Delayed Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 182 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - H.248 Pull Mode Package
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 181 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - Comments and Update Proposals
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 180 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - H.248 CoS Package
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 179 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - Clarifications for VLAN Package
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 178 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - Clarifications for Inactivity Timer Package
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 177 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - H.248 Events nt/netfail, nt/qualert & qac/qualertcease
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 176 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.15 SDP Information Elements
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 175 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - PE-FE Overload Control (H.248.11 vs H.248.10)
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 174 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.12 Transport
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 173 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.4 Connection Model
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 172 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.3 Protocol Version
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 171 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.17 Procedures
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 170 ]
|
Q.rcp.3 Annex B "H.248 Rw Profile" - § 5.1 Profile Identification
|
Alcatel
|
5/11
|
2006-07-13 |
|
[ 169 ]
|
Proposal for organization of handbook
|
Telekomunikacja Polska (Poland)
|
6/11
|
2006-07-13 |
|
[ 168 ]
|
UNI use case for interoperating with the PSTN
|
AT&T
|
3/11, 1/11
|
2006-07-12 |
|
[ 167 ]
|
Proposed Additions to the draft SIP UNI Specification
|
Verizon
|
3/11
|
2006-07-12 |
|
[ 166 ]
|
Proposed Reference Model Figure for AEP Supplement
|
AT&T
|
3/11, 1/11
|
2006-07-12 |
|
[ 165 ]
|
Proposal for references to test specifications of NGN protocols
|
Telekomunikacja Polska S.A.
|
8/11
|
2006-07-12 |
|
[ 164 ]
|
A proposal to add some contents to section 7 in draft Q.NGN-trx.profile
|
China Telecom
|
7/11
|
2006-07-12 |
|
[ 163 ]
|
Editor's proposals for modification of Q.rcp.2 Part I
|
China Telecom
|
5/11
|
2006-07-12 |
|
[ 162 ]
|
Proposed texts for section 7.3 of draft Q.uni
|
China Telecom
|
3/11
|
2006-07-12 |
|
[ 161 ]
|
A proposal to add some contents to section 5 in draft Q.sup_req
|
China Telecom
|
3/11
|
2006-07-12 |
|
[ 160 ]
|
Reorganize user data for IP Multimedia Subsystem in Q.user_data
|
China Telecom
|
2/11
|
2006-07-12 |
|
[ 159 ]
|
Some proposals to Q.user_data
|
China Telecom
|
2/11
|
2006-07-12 |
|
[ 158 ]
|
PD-PE - Stateful or Stateless
|
Reliance Infocomm Ltd., India
|
5/11
|
2006-07-12 |
|
[ 157 ]
|
Technical amendments to the Q.NNI_profile
|
NTT Corporation
|
3/11
|
2006-07-12 |
|
[ 156 ]
|
Editorial amendments to the Q.NNI_profile
|
NTT Corporation
|
3/11
|
2006-07-12 |
|
[ 155 ]
|
Proposal for the approval of Q.NNI_profile
|
NTT Corporation
|
3/11
|
2006-07-12 |
|
[ 154 ]
|
Discussion on prospective study items for NGN signalling for broadband services
|
NTT Comware Corporation
|
1/11
|
2006-07-12 |
|
[ 153 ]
|
Comments on Support of Aggregated Endpoints
|
LM Ericsson
|
3/11
|
2006-07-12 |
|
[ 152 ]
|
Comments on NGN NNI Signalling Profile
|
LM Ericsson
|
3/11
|
2006-07-12 |
|
[ 151 ]
|
Clarification of the term "static and dynamic user data"
|
Huawei Technologies Co.,Ltd.
|
2/11
|
2006-07-11 |
|
[ 150 ]
|
Some Clarification on user data
|
Huawei Technologies Co.,Ltd.
|
2/11
|
2006-07-11 |
|
[ 149 ]
|
Discussion-user-data-for-CS PES
|
Huawei Technologies Co.,Ltd.
|
2/11
|
2006-07-11 |
|
[ 148 ]
|
Proposed texts for section 7.1 and 7.2 to draft Q.uni
|
Huawei Technologies Co.,Ltd.
|
3/11
|
2006-07-11 |
|
[ 147 ]
|
Proposed addition to service user profile in Q.user_data
|
KT
|
2/11
|
2006-07-11 |
|
[ 146 ]
|
Proposal for documentation of the signalling architecture for resource signalling
|
Nortel Networks (Canada)
|
1/11, 5/11
|
2006-07-11 |
|
[ 145 ]
|
Proposal for signalling requirements for gate control interfaces in Draft Q.ncap2
|
Korea (Republic of)
|
5/11
|
2006-07-11 |
|
[ 144 ]
|
Proposed addition to pre-authentication methods of Draft new baseline text for Q.NGN-nacf.sec
|
Korea (Republic of)
|
7/11
|
2006-07-11 |
|
[ 143 ]
|
Proposed addition of transport stratum user profile in draft Q.NGN-trx.profile
|
Korea (Republic of)
|
7/11
|
2006-07-11 |
|
[ 142 ]
|
Proposal for a new recommendation for requirements and protocol at the interface between the Transport Location Management Functional Entity(TLM-FE) and Service Control Entities
|
Korea (Republic of)
|
7/11
|
2006-07-11 |
|
[ 141 ]
|
Proposal to change Y.mplstcpi Appendix I to a Normative Annex
|
United States of America
|
4/11
|
2006-07-10 |
|
[ 140 ]
|
Proposed new section on Virtual Trunk OAM in Y.mplstcpi
|
United States of America
|
4/11
|
2006-07-10 |
|
[ 139 ]
|
Proposed changes to signalling procedures and new section Virtual Trunk Setup and Maintenance in Y.mplstcpi
|
United States of America
|
4/11
|
2006-07-10 |
|
[ 138 ]
|
Proposed changes to Y.mplsccpi
|
United States of America
|
4/11
|
2006-07-10 |
|
[ 137 ]
|
New proposed sections Virtual Trunk Procedures - Integrated implementation in Y.mplstcpi
|
United States of America
|
4/11
|
2006-07-10 |
|
[ 136 ]
|
Consent for some documents
|
MII, People's Republic of China
|
ALL/11
|
2006-07-10 |
|
[ 135 ]
|
Editor's revision
|
MII, People's Republic of China
|
5/11
|
2006-07-10 |
|
[ 134 ]
|
Modification for supporting NAPT control function
|
MII, People's Republic of China
|
5/11
|
2006-07-10 |
|
[ 133 ]
|
Procedure requirements for Cx Interface between S-CSCF and UPSF in Q.sup_req
|
CATR, MII (People's Republic of China)
|
3/11
|
2006-07-10 |
Results:64 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):