|
Format |
Size |
Posted |
|
|
|
English |
Word
|
678731 bytes |
2025-06-24 |
[79] Annex 6
- Working document towards a preliminary draft revision of Report ITU-R SM.2404-0 - Regulatory tools to support enhanced shared use of the spectrum |
|
Word
|
1225409 bytes |
2025-07-04 |
[79] Annex 5
- Preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from
the transition to digital terrestrial television in the UHF bands |
|
Word
|
1439672 bytes |
2025-06-24 |
[79] Annex 4
- Preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability |
|
Word
|
1022168 bytes |
2025-06-24 |
[79] Annex 3
- Preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems |
|
Word
|
447452 bytes |
2025-06-24 |
[79] Annex 2
- Preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices |
|
Word
|
47247 bytes |
2025-06-24 |
[79] Annex 1
- Preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices |
|
|