International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting 2002-02-18 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG11  D (2002-02-18) 

ITU-T SG11

Signalling requirements and protocols

Study Period 2001

Meeting  from 2002-02-18 to 2002-03-01

held in Switzerland [Geneva]

Other Meetings : 2004-03-01  2003-09-01  2002-11-11  [ 2002-02-18 ]  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Results:5 total items.
Delayed Contributions  [ Source: Nortel Networks ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 286 ]  
 
Proposed Changes to Q.1902.6 to clarify bearer redirection enhancements first proposed (and accepted) in Gra-094     Nortel Networks (UK)   Q11/11   2002-02-06
[ 285 ]  
 
Inter working of ISUP Parameter Compatibility Information with SIP networks     Nortel Networks (UK)   Q11/11   2002-02-06
[ 284 ]  
 
Specification of COLP/COLR inter working service annex.     Nortel Networks (UK)   Q12/11, Q11/11   2002-02-06
[ 283 ]  
 
Proposed Annex C.1 "Inter working of CLIP/CLIR supplementary services with SIP networks     Nortel Networks (UK)   Q12/11, Q11/11   2002-02-06
[ 282 ]  
 
Modifications to Basic call ISUP/SIP and SIP/ISUP interworking to support Calling Party Number     Nortel Networks (UK)   Q12/11, Q11/11   2002-02-06
Results:5 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-5-24