Temporary Documents
(WP2)
[ AI/Question: Q8/11 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 26-WP2 ]
|
Draft discussion summary of Q8/11 meetings on 4-5 March 2004
|
WP 2/11 Chairman (G. Ratta)
|
Q8/11
|
2004-03-05 |
|
[ 19-WP2 ]
|
Proposed Agenda for Q8/11 Discussions
|
WP2/11 Chairman (G. Ratta)
|
Q8/11
|
2004-02-29 |
|
[ 15-WP2 ]
|
Reply to Proposal on control plane interworking between FR and MPLS
|
SG 17 (GVA, 10-19 Sept. 2003)
|
Q5/17, Q8/11
|
2003-10-07 |
|
[ 14-WP2 ]
(Rev.1) |
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS
|
Editor pro tem (G. Ratta)
|
Q9/11, Q8/11, Q7/11
|
2004-02-23 |
|
[ 13-WP2 ]
(Rev.1) |
WP 2/11 Work Programme
|
WP2/11 Vice-Chairman (D. Knight)
|
Q9/11, Q8/11, Q7/11, Q6/11
|
2004-02-21 |
|
[ 9-WP2 ]
(Rev.1) |
Draft new Recommendation Y.e2eqos on an end-to-end QoS architecture for IP networks evolving into the NGN
R1 submitted by SG13 on 20.02.04 in replacement of TD 9-2/11
|
SG13 (GVA 3-12 February 2004)
|
Q16/13, Q8/11
|
2004-02-17 |
|
[ 8-WP2 ]
|
Liaison Statement - QoS signalling requirements pertaining to the draft new Recommendation Y.123.qos on a Qos architecture for Ethernet-based access networks
|
SG13 (GVA 3-12 February 2004)
|
Q16/13, Q8/11
|
2004-02-17 |
|
[ 7-WP2 ]
|
Reply LS to SG 11 on Signalling Requirements for IP-QoS
|
SG 16 ( GVA 20-30 January 2004)
|
QF/16, Q8/11
|
2004-02-05 |
|
[ 5-WP2 ]
|
Liaison Statement - Update on QoS Lead Study Group activities
|
SG12 (GVA 30.09.03)
|
Q15/12, Q8/11
|
2003-10-10 |
|
[ 3-WP2 ]
|
Liaison Statement - Revised Recommendation G.114
|
SG12 (GVA 30.09.03)
|
Q10/12, Q8/11
|
2003-10-10 |
|
[ 2-WP2 ]
|
List of WP2/11 Series Temporary Documents
|
TSB
|
Q9/11, Q8/11, Q7/11, Q6/11
|
2004-02-27 |
Results:11 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):