International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG06 : Meeting 2008-04-14 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG06  TD (2008-04-14) 

ITU-T SG06

Outside plant and related indoor installations

Study Period 2005

Meeting  from 2008-04-14 to 2008-04-18

held in China [Wuhan]

Other Meetings : 2009-10-12  2008-12-01  [ 2008-04-14 ]  2007-11-19  2007-05-14  2006-09-19  2005-12-12  2005-01-31 

Results:66 total items.
Result page:  1 - 2  - Next Next
Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 388-GEN ]  
 
Reply LS to Q1/15 on update on access network activities in SG 6     SG6 Chairman   QALL/6   2008-05-06
[ 387-GEN ]  
 
Mandate for SG6 Study Period 2009 - 2012     Chairman SG6   QALL/6   2008-04-29
[ 386-GEN ]  
 
Draft Report of the sixth meeting of Study Group 6 "Outside plant and related indoor installations" (Wuhan, 14-18 April 2008)     ITU-T Study Group 6   QALL/6   2008-05-07
[ 385-GEN ]  
(Rev.1) 
SG6 restructuring discussions     Chairman SG6   QALL/6   2008-04-29
[ 384-GEN ]  
 
Draft new ITU-T Recommendation L.coloop "Copper loop requirements for a various technologies including indoor and structured cabling"     Rapporteur Q5/6   Q5/6   2008-04-18
[ 383-GEN ]  
(Rev.1) 
Draft WP 2/6 Report (Application of products)     Chairman WP 2/6   Q9/6, Q8/6, Q7/6, Q6/6, Q5/6   2008-04-18
[ 382-GEN ]  
(Rev.1) 
Study plan of Q1/6 for the next study period     Rapporteur Q1/6   Q1/6   2008-04-18
[ 381-GEN ]  
(Rev.1) 
Draft WP 1/6 Report (Infrastructures and Environment)     Chairman WP 1/6   Q4/6, Q3/6, Q2/6, Q1/6   2008-04-18
[ 380-GEN ]  
 
Revised text for consent : L.18 Sheath closures for terrestrial copper telecommunication cables     Rapporteur Q9/6   Q9/6   2008-04-18
[ 379-GEN ]  
 
Study plan of Q5/6 for the next study period     Rapporteur Q5/6   Q5/6   2008-04-18
[ 378-GEN ]  
 
Study plan of Q7/6 for the next study period     Rapporteur Q7/6   Q7/6   2008-04-18
[ 377-GEN ]  
 
Study plan of Q8/6 for the next study period     Rapporteur Q8/6   Q8/6   2008-04-18
[ 376-GEN ]  
 
Study plan of Q6/6 for the next study period     Rapporteur Q6/6   Q6/6   2008-04-18
[ 375-GEN ]  
 
LS - New recommendation for optical cabling systems in building     IEC SC46C   Q2/6   2008-04-17
[ 374-GEN ]  
(Rev.1) 
Draft proposal for Q9 working plan for next study period     Rapporteur Q9/6   Q9/6   2008-04-17
[ 373-GEN ]  
 
Work plan proposal for Question 4/6 for next Study Period     Rapporteur Q4/6   Q4/6   2008-04-17
[ 372-GEN ]  
(Rev.1) 
Reply to LS on proposed breakdown of the ITU-T Focus Group on IdM Use Case Gap Analysis     ITU-T SG6   QALL/6   2008-04-17
[ 371-GEN ]  
 
Reply to LS on SG 5 questions for the Study Period 2009-2012     ITU-T SG6   QALL/6   2008-04-17
[ 370-GEN ]  
(Rev.1) 
LISTE FINALE DES PARTICIPANTS - FINAL LIST OF PARTICIPANTS - LISTA FINAL DE PARTICIPANTES     TSB   QALL/6   2008-04-17
[ 369-GEN ]  
(Rev.1) 
Optical drop development under Brazilian conditions     Rapporteur Q7/6   Q7/6   2008-04-15
[ 368-GEN ]  
(Rev.1) 
Answers to the Questionnaire on Korean experience on access network installation procedures (TSB Circular 198)     Rapporteur Q2/6   Q2/6   2008-04-15
[ 367-GEN ]  
 
Preliminary Framework for further detailed Discussion of ITU-T Study Group restructuring     Convenor, ad hoc group on restructuring   QALL/6   2008-04-15
[ 366-GEN ]  
 
Report of Teleconference on ITU-T SG Restructuring (April 2-4, 2008)     TSB   QALL/6   2008-04-15
[ 365-GEN ]  
 
Proposed wording and work plan for the next Study Period to Q.3/6 "Technical aspects of unbundling and sharing of outside plant elements in networks"     Rapporteur Q3/6   Q3/6   2008-04-15
[ 364-GEN ]  
 
Answers to questionnaire on "Technical Aspects Related to Unbundling of Network Elements"     Rapporteur Q3/6   Q3/6   2008-04-15
[ 363-GEN ]  
 
Status of texts under WTSA-04 Resolution 1 Procedures     TSB   QALL/6   2008-04-15
[ 362-GEN ]  
 
Initial list of Temporary Documents for Study Group 6 meeting (Wuhan, 14-18 April 2008)     TSB   QALL/6   2008-04-15
[ 361-GEN ]  
 
Work Programme for Study Group 6     TSB   QALL/6   2008-04-15
[ 360-GEN ]  
 
List of Report(s) and Contributions for Study Group 6 meeting (Wuhan, 14-18 April 2008)     TSB   QALL/6   2008-04-15
[ 359-GEN ]  
 
Information for the Study Group 6 Meeting     TSB   QALL/6   2008-04-15
[ 358-GEN ]  
 
Draft Agenda and Work Plan for Study Group 6 Meeting     TSB   QALL/6   2008-04-15
[ 357-GEN ]  
 
Draft new Recommendation on "Management of poles carrying overhead telecommunications lines"     Rapporteur Q2/6   Q2/6   2008-04-14
[ 356-GEN ]  
 
Preservation of Wooden Poles Carrying Overhead Telecommunication Lines-Rev     Rapporteur Q 1/6   Q1/6   2008-04-14
[ 355-GEN ]  
 
Classification Outside Plant Waste-Rev     Rapporteur Q1/6   Q1/6   2008-04-14
[ 354-GEN ]  
 
Answers to the Questionnaire on Korean experience on access network installation procedures (TSB Circular 198)     Rapporteur Q2/6   Q2/6   2008-04-14
[ 353-GEN ]  
 
 
Document withdrawn
 
N/A     2008-04-07
[ 352-GEN ]  
 
Liaison report of the October meeting of SC86A     Liaison Officer for IEC SC86A   Q9/6   2008-04-06
[ 351-GEN ]  
 
IEEE OUI assignment for ITU-T     ITU-T SG15   QALL/6   2008-04-04
[ 350-GEN ]  
 
Revision of G.650.3     Rapporteur Q5/15   Q9/6, Q8/6, Q7/6, Q6/6, Q5/6   2008-04-04
[ 349-GEN ]  
 
Deletion of G.651     ITU-T SG15   Q9/6, Q8/6, Q7/6, Q6/6, Q5/6   2008-04-04
[ 348-GEN ]  
 
G.Sup42 "Guide on the use of the ITU-T Recommendations related to Optical Technology"     ITU-T SG15   Q9/6, Q8/6, Q7/6, Q6/6, Q5/6   2008-04-04
[ 347-GEN ]  
 
Reply to LS on update on access network activities in SG6     ITU-T SG15   QALL/6   2008-04-04
[ 346-GEN ]  
 
New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan.     ITU-T SG15   QALL/6   2008-04-04
[ 345-GEN ]  
 
Draft new Recommendation G.hnta - Generic Home Network Transport Architecture     ITU-T SG15   QALL/6   2008-04-04
[ 344-GEN ]  
 
 
Document withdrawn
 
N/A   Q4/6   2008-04-04
[ 343-GEN ]  
(Rev.1) 
Draft new recomm. "Operations support system requirements for infrastructure and network elements management using ID technology" (for consent)     Rapporteur Q4/6   Q4/6   2008-04-03
[ 342-GEN ]  
(Rev.1-3) 
Draft new ITU-T Recommendation L.coacc "Test, acceptance and maintenance methods of copper subscriber pairs" (for consent)     Rapporteur Q5/6   Q5/6   2008-04-03
[ 341-GEN ]  
(Rev.1-2) 
Draft new ITU-T Recommendation L.coloop "Copper loop requirements for a various technologies including indoor and structured cabling" (for consent)     Rapporteur Q5/6   Q5/6   2008-04-03
[ 340-GEN ]  
 
Liaison on a three party query response IdM model     JCA-IdM Co-convenors   QALL/6   2008-03-17
[ 339-GEN ]  
 
Liaison on a proposed breakdown of the ITU-T Focus Group on IdM Use Case Gap Analysis     JCA-IdM Co-convenors   QALL/6   2008-03-17
Results:66 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2008-04-29