International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG06 : Meeting 2002-09-23 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG06  TD-GEN (2002-09-23) 

ITU-T SG06

Outside plant

Study Period 2001

Meeting  from 2002-09-23 to 2002-09-27

held in Belgium [Kessel-Lo]

Other Meetings : 2004-06-14  2003-11-25  2003-04-07  [ 2002-09-23 ]  2001-12-10  2001-03-06 

Results:20 total items.
Temporary Documents  (GEN)  [ Source: Rapporteur ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 59-GEN ]  
 
Appendix for L.40     Rapporteur Q.5/6   Q5/6   2002-10-08
[ 58-GEN ]  
 
Revised COM 6-25     Rapporteur Q.5/6   Q5/6   2002-10-08
[ 52-GEN ]  
 
Draft new Rec. L.43 (for consent)     Rapporteur Q.8/6   Q8/6   2002-10-08
[ 51-GEN ]  
 
Draft rev. Rec. L.26 (for consent)     Rapporteur Q.8/6   Q8/6   2002-10-08
[ 49-GEN ]  
 
Draft rev. COM22 for Rec. L.28 (for consent)     Rapporteur Q.10/6   Q10/6, Q7/6, Q8/6, Q9/6   2002-10-08
[ 46-GEN ]  
 
Draft rev. Rec. L.10 (for consent)     Rapporteur Q.8/6   Q8/6   2002-10-08
[ 44-GEN ]  
 
Report of Q.4/6     Rapporteur Q.4/6   Q4/6   2002-10-08
[ 42-GEN ]  
 
Draft new Rec. L.51 (ex-L.new) (for consent)     Rapporteur Q.7/6   Q7/6   2002-10-08
[ 41-GEN ]  
 
Draft rev. Rec. L.13 (for consent)     Rapporteur Q.7/6   Q7/6   2002-10-08
[ 40-GEN ]  
(Rev.1) 
Proposed wording for Q.3/6     Rapporteur and Associate Rapporteur Q.3/6   Q3/6   2002-10-08
[ 39-GEN ]  
 
Report on European Commission COST 270 activities     Rapporteur Q.10/6   Q10/6, Q7/6, Q8/6, Q9/6   2002-10-08
[ 38-GEN ]  
 
Replies to Circular 52: Questionnaire related to joint closures, termination and distribution frames, outdoor enclosures and passive modules for optical networks     Rapporteur Q.7/6   Q7/6   2002-10-08
[ 36-GEN ]  
 
Optical fibre cable installation by blowing technique     Rapporteur Q.4/6   Q4/6   2002-10-08
[ 35-GEN ]  
 
Progress report on the study of Question 4/6     Rapporteur Q.4/6   Q4/6   2002-10-08
[ 34-GEN ]  
 
Environmental and social costs evaluation for innovative dig techniques     Rapporteur Q.6/6   Q6/6   2002-10-08
[ 33-GEN ]  
 
Questionnaire on environmental usage of optical cables, copper cables, optical components and wooden poles     Rapporteur Q.1/6   Q1/6   2002-10-08
[ 31-GEN ]  
 
Consolidation of the Questionnaire on issues related to the unbundling of network elements     Associate Rapporteur Q.3/6   Q3/6   2002-10-08
[ 30-GEN ]  
 
Proposed new Question: Technical aspects related to the unbundling of outside plant elements     Associate Rapporteur Q.3/6   Q3/6   2002-10-08
[ 29-GEN ]  
 
Revised summary of responses to TSB Circular 101: Questionnaire on optical fibre maintenance criteria for access networks     Rapporteur Q.5/6   Q5/6   2002-10-08
[ 10-GEN ]  
 
Answers to the Questionnaire on Safety procedures for outdoor installations     Acting Rapporteur Q.2/6   Q2/6   2002-10-08
Results:20 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-7-26