International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B.AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B.AR  C 

ITU-R WP1B.AR

Spectrum Management Methodologies and Economic Strategies

Results:14 total items.
Contributions  [ Source: Korea (Republic of) ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 56 ]  
 
Proposed draft liaison statement to CCT - UWB Abbreviation and Definition in the ITU-R recommendations and reports     Korea (Republic of)     2024-10-22
[ 55 ]  
 
Proposed draft new ITU-R Question - Guidance on the use of radio spectrum for new radio systems in the presence of incumbents     Korea (Republic of)     2024-10-22
[ 54 ]  
 
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)     2024-10-22
[ 53 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     Korea (Republic of)     2024-10-22
[ 39 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)     2023-05-19
[ 38 ]  
 
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     Korea (Republic of)     2023-05-19
[ 25 ]  
 
Proposed working document towards a preliminary draft new Report ITU-R [SPECTRUM MANAGEMENT FRAMEWORK FOR THE INTRODUCTION OF GPR/WPR] - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems     Korea (Republic of)     2022-06-20
[ 24 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2022-06-20
[ 18 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2021-10-26
[ 17 ]  
 
Proposed revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization     Korea (Republic of)     2021-10-26
[ 12 ]  
 
Proposed working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2021-05-14
[ 6 ]  
 
Proposed revision of Report ITU-R SM.2153-7 [UPDATING SRD RELATED LEGISTLATION IN KOREA] - Technical and operating parameters and spectrum use for short range radiocommunication devices     Korea (Republic of)     2020-11-13
[ 5 ]  
 
Proposesed revision of Report ITU-R SM.2153-7 (Technical Regulation for SRDs in Korea)     Korea (Republic of)     2020-11-13
[ 4 ]  
 
Proposed draft new ITU-R Question - Spectrum management framework for the introduction of GPR/WPR     Korea (Republic of)     2020-11-13
Results:14 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-11-2