008-01-07
[ 103 ]  
 
Additional text to Q.3308 (Rh reference point)     ETRI   5/11   2008-01-07
[ 102 ]  
 
The consideration of the baseline protocol for the Rh reference point     ETRI   5/11   2008-01-07
[ 101 ]  
 
Proposed texts to Rh interface     China Telecom, Huawei Technologies Co., Ltd.   5/11, 4/13   2008-01-07
[ 100 ]  
 
Signaling requirement for Mobility and Handover Control Function     ETRI   1/11   2008-01-07
[ 99 ]  
 
Proposed updates to Ri interface     China Telecom, Huawei Technologies   5/11   2008-01-07
[ 98 ]  
 
Proposed work item on use of pre-congestion notification (PCN) for resource control     Huawei Technologies, BT   5/11   2008-01-07
[ 97 ]  
 
Proposal of creating a draft Rec. for Admission Control Coordination     British Telecom, Huawei Technologies Co., Ltd.   5/11   2008-01-07
[ 96 ]  
 
Proposed revised text of Q.4/11 description     NTT Comware Corporation   4/11   2008-01-07
Results:145 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2008-01-09