International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting 2001-05-14 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG11  D (2001-05-14) 

ITU-T SG11

Signalling requirements and protocols

Study Period 2001

Meeting  from 2001-05-14 to 2001-05-25

held in Switzerland [Geneva]

Other Meetings : 2004-03-01  2003-09-01  2002-11-11  2002-02-18  2001-07-02  [ 2001-05-14 ]  2001-03-21  2000-11-27 

Results:16 total items.
Delayed Contributions  [ Source: UK ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 226 ]  
 
Q.1950 BCP tunnelling enhancements     Nortel Networks (UK), Marconi, France Telecom, Alcatel   Q11/11   2001-05-02
[ 225 ]  
 
References in Q.1950 for tone generation packages     Nortel Networks (UK)   Q11/11   2001-05-02
[ 223 ]  
 
BICC access: RMCF protocol proposal     Nortel Networks (UK)   Q11/11, Q9/11   2001-05-02
[ 203 ]  
 
Proposed new Recommendation on SIP profile for interworking with the ISDN (SIP-T)     Nortel Networks (UK)   Q6/11   2001-05-02
[ 195 ]  
 
BICC access:RMCF protocol - Analogue Terminal Control     Nortel Networks (UK)   Q11/11, Q9/11   2001-05-02
[ 194 ]  
 
BICC access bearer control requirements     Nortel Networks (UK)   Q11/11, Q9/11   2001-05-02
[ 193 ]  
 
BICC access: ACF protocol proposal     Nortel Networks (UK)   Q11/11, Q9/11   2001-05-02
[ 192 ]  
 
BICC access: CSM protocol proposal     Nortel Networks (UK)   Q11/11, Q9/11   2001-05-02
[ 191 ]  
 
Roadmap for nortel networks (UK) BICC access contributions     Nortel Networks (UK)   Q11/11, Q9/11   2001-05-02
[ 190 ]  
 
Scope of BICC CS3     Nortel Networks (UK)   Q12/11, Q11/11, Q9/11, Q6/11   2001-05-02
[ 189 ]  
 
Bearer redirection enhancements     Nortel Networks (UK)   Q11/11, Q9/11   2001-05-02
[ 188 ]  
 
Bearer control for ATM adaptation layer type 2 over ATM networks     Nortel Networks (UK)   Q11/11, Q9/11   2001-05-02
[ 158 ]  
 
Clarification of automatic congestion control procedures     UK   Q12/11, Q11/11   2001-05-02
[ 157 ]  
 
Clarification of the treatment of national use elements at international gateways     UK   Q12/11, Q11/11   2001-05-02
[ 156 ]  
 
Development of new signalling and interworking Recommendations for session initiation protocol.     UK   Q6/11   2001-05-02
[ 147 ]  
 
Overview of VHE activities in 3G     UK   Q7/SSG, Q1/SSG, Q3/11, Q2/11   2001-05-02
Results:16 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-5-24