International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting 2004-03-01 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG11  TD-GEN (2004-03-01) 

ITU-T SG11

Signalling requirements and protocols

Study Period 2001

Meeting  from 2004-03-01 to 2004-03-12

held in Switzerland [Geneva]

Other Meetings : [ 2004-03-01 ]  2003-09-01  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Results:10 total items.
Temporary Documents  (GEN)  [ AI/Question: Q1/11 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 53-GEN ]  
(Rev.1) 
Q1/11 meeting report     Q1/11 Rapporteur (J. Dobrowolski)   Q1/11   2004-03-05
[ 45-GEN ]  
(Rev.1) 
Draft TRQ.ncap1, reflecting all change requests proposed by D634 with revision marks     Editor (A. Narita)   QN1/11, Q1/11   2004-03-04
[ 39-GEN ]  
 
Baseline document draft TRQ.NCAP1 High Level Functional Requiremnets for Packet-based Network Control Architecture     Editor (A. Narita)   QN1/11, Q1/11   2004-03-02
[ 27-GEN ]  
 
Baseline text for a Technical Report on NGN Service Control Architectures     Editor (B. Chatras)   QN1/11, Q1/11   2004-02-18
[ 26-GEN ]  
 
Baseline text for a Recommendation on SIP-based Service Triggering and Service Interactions     Editor (B. Chatras)   QN2/11, QN1/11, Q1/11   2004-02-18
[ 25-GEN ]  
 
Draft Technical Report Q.ncap2 - Signalling Requirements for gate control interfaces     Editor (B. Chatras)   QN2/11, Q6/11, Q1/11   2004-02-18
[ 24-GEN ]  
 
Draft Technical Report Q.ncap2 - Signalling Requirements for gate control interfaces (OUTPUT from the September 2003 meeting).     Editor (B. Chatras)   QN2/11, Q6/11, Q1/11   2004-02-18
[ 14-GEN ]  
 
ITU-T Rec. Q.1761 "Principles and Requirements for Convergence of Fixed and Existing IMT-2000 Systems"     SSG (17-21 November 2003)   Q7/SSG, Q9/11, Q8/11, Q7/11, Q6/11, Q1/11   2004-01-16
[ 9-GEN ]  
 
Liaison Statement - Country Code Reservation for Telecommunication for Disaster Relief     SG 2 (Florianopolis, 25-31 Oct. 2003)   Q1/11, Q9/11   2003-11-05
[ 4-GEN ]  
 
Liaison Statement - ITU-T NGN Project     SSG (GVA 17-21 November 2003)   QALL/11, Q1/11   2003-12-04
Results:10 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-5-28