International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP4A  C 

ITU-R R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:22 total items.
Contributions  [ AI/Question: AI1.3 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 535 ]  
 
Amendments to draft CPM text on WRC-27 agenda item 1.3     India   AI1.3   2025-04-23
[ 501 ]  
 
Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     United States   AI1.3   2025-04-23
[ 479 ]  
 
WRC-27 agenda item 1.3 - Compatibility study between FSS gateways in the band 51.4-52.4 GHz and EESS (passive) sensors in the band 52.6-54.25 GHz     European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellite   AI1.3   2025-04-22
[ 478 ]  
 
WRC-27 agenda item 1.1 - Compatibility study between FSS ESIM in the bands 47.2-50.2 GHz and 50.4-51.4 GHz and EESS (passive) sensors in the band 50.2-50.4 GHz     European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellite   AI1.3, AI1.1   2025-04-22
[ 427 ]  
 
Considerations on the simulation method for aggregate interference from both non-GSO and GSO feeder links to passive remote sensing services     China   AI1.3   2025-04-22
[ 426 ]  
 
Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     SES   AI1.3   2025-04-21
[ 390 ]  
 
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     Netherlands (Kingdom of the)   AI1.3   2025-04-16
[ 351 ]  
 
Liaison statement to Working Party 4A - WRC-27 agenda item 1.3     WP 5A   AI1.3   2024-12-11
[ 308 ]  
 
MEO Earth station parameters for studies to be conducted under WRC-27 agenda item 1.3     Intelsat   AI1.3   2024-10-09
[ 281 ]  
 
Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     United States   AI1.3   2024-10-09
[ 280 ]  
 
Proposed draft CPM text for WRC-27 agenda item 1.3     Egypt   AI1.3   2024-10-09
[ 276 ]  
 
Proposed modifications to the working document regarding WRC-27 agenda item 1.3     Egypt   AI1.3   2024-10-09
[ 269 ]  
 
Technical comments on Resolution 770 (Rev.WRC-23) methodology for protection of GSO networks from non-GSO interference     Viasat, Inc.   AI1.3, AI1.1   2024-10-08
[ 201 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C and 7C for information) - WRC-27 agenda item 1.3     WP 7D   AI1.3   2024-09-30
[ 149 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-27 agenda item 1.3     WP 3M   AI1.3   2024-06-12
[ 134 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.3     WP 5C   AI1.3   2024-05-29
[ 81 ]  
 
Proposed working document on WRC-27 agenda item 1.3     Canada   AI1.3   2024-04-18
[ 59 ]  
 
Draft liaison statement to Working Parties 5A, 5C, 7C and 7D (copy to Working Party 3M) - WRC-27 agenda item 1.3     United States   AI1.3   2024-04-18
[ 58 ]  
 
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     United States   AI1.3   2024-04-18
[ 39 ]  
(Rev.1) 
Considerations on preparations for WRC-27 agenda item 1.3     China   AI1.3   2024-04-17
[ 35 ]  
 
Medium Earth orbit earth station parameters for studies to be conducted under WRC-27 agenda item 1.3     SES   AI1.3   2024-04-16
[ 12 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3     WP 7C   AI1.3   2024-03-25
Results:22 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-5-6