International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting 2002-11-11 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG11  D (2002-11-11) 

ITU-T SG11

Signalling requirements and protocols

Study Period 2001

Meeting  from 2002-11-11 to 2002-11-22

held in Switzerland [Geneva]

Other Meetings : 2004-03-01  2003-09-01  [ 2002-11-11 ]  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Results:68 total items.
Result page:  1 - 2  - Next Next
Delayed Contributions  [ AI/Question: Q12/11 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 428 ]  
 
Comments on Draft Amendments to Q.764 and Q.1902.4 for International Emergency Preference Scheme     Ericsson Ltd.   Q12/11, Q11/11   2002-10-30
[ 421 ]  
 
Proposed changes to Profile A for 3GPP for Inter-working between SIP and BICC/ISUP     LM Ericsson   Q12/11, Q11/11   2002-10-30
[ 420 ]  
 
Sending initial INVITE for Profile A for 3GPP     LM Ericsson   Q12/11, Q11/11   2002-10-30
[ 419 ]  
 
Sending UPDATE for Profile A for 3GPP     LM Ericsson   Q12/11, Q11/11   2002-10-30
[ 418 ]  
 
Sending of ACM and Awaiting Answer indication for Profile A for 3GPP     LM Ericsson   Q12/11, Q11/11   2002-10-30
[ 417 ]  
 
Proposal for draft baseline text for Q.1912.x "SIP.Profile A"     LM Ericsson   Q12/11, Q11/11   2002-10-30
[ 416 ]  
 
Interaction between Encapsulated ISUP (SIP-I) and the Signalling Transport     LM Ericsson   Q13/11, Q12/11, Q11/11, Q9/11, Q6/11   2002-10-30
[ 415 ]  
 
3GPP CN 3 View on SIP-ISUP/BICC Interworking     LM Ericsson   Q12/11, Q11/11, Q9/11, Q6/11   2002-10-30
[ 398 ]  
 
Mapping between ISUP release cause and SIP status codes     Deutsche Telekom   Q12/11, Q11/11, Q9/11, Q6/11   2002-10-30
[ 397 ]  
 
Clarification on the use of SIP-I     Deutsche Telekom   Q12/11, Q11/11, Q9/11, Q6/11   2002-10-30
[ 396 ]  
 
Interconnection between international Operators using SIP-I     Deutsche Telekom   Q9/11, Q12/11, Q11/11, Q6/11   2002-10-30
[ 395 ]  
 
TRQ.BICC-ISUP-SIP Scope of Profile C and the regarding support of SIP with ISUP MIME     Deutsche Telekom   Q12/11, Q11/11, Q9/11, Q6/11   2002-10-30
[ 394 ]  
 
Q.1912.SIP:Guidelines on FCI settings     Deutsche Telekom   Q12/11, Q11/11   2002-10-30
[ 393 ]  
 
SIP-I procedures for CLIP - CLIR     Deutsche Telekom and Siemens AG Germany   Q12/11, Q11/11   2002-10-30
[ 392 ]  
 
Overlap Signalling at the O-IWU     Nortel Networks (UK) and Deutsche Telekom   Q12/11, Q11/11   2002-10-29
[ 391 ]  
 
Re-wording of overlap procedures to take account of different scenarios for "Sending of IAM"     Nortel Networks (UK) and Deutsche Telekom   Q12/11, Q11/11   2002-10-29
[ 390 ]  
 
Overlap signalling - Re-wording of "General Principles" and "Sending of SAM" sections.     Nortel Networks (UK) and Deutsche Telekom   Q12/11, Q11/11   2002-10-29
[ 389 ]  
 
Removal of section 7.3 "Receipt of COT message / Sending of UPDATE message with confirmation preconditions met"     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 388 ]  
 
Changes to ISUP encapsulation procedures to allow encapsulation and de-encapsulation at both I-IWU and O-IWU     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 387 ]  
 
Changes to ISUP encapsulation procedures to mandate that reliable provisional responses must be used when encapsulating ISUP messages     Nortel Networks, UK   Q12/11, Q11/11, Q9/11, Q6/11   2002-10-29
[ 386 ]  
 
Modifications to ISUP encapsulation - Detailed Procedures     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 385 ]  
 
Response to questions on BICC specific annex.     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 384 ]  
 
Correction of INVITE (with no SDP) scenario in BICC specific annex.     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 383 ]  
 
Guidelines for setting of BCI at the O-IWU     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 382 ]  
 
Guidelines for setting of FCI at the I-IWU     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 381 ]  
 
Deletion of text describing how TMR/USI table is populated     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 380 ]  
 
Interworking of TMR / TMR prime / USI / USI prime / TMU at the O-IWU     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 379 ]  
 
Interworking of TMR / TMR prime / USI / USI prime / TMU at the I-IWU     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 378 ]  
 
Modifications to Sending of INVITE at O-IWU     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 377 ]  
 
Procedures at the I-IWU when INVITE is received with or without indication of support for reliable provisional responses     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 376 ]  
 
Modifications to "Sending of IAM" at I-IWU     Nortel Networks, UK   Q12/11, Q11/11   2002-10-29
[ 374 ]  
 
SIP-I Procedures for the Satellite indicator and the Propagation delay value     Deutsche Telekom   Q12/11, Q11/11   2002-10-30
[ 373 ]  
 
SIP-I Hop counter Procedure     Deutsche Telekom, ALCATEL SEL   Q12/11, Q11/11   2002-10-30
[ 372 ]  
 
Status of RFC 2597 INFO Method     Deutsche Telekom   Q12/11, Q11/11, Q9/11, Q6/11   2002-10-30
[ 371 ]  
 
Call Flow examples for Annex B of the draft Q.1912.SIP recommendation     Deutsche Telekom   Q9/11, Q6/11, Q12/11, Q11/11   2002-10-30
[ 370 ]  
 
Procedures for the interworking of Supplementary services with SIP-I and SIP     Deutsche Telekom   Q9/11, Q6/11, Q12/11, Q11/11   2002-10-30
[ 369 ]  
 
Mapping of From and P-Asserted-ID with CgPN and Generic Number     Deutsche Telekom, Siemens AG Germany   Q12/11, Q11/11   2002-10-30
[ 368 ]  
 
SIP-I protocol procedures for Cut Through     Deutsche Telekom, Siemens AG Germany   Q9/11, Q6/11, Q12/11, Q11/11   2002-10-30
[ 367 ]  
 
SIP-I Requirement for Cut Through     Deutsche Telekom, Siemens AG Germany   Q12/11, Q11/11, Q9/11, Q6/11   2002-10-30
[ 366 ]  
 
Protocol description for COLP -COLR     Deutsche Telekom   Q9/11, Q6/11, Q12/11, Q11/11   2002-10-30
[ 365 ]  
 
SIP-T Interworking and correlation of ISUP MIME and ISUP mapped from SIP elements     Deutsche Telekom   Q9/11, Q6/11, Q12/11, Q11/11   2002-10-30
[ 364 ]  
 
Disadvantage of splitting Q.1912.SIP     Deutsche Telekom   Q12/11, Q11/11   2002-10-30
[ 363 ]  
 
Possible deletion of E.353 in SG2     Deutsche Telekom   Q12/11, Q11/11, Q9/11, Q6/11   2002-10-30
[ 362 ]  
 
Proposal of parameter and procedures for a new Transcoding Indication     Deutsche Telekom   Q9/11, Q12/11, Q11/11   2002-10-30
[ 361 ]  
 
Proposal of a new Transcoding Indication Parameter     Deutsche Telekom   Q12/11, Q11/11, Q9/11   2002-10-30
[ 357 ]  
 
Proposals for the handling of candidate New Question "Syntax Language...."     FRANCE TELECOM SA   Q12/11, Q11/11, Q9/11, Q6/11   2002-10-29
[ 353 ]  
 
Methods of Transport of ATM over MPLS     Canada   Q12/11, Q8/11   2002-10-29
[ 348 ]  
 
Coding Updates to Draft Q.aom     Canada   Q12/11   2002-10-25
[ 347 ]  
 
Documentation of a future parameter for IEPS support in the draft Amendments to Q.673, Q.1902.3 and Q.2673     KPN   Q12/11, Q11/11, Q6/11   2002-10-28
[ 346 ]  
 
Procedures for IEPS support in the case of queuing (return of early ACM) in draft Amendment to Q.1902.4 (BICC CS2 basic call procedures)     KPN   Q12/11, Q11/11, Q6/11   2002-10-28
Results:68 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-7-23