International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting 2006-07-24 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG11  D (2006-07-24) 

ITU-T SG11

Signalling requirements and protocols

Study Period 2005

Meeting  from 2006-07-24 to 2006-07-28

held in Switzerland [Geneva]

Other Meetings : 2009-01-19  2008-09-12  2008-09-05  2008-01-16  2007-09-21  2007-04-23  2006-11-03  [ 2006-07-24 ]  2006-01-23  2005-09-05  2005-05-02  2004-12-06 

Results:20 total items.
Delayed Contributions  [ AI/Question: 5/11 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 182 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - H.248 Pull Mode Package     Alcatel   5/11   2006-07-13
[ 181 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - Comments and Update Proposals     Alcatel   5/11   2006-07-13
[ 180 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - H.248 CoS Package     Alcatel   5/11   2006-07-13
[ 179 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - Clarifications for VLAN Package     Alcatel   5/11   2006-07-13
[ 178 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - Clarifications for Inactivity Timer Package     Alcatel   5/11   2006-07-13
[ 177 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - H.248 Events nt/netfail, nt/qualert & qac/qualertcease     Alcatel   5/11   2006-07-13
[ 176 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.15 SDP Information Elements     Alcatel   5/11   2006-07-13
[ 175 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - PE-FE Overload Control (H.248.11 vs H.248.10)     Alcatel   5/11   2006-07-13
[ 174 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.12 Transport     Alcatel   5/11   2006-07-13
[ 173 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.4 Connection Model     Alcatel   5/11   2006-07-13
[ 172 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.3 Protocol Version     Alcatel   5/11   2006-07-13
[ 171 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.17 Procedures     Alcatel   5/11   2006-07-13
[ 170 ]  
 
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.1 Profile Identification     Alcatel   5/11   2006-07-13
[ 163 ]  
 
Editor's proposals for modification of Q.rcp.2 Part I     China Telecom   5/11   2006-07-12
[ 158 ]  
 
PD-PE - Stateful or Stateless     Reliance Infocomm Ltd., India   5/11   2006-07-12
[ 146 ]  
 
Proposal for documentation of the signalling architecture for resource signalling     Nortel Networks (Canada)   1/11, 5/11   2006-07-11
[ 145 ]  
 
Proposal for signalling requirements for gate control interfaces in Draft Q.ncap2     Korea (Republic of)   5/11   2006-07-11
[ 135 ]  
 
Editor's revision     MII, People's Republic of China   5/11   2006-07-10
[ 134 ]  
 
Modification for supporting NAPT control function     MII, People's Republic of China   5/11   2006-07-10
[ 128 ]  
 
Proposed modifications to the Draft Recommendation Q.rcp.4SNMP     NEC Corporation   5/11   2006-07-06
Results:20 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-7