Contributions
[ AI/Question: AI1.3 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 535 ]
|
Amendments to draft CPM text on WRC-27 agenda item 1.3
|
India
|
AI1.3
|
2025-04-23 |
|
[ 501 ]
|
Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)
|
United States
|
AI1.3
|
2025-04-23 |
|
[ 479 ]
|
WRC-27 agenda item 1.3 - Compatibility study between FSS gateways in the band 51.4-52.4 GHz and EESS (passive) sensors in the band 52.6-54.25 GHz
|
European Space Agency (ESA)
,
European Organisation for the Exploitation of Meteorological Satellite
|
AI1.3
|
2025-04-22 |
|
[ 478 ]
|
WRC-27 agenda item 1.1 - Compatibility study between FSS ESIM in the bands 47.2-50.2 GHz and 50.4-51.4 GHz and EESS (passive) sensors in the band 50.2-50.4 GHz
|
European Space Agency (ESA)
,
European Organisation for the Exploitation of Meteorological Satellite
|
AI1.3, AI1.1
|
2025-04-22 |
|
[ 427 ]
|
Considerations on the simulation method for aggregate interference from both non-GSO and GSO feeder links to passive remote sensing services
|
China
|
AI1.3
|
2025-04-22 |
|
[ 426 ]
|
Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)
|
SES
|
AI1.3
|
2025-04-21 |
|
[ 390 ]
|
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)
|
Netherlands (Kingdom of the)
|
AI1.3
|
2025-04-16 |
|
[ 351 ]
|
Liaison statement to Working Party 4A - WRC-27 agenda item 1.3
|
WP 5A
|
AI1.3
|
2024-12-11 |
|
[ 308 ]
|
MEO Earth station parameters for studies to be conducted under WRC-27 agenda item 1.3
|
Intelsat
|
AI1.3
|
2024-10-09 |
|
[ 281 ]
|
Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)
|
United States
|
AI1.3
|
2024-10-09 |
|
[ 280 ]
|
Proposed draft CPM text for WRC-27 agenda item 1.3
|
Egypt
|
AI1.3
|
2024-10-09 |
|
[ 276 ]
|
Proposed modifications to the working document regarding WRC-27 agenda item 1.3
|
Egypt
|
AI1.3
|
2024-10-09 |
|
[ 269 ]
|
Technical comments on Resolution 770 (Rev.WRC-23) methodology for protection of GSO networks from non-GSO interference
|
Viasat, Inc.
|
AI1.3, AI1.1
|
2024-10-08 |
|
[ 201 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C and 7C for information) - WRC-27 agenda item 1.3
|
WP 7D
|
AI1.3
|
2024-09-30 |
|
[ 149 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-27 agenda item 1.3
|
WP 3M
|
AI1.3
|
2024-06-12 |
|
[ 134 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.3
|
WP 5C
|
AI1.3
|
2024-05-29 |
|
[ 81 ]
|
Proposed working document on WRC-27 agenda item 1.3
|
Canada
|
AI1.3
|
2024-04-18 |
|
[ 59 ]
|
Draft liaison statement to Working Parties 5A, 5C, 7C and 7D (copy to Working Party 3M) - WRC-27 agenda item 1.3
|
United States
|
AI1.3
|
2024-04-18 |
|
[ 58 ]
|
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)
|
United States
|
AI1.3
|
2024-04-18 |
|
[ 39 ]
(Rev.1) |
Considerations on preparations for WRC-27 agenda item 1.3
|
China
|
AI1.3
|
2024-04-17 |
|
[ 35 ]
|
Medium Earth orbit earth station parameters for studies to be conducted under WRC-27 agenda item 1.3
|
SES
|
AI1.3
|
2024-04-16 |
|
[ 12 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3
|
WP 7C
|
AI1.3
|
2024-03-25 |
Results:22 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):