Delayed Contributions
[ AI/Question: Q13/11 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 444 ]
|
Connectionless Procedures
|
Swisscom Ltd.
|
Q13/11
|
2002-10-29 |
|
[ 443 ]
|
Signalling Network Architecture - § 5 for TI-SCCP
|
Swisscom Ltd
|
Q13/11
|
2002-10-29 |
|
[ 442 ]
|
Further Considerations of the Procedures for OPC
|
Swisscom Ltd.
|
Q13/11
|
2002-10-29 |
|
[ 441 ]
|
Specification of the Procedures for SLS, OPC, and DPC
|
Swisscom Ltd.
|
Q13/11
|
2002-10-29 |
|
[ 440 ]
|
Modification of § 8 (Exceptions to Q.713) of TI-SCCP
|
Swisscom Ltd.
|
Q13/11
|
2002-10-29 |
|
[ 439 ]
|
Sequence Control Parameter for TI-SCCP
|
Swisscom Ltd
|
Q13/11
|
2002-10-29 |
|
[ 431 ]
|
Comments on Draft Recommendation Q.2150.3 Signalling Transport Converter on SCTP
|
Ericsson Ltd.
|
Q13/11
|
2002-10-30 |
|
[ 416 ]
|
Interaction between Encapsulated ISUP (SIP-I) and the Signalling Transport
|
LM Ericsson
|
Q13/11, Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-30 |
|
[ 358 ]
|
Q.2150.3, New Checksum for SCTP
|
FRANCE TELECOM SA
|
Q13/11
|
2002-10-29 |
|
[ 332 ]
|
Protocol design in SIP-BICC/ISUP interworking
|
Australia
|
Q13/11, Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-24 |
Results:10 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):