International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2002-04-29 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D (2002-04-29) 

ITU-T SG15

Optical and other transport networks

Study Period 2001

Meeting  from 2002-04-29 to 2002-05-10

held in Switzerland [Geneva]

Other Meetings : 2004-04-19  2003-10-21  2003-01-20  [ 2002-04-29 ]  2001-10-15  2001-02-05 

Results:16 total items.
Delayed Contributions  [ AI/Question: Q11/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 453 ]  
 
Proposed text for an ITU-T Rec. G.7042/Y.1355 (LCAS) Corrigendum     USA   Q11/15   2002-04-21
[ 434 ]  
 
Proposed addition to G.7041 of Transparent_GFP mapping of DVB ASI     USA   Q11/15   2002-04-21
[ 410 ]  
 
Draft text for G.modem     BT   Q11/15   2002-04-21
[ 404 ]  
 
Acronyms for use in VC, LCAS and GPF     Nortel Networks (Europe)   Q11/15, Q9/15   2002-04-21
[ 391 ]  
 
GFP client management frame format and protocol     USA   Q11/15   2002-04-18
[ 390 ]  
 
GFP client management frame applications     WorldCom , Nortel Networks , AMCC , PMC-Sierra   Q11/15   2002-04-18
[ 388 ]  
 
Comments on the OTN linear protection architectures and protocols proposal (Correspondence document 1)     Marconi   Q11/15, Q9/15   2002-04-18
[ 372 ]  
 
Comments on 10Gbit/s Ethenet mappings in Rec. G.707     USA   Q11/15   2002-04-17
[ 371 ]  
 
Proposal for multiplexing GFP frame - mapped data flows     Cisco Systems , WorldCom , PMC-Sierra   Q11/15   2002-04-17
[ 370 ]  
 
Proposal for enhancing the GFP Extended Linear Frame     Cisco Systems , PMC-Sierra   Q11/15   2002-04-17
[ 369 ]  
 
Necessity for adaptation procedure from 10 Gigabit Ethernet to SDH/OTN     NTT   Q11/15   2002-04-17
[ 352 ]  
 
Network need of 10-GbEthernet encapsulation using GFP     NTT   Q12/15, Q11/15   2002-04-17
[ 351 ]  
 
Additional GFP control frame for IPv6 jumbograms     ETRI (Republic of Korea)   Q11/15   2002-04-16
[ 342 ]  
 
Comments on X.msr     Nortel Networks Canada   Q19/15, Q14/15, Q12/15, Q11/15, Q9/15, Q2/15   2002-04-16
[ 323 ]  
 
Proposal for the allocation of an APS channel for OTU trail protection     Marconi Communications Plc, UK   Q11/15   2002-04-12
[ 321 ]  
 
Proposed changes to G.841 to take account of interactions of MS-Springs with WDM     BT   Q11/15, Q9/15   2002-04-10
Results:16 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-28