International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG06 : Meeting 2008-04-14 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG06  TD (2008-04-14) 

ITU-T SG06

Outside plant and related indoor installations

Study Period 2005

Meeting  from 2008-04-14 to 2008-04-18

held in China [Wuhan]

Other Meetings : 2009-10-12  2008-12-01  [ 2008-04-14 ]  2007-11-19  2007-05-14  2006-09-19  2005-12-12  2005-01-31 

Results:4 total items.
Temporary Documents  (GEN)  [ Source: Rapporteur Q5/6 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 384-GEN ]  
 
Draft new ITU-T Recommendation L.coloop "Copper loop requirements for a various technologies including indoor and structured cabling"     Rapporteur Q5/6   Q5/6   2008-04-18
[ 379-GEN ]  
 
Study plan of Q5/6 for the next study period     Rapporteur Q5/6   Q5/6   2008-04-18
[ 342-GEN ]  
(Rev.1-3) 
Draft new ITU-T Recommendation L.coacc "Test, acceptance and maintenance methods of copper subscriber pairs" (for consent)     Rapporteur Q5/6   Q5/6   2008-04-03
[ 341-GEN ]  
(Rev.1-2) 
Draft new ITU-T Recommendation L.coloop "Copper loop requirements for a various technologies including indoor and structured cabling" (for consent)     Rapporteur Q5/6   Q5/6   2008-04-03
Results:4 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-29