International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN GSI : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN GSI  C 

ITU-T NGN GSI

NGN Global Standards Initiative

Study Period 2005

Results:144 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  [ Source: ZTE ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1296 ]  
 
Proposal for Updating CMR CS-based Deployment Model     ZTE Corp.   Q8/13   2008-08-27
[ 1295 ]  
 
Proposal for Updating CMR IMS-based Deployment Model     ZTE Corp.   Q8/13   2008-08-27
[ 1294 ]  
 
Proposal for Refining CMR Convergence Deployment Model     ZTE Corp.   Q8/13   2008-08-27
[ 1293 ]  
 
Proposal for Refining CMR Summary     ZTE Corp.   Q8/13   2008-08-27
[ 1292 ]  
 
Proposal for Refining CMR General Description     ZTE Corp.   Q8/13   2008-08-27
[ 1291 ]  
 
Proposal for Updating CMR Definitions Clause     ZTE Corp.   Q8/13   2008-08-27
[ 1290 ]  
 
Proposal for Updating CMR Principles     ZTE Corp.   Q8/13   2008-08-27
[ 1289 ]  
 
The Rh reference point     China Telecom, CATR, ZTE Corp.   Q4/13   2008-08-27
[ 1288 ]  
 
Proposal for Updating CMR Scope     ZTE Corp.   Q8/13   2008-08-27
[ 1287 ]  
 
Proposal for Updating CMR QoS, Charging,and Security Clauses     ZTE Corp.   Q8/13   2008-08-27
[ 1285 ]  
 
Some clarifications for media independent mobility security for NGN     ZTE Corporation   Q15/13   2008-08-27
[ 1266 ]  
 
Propose to remove clause 9.2 & 9.3 and related editor?s note     ZTE Corp., China Mobile   Q6/13, Q5/19   2008-08-27
[ 1265 ]  
 
Propose to modify the Annex A of Q.FMC-IMS     ZTE Corp., China Mobile   Q6/13, Q5/19   2008-08-27
[ 1264 ]  
 
Example of implementation of RACF for CPN Gateways     China Telecocm, ZTE Corp.   Q4/13   2008-08-27
[ 1263 ]  
 
Enhancement of FRA R2     ZTE Corp.   Q3/13   2008-08-27
[ 1262 ]  
 
Proposed to add network security information handling in NACF(Y.2014)     ZTE Corp.   Q15/13, Q3/13   2008-08-27
[ 1261 ]  
 
Proposed to add network security information handling in RACF     ZTE Corp.   Q15/13, Q4/13   2008-08-27
[ 1260 ]  
 
Proposed to add the procedure explanation for Figure 17 and 18 (Pull mode)     ZTE Corp.   Q4/13   2008-08-27
[ 1259 ]  
 
Proposed to add the procedure explanation for Figure 7 (Push mode)     ZTE Corp.   Q4/13   2008-08-27
[ 1243 ]  
 
Proposed to add the nomadism scenario in Y.RACF (Y.2111)     ZTE Corp.   Q4/13   2008-08-26
[ 1242 ]  
 
Proposed to add the description for resource control scenarios for nomadism     ZTE Corp.   Q4/13   2008-08-26
[ 1241 ]  
 
Proposal for Transport Separation of IP into identifier and locator Execution Function for Y.FAipsplit     ZTE Corp.   Q3/13   2008-08-26
[ 1240 ]  
 
Proposal for the information flow of the Y.FAipsplit     ZTE Corp.   Q3/13   2008-08-26
[ 1239 ]  
 
Proposal for the high level functions of Y.FAipsplit     ZTE Corp.   Q3/13   2008-08-26
[ 1238 ]  
 
Proposal for the architecture model of Y.FAipsplit     ZTE Corp.   Q3/13   2008-08-26
[ 1237 ]  
 
Proposal for new work Item of Y.FAipsplit, " Functional Architecture of ipsplit in NGN "     ZTE Corp.   Q3/13   2008-08-26
[ 1236 ]  
 
Call Centre Service Scenario and Deployment Model over NGN     China Telecom, ZTE Corp.   Q8/13   2008-08-26
[ 1235 ]  
 
Propose Security Considerations in Y.MMCF     ZTE Corp.   Q15/13, Q3/13   2008-08-26
[ 1117 ]  
 
Proposed to add 'Traffic-Information' AVP over Rw reference     ZTE Corporation, CATR, MIIT   Q5/11   2008-08-22
[ 1116 ]  
 
Proposed to add 'Rule-Failure-Code' AVP over Rw reference     ZTE Corporation, CATR, MIIT   Q5/11   2008-08-22
[ 1115 ]  
 
Proposed to add 'Acceptable-Service-Info' AVP over Ri reference     ZTE Corporation, CATR, MIIT   Q5/11   2008-08-22
[ 935 ]  
 
The Rh' reference point     ZTE Corporation   Q4/13   2008-05-04
[ 934 ]  
 
The Procedure of the Distributed PD-FE Architecture     ZTE Corporation   Q4/13   2008-05-04
[ 933 ]  
 
The Functions of the HPE-FE     ZTE Corporation   Q4/13   2008-05-04
[ 932 ]  
 
Proposing another solution to locate visited TLM-FE     ZTE Corporation   Q3/13   2008-05-04
[ 931 ]  
 
Proposed Clarification and Rewording of Y.cmr     ZTE Corporation   Q8/13   2008-05-05
[ 930 ]  
 
Proposed network layer handover procedure for Y.RACF     ZTE Corporation   Q4/13   2008-05-04
[ 929 ]  
 
Proposed impact of security on QoS performance in Y.Secmechanisms     ZTE Corporation   Q15/13   2008-05-04
[ 928 ]  
 
Proposed impact of security on QoS performance in Y.racf R2     ZTE Corporation   Q15/13, Q4/13   2008-05-04
[ 927 ]  
 
Propose the location of functional entity supporting Layer-3 mobility for Y.MCFArch     ZTE Corporation   Q3/13   2008-05-04
[ 926 ]  
 
Proposal to move the PD-FE selection mechanism to a right section in Y.RACF (Y.2111)     ZTE Corporation   Q4/13   2008-05-04
[ 925 ]  
 
Proposal to modification to section GSC-FE of Draft Recom. Y.NGN-FRA R2     ZTE Corporation   Q3/13   2008-05-04
[ 924 ]  
 
Proposal to modification to section 8.2 of Y.ngn-accounting R2     ZTE Corporation   Q2/13   2008-05-04
[ 923 ]  
 
Proposal to add the clarification in Figure 20 in Y.RACF (Y.2111)     ZTE Corporation   Q4/13   2008-05-04
[ 922 ]  
 
A Proposal on studying Next Generation Call Centre Technology in NGN     China Telecom, ZTE Corporation   Q2/13   2008-05-05
[ 921 ]  
 
Proposal of some modifications and addition to the draft Recommendation Q.LMF     ZTE Corporation   Q2/19, Q5/13   2008-05-04
[ 920 ]  
 
Proposal for initiating the study on IP based mobility security for NGN     ZTE Corporation   Q15/13   2008-05-05
[ 919 ]  
 
Proposal for host based mobility control scenarios and procedures for Y.MCFArch     ZTE Corporation   Q3/13   2008-05-04
[ 918 ]  
 
Proposal for adding a mobility support scenario in RACF     ZTE Corporation   Q4/13   2008-05-04
[ 917 ]  
 
Online charging scenario based on policy     ZTE Corporation   Q2/13   2008-05-04
Results:144 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-7-19