International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting 2003-09-01 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG11  D (2003-09-01) 

ITU-T SG11

Signalling requirements and protocols

Study Period 2001

Meeting  from 2003-09-01 to 2003-09-12

held in Switzerland [Geneva]

Other Meetings : 2004-03-01  [ 2003-09-01 ]  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Results:15 total items.
Delayed Contributions  [ Source: Siemens AG ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 570 ]  
 
Proposal for an Interworking CCBS from PSTN domain to SIP domain     Deutsche Telekom, Siemens AG   Q9/11, Q6/11, Q12/11, Q11/11   2003-08-20
[ 564 ]  
 
Deletion of note 2 in Table 7 in Q.1912.SIP     Deutsche Telekom, Siemens AG, Nortel Networks (UK)   Q12/11, Q11/11   2003-08-20
[ 555 ]  
 
Clarifications to Q.1912.SIP     Deutsche Telekom, Siemens AG   Q12/11, Q11/11   2003-08-20
[ 554 ]  
 
Annex B COLP-COLR Procedure     Deutsche Telekom, Siemens AG   Q12/11, Q11/11   2003-08-20
[ 514 ]  
 
Support for conclusions and recommendations of NGN workshop     Siemens AG, L.M. Ericsson, Nokia   QALL/11   2003-08-20
[ 501 ]  
 
Removal of Best Effort Transfer Capability Support in the IP Connection Control Protocol     Siemens AG   Q9/11   2003-08-18
[ 500 ]  
 
Editorial Changes to draft TRQ.IPC.CS1     Siemens AG   Q9/11   2003-08-18
[ 499 ]  
 
On the interworking of Transfer Capability parameters to CS1 and CS2 AAL type nodes     Siemens AG   Q9/11   2003-08-18
[ 498 ]  
 
On the applicability of SSCS information for AAL type 2 connection resource allocation in CS3 AAL type 2 switches     Siemens AG   Q9/11   2003-08-18
[ 497 ]  
 
Editorials on draft TRQ.AAL2.CS3     Siemens AG   Q9/11   2003-08-18
[ 496 ]  
 
On the selection of the AAL type 2 Signalling Capability Set for AAL2 - IP interworking     Siemens AG   Q9/11   2003-08-18
[ 495 ]  
 
Removed Best Effort support from draft Q.AAL2IPiw.CS1 and draft Q.IPC.CS1     Siemens AG   Q15/11   2003-08-18
[ 494 ]  
 
Changes to Draft Q.2630 CS3     Siemens AG   Q15/11   2003-08-18
[ 493 ]  
 
Clarification to clause 6.1.3.5.1 of draft Q.1912.SIP     Siemens AG   Q12/11, Q11/11   2003-08-18
[ 492 ]  
 
CCBS and CCNR in SIP/SIP-I - ISUP/BICC Interworking     Siemens AG & Deutsche Telekom   Q12/11, Q11/11, Q9/11, Q6/11   2003-08-18
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-10-11