Delayed Contributions
[ AI/Question: Q12/11 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 428 ]
|
Comments on Draft Amendments to Q.764 and Q.1902.4 for International Emergency Preference Scheme
|
Ericsson Ltd.
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 421 ]
|
Proposed changes to Profile A for 3GPP for Inter-working between SIP and BICC/ISUP
|
LM Ericsson
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 420 ]
|
Sending initial INVITE for Profile A for 3GPP
|
LM Ericsson
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 419 ]
|
Sending UPDATE for Profile A for 3GPP
|
LM Ericsson
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 418 ]
|
Sending of ACM and Awaiting Answer indication for Profile A for 3GPP
|
LM Ericsson
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 417 ]
|
Proposal for draft baseline text for Q.1912.x "SIP.Profile A"
|
LM Ericsson
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 416 ]
|
Interaction between Encapsulated ISUP (SIP-I) and the Signalling Transport
|
LM Ericsson
|
Q13/11, Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-30 |
|
[ 415 ]
|
3GPP CN 3 View on SIP-ISUP/BICC Interworking
|
LM Ericsson
|
Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-30 |
|
[ 398 ]
|
Mapping between ISUP release cause and SIP status codes
|
Deutsche Telekom
|
Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-30 |
|
[ 397 ]
|
Clarification on the use of SIP-I
|
Deutsche Telekom
|
Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-30 |
|
[ 396 ]
|
Interconnection between international Operators using SIP-I
|
Deutsche Telekom
|
Q9/11, Q12/11, Q11/11, Q6/11
|
2002-10-30 |
|
[ 395 ]
|
TRQ.BICC-ISUP-SIP Scope of Profile C and the regarding support of SIP with ISUP MIME
|
Deutsche Telekom
|
Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-30 |
|
[ 394 ]
|
Q.1912.SIP:Guidelines on FCI settings
|
Deutsche Telekom
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 393 ]
|
SIP-I procedures for CLIP - CLIR
|
Deutsche Telekom and Siemens AG Germany
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 392 ]
|
Overlap Signalling at the O-IWU
|
Nortel Networks (UK) and Deutsche Telekom
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 391 ]
|
Re-wording of overlap procedures to take account of different scenarios for "Sending of IAM"
|
Nortel Networks (UK) and Deutsche Telekom
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 390 ]
|
Overlap signalling - Re-wording of "General Principles" and "Sending of SAM" sections.
|
Nortel Networks (UK) and Deutsche Telekom
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 389 ]
|
Removal of section 7.3 "Receipt of COT message / Sending of UPDATE message with confirmation preconditions met"
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 388 ]
|
Changes to ISUP encapsulation procedures to allow encapsulation and de-encapsulation at both I-IWU and O-IWU
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 387 ]
|
Changes to ISUP encapsulation procedures to mandate that reliable provisional responses must be used when encapsulating ISUP messages
|
Nortel Networks, UK
|
Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-29 |
|
[ 386 ]
|
Modifications to ISUP encapsulation - Detailed Procedures
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 385 ]
|
Response to questions on BICC specific annex.
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 384 ]
|
Correction of INVITE (with no SDP) scenario in BICC specific annex.
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 383 ]
|
Guidelines for setting of BCI at the O-IWU
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 382 ]
|
Guidelines for setting of FCI at the I-IWU
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 381 ]
|
Deletion of text describing how TMR/USI table is populated
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 380 ]
|
Interworking of TMR / TMR prime / USI / USI prime / TMU at the O-IWU
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 379 ]
|
Interworking of TMR / TMR prime / USI / USI prime / TMU at the I-IWU
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 378 ]
|
Modifications to Sending of INVITE at O-IWU
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 377 ]
|
Procedures at the I-IWU when INVITE is received with or without indication of support for reliable provisional responses
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 376 ]
|
Modifications to "Sending of IAM" at I-IWU
|
Nortel Networks, UK
|
Q12/11, Q11/11
|
2002-10-29 |
|
[ 374 ]
|
SIP-I Procedures for the Satellite indicator and the Propagation delay value
|
Deutsche Telekom
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 373 ]
|
SIP-I Hop counter Procedure
|
Deutsche Telekom, ALCATEL SEL
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 372 ]
|
Status of RFC 2597 INFO Method
|
Deutsche Telekom
|
Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-30 |
|
[ 371 ]
|
Call Flow examples for Annex B of the draft Q.1912.SIP recommendation
|
Deutsche Telekom
|
Q9/11, Q6/11, Q12/11, Q11/11
|
2002-10-30 |
|
[ 370 ]
|
Procedures for the interworking of Supplementary services with SIP-I and SIP
|
Deutsche Telekom
|
Q9/11, Q6/11, Q12/11, Q11/11
|
2002-10-30 |
|
[ 369 ]
|
Mapping of From and P-Asserted-ID with CgPN and Generic Number
|
Deutsche Telekom, Siemens AG Germany
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 368 ]
|
SIP-I protocol procedures for Cut Through
|
Deutsche Telekom, Siemens AG Germany
|
Q9/11, Q6/11, Q12/11, Q11/11
|
2002-10-30 |
|
[ 367 ]
|
SIP-I Requirement for Cut Through
|
Deutsche Telekom, Siemens AG Germany
|
Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-30 |
|
[ 366 ]
|
Protocol description for COLP -COLR
|
Deutsche Telekom
|
Q9/11, Q6/11, Q12/11, Q11/11
|
2002-10-30 |
|
[ 365 ]
|
SIP-T Interworking and correlation of ISUP MIME and ISUP mapped from SIP elements
|
Deutsche Telekom
|
Q9/11, Q6/11, Q12/11, Q11/11
|
2002-10-30 |
|
[ 364 ]
|
Disadvantage of splitting Q.1912.SIP
|
Deutsche Telekom
|
Q12/11, Q11/11
|
2002-10-30 |
|
[ 363 ]
|
Possible deletion of E.353 in SG2
|
Deutsche Telekom
|
Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-30 |
|
[ 362 ]
|
Proposal of parameter and procedures for a new Transcoding Indication
|
Deutsche Telekom
|
Q9/11, Q12/11, Q11/11
|
2002-10-30 |
|
[ 361 ]
|
Proposal of a new Transcoding Indication Parameter
|
Deutsche Telekom
|
Q12/11, Q11/11, Q9/11
|
2002-10-30 |
|
[ 357 ]
|
Proposals for the handling of candidate New Question "Syntax Language...."
|
FRANCE TELECOM SA
|
Q12/11, Q11/11, Q9/11, Q6/11
|
2002-10-29 |
|
[ 353 ]
|
Methods of Transport of ATM over MPLS
|
Canada
|
Q12/11, Q8/11
|
2002-10-29 |
|
[ 348 ]
|
Coding Updates to Draft Q.aom
|
Canada
|
Q12/11
|
2002-10-25 |
|
[ 347 ]
|
Documentation of a future parameter for IEPS support in the draft Amendments to Q.673, Q.1902.3 and Q.2673
|
KPN
|
Q12/11, Q11/11, Q6/11
|
2002-10-28 |
|
[ 346 ]
|
Procedures for IEPS support in the case of queuing (return of early ACM) in draft Amendment to Q.1902.4 (BICC CS2 basic call procedures)
|
KPN
|
Q12/11, Q11/11, Q6/11
|
2002-10-28 |
Results:68 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):