Delayed Contributions
[ Source: BT ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 979 ]
|
Testing DSL systems with fluctuating noise
|
BT
|
Q4/15
|
2003-10-13 |
|
[ 903 ]
|
Improvements to ADSL stop-band PSD
|
BT
|
Q4/15
|
2003-10-10 |
|
[ 812 ]
|
Management Information Model for LCAS
|
BT
|
Q14/15
|
2003-10-08 |
|
[ 811 ]
|
Modifications to G.ethna characteristic information and flow points
|
BT
|
Q12/15
|
2003-10-08 |
|
[ 810 ]
|
A consideration on the development of G.ethsrv
|
BT
|
Q12/15
|
2003-10-08 |
|
[ 809 ]
|
Terms of Reference for Q.12/15
|
BT
|
Q14/15, Q12/15, Q11/15, Q9/15
|
2003-10-08 |
|
[ 749 ]
|
Changes to Recommendations G.992.5 and G.994.1 for ADSLplus from the cabinet
|
BT
|
Q4/15
|
2003-10-03 |
|
[ 575 ]
|
Protection and Restoration of Inter Domain Failures for Rerouting Domains
|
BT
|
Q12/15
|
2003-01-08 |
|
[ 557 ]
|
Clarification of the measurement method for G.168 tests 3, 4, and 6
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 556 ]
|
Clarification of the comfort noise requirement in Test 9 of G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 555 ]
|
Proposals to complete the definition of G.168 Test 2C part (c)
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 554 ]
|
Clarification of the test method for Test 15 of G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 553 ]
|
Clarification of the requirement in Test 13 of G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 552 ]
|
Relationship between ERL and echo loss in G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 551 ]
|
Reference to incorrect Figures in G.168 Test 2C
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 550 ]
|
Clarification of the measurement start-time in Tests 2C, 3A and 3B of G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 519 ]
|
Protection and Restoration
|
BT
|
Q12/15
|
2003-01-06 |
|
[ 518 ]
|
Domains
|
BT
|
Q12/15
|
2003-01-06 |
|
[ 410 ]
|
Draft text for G.modem
|
BT
|
Q11/15
|
2002-04-21 |
|
[ 406 ]
|
Transport of G.7713.1 messages over DCN network
|
BT
,
Marconi
|
Q14/15
|
2002-04-21 |
|
[ 321 ]
|
Proposed changes to G.841 to take account of interactions of MS-Springs with WDM
|
BT
|
Q11/15, Q9/15
|
2002-04-10 |
|
[ 287 ]
|
Proposal to consider the use of PNNI protocol for the control of SDH networks
|
BT
|
Q14/15, Q12/15
|
2001-10-03 |
|
[ 286 ]
|
Comments on G.ason annexes
|
BT
|
Q12/15
|
2001-10-03 |
|
[ 285 ]
|
Call controllers
|
BT
|
Q12/15
|
2001-10-03 |
|
[ 284 ]
|
G.ason sections 1-6
|
BT
|
Q12/15
|
2001-10-03 |
|
[ 283 ]
|
Federations
|
BT
|
Q12/15
|
2001-10-03 |
|
[ 282 ]
|
Transport of OTN entities over SDH paths
|
BT
|
Q11/15
|
2001-10-03 |
|
[ 274 ]
|
Interaction of MS-springs with WDM systems
|
BT
|
Q11/15, Q9/15
|
2001-10-03 |
|
[ 57 ]
|
Performance of echo cancellers with text telephones
|
BT
|
Q6/15
|
2001-01-24 |
Results:29 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):