International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting 2003-09-01 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG11  D (2003-09-01) 

ITU-T SG11

Signalling requirements and protocols

Study Period 2001

Meeting  from 2003-09-01 to 2003-09-12

held in Switzerland [Geneva]

Other Meetings : 2004-03-01  [ 2003-09-01 ]  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Results:6 total items.
Delayed Contributions  [ Source: Swisscom Ltd ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 462 ]  
 
Proposed Style for Appendix III of Q.2630.3     Swisscom Ltd.   Q15/11   2003-08-15
[ 461 ]  
 
Proposed Enhancements to Annexes C and D of Q.2630.3     Swisscom Ltd.   Q15/11   2003-08-14
[ 460 ]  
 
Proposed Enhancements to Annex B of Q.2630.3     Swisscom Ltd.   Q15/11   2003-08-14
[ 459 ]  
 
Proposed Enhancements to the main body of Q.2630.3     Swisscom Ltd.   Q15/11   2003-08-14
[ 448 ]  
 
Proposed Enhancements to Signalling Requirements TRQ.2402     Swisscom Ltd.   Q15/11, Q9/11   2003-07-29
[ 447 ]  
 
Signalling Requirements for AAL type 2 Link Control Capability Set 3     Swisscom Ltd.   Q15/11, Q9/11   2003-07-29
Results:6 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-5-24