Contributions
[ AI/Question: AI1.5 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 592 ]
|
Proposal to elevate Annex 16 to Document 4A/826 to preliminary draft new Report status
|
United States of America
|
AI1.5
|
2019-06-19 |
|
[ 591 ]
|
Revisions to working document towards a preliminary draft new Report ITU-R S.[ESIM] - Earth stations in motion (ESIM) compatibility with non-GSO MSS feeder links in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
|
United States of America
|
AI1.5
|
2019-06-19 |
|
[ 580 ]
|
Sharing and compatibility between ESIM and mobile service
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2019-06-19 |
|
[ 579 ]
|
Sharing and compatibility between ESIM and fixed service
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2019-06-19 |
|
[ 578 ]
|
Amendments to working document towards a preliminary draft new Report ITU-R S.[AGENDA ITEM 1.5]
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2019-06-19 |
|
[ 575 ]
|
Analysis of various power flux density (PFD) masks for protection of terrestrial fixed and mobile services from ESIMS
|
ViaSat, Inc.
|
AI1.5
|
2019-06-19 |
|
[ 574 ]
|
Further studies regarding A-ESIM PFD calculation based on worst-case scenarios
|
ViaSat, Inc.
|
AI1.5
|
2019-06-19 |
|
[ 560 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing study between earth stations in motion operating with geostationary FSS networks and MS stations in the frequency band 27.5-29.5 GHz
|
China (People's Republic of)
|
AI1.5
|
2019-06-18 |
|
[ 559 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz
|
China (People's Republic of)
|
AI1.5
|
2019-06-18 |
|
[ 558 ]
|
Revisions to working document towards a preliminary draft new Report ITU-R S.[AGENDA ITEM 1.5] - Operation of earth stations in motion (ESIM) communicating with geostationary spaces stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
Russian Federation
|
AI1.5
|
2019-06-18 |
|
[ 549 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz
|
Japan
,
Korea (Republic of)
|
AI1.5
|
2019-06-11 |
|
[ 544 ]
|
Revisions to the working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS]
|
United States of America
|
AI1.5
|
2018-06-26 |
|
[ 542 ]
|
Revisions to working document towards a preliminary draft new Report ITU-R S.[ESIM] - Operation of earth stations in motion (ESIM) in fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
|
United States of America
|
AI1.5
|
2018-06-26 |
|
[ 540 ]
|
Draft reply liaison statemen to Working Party 5A regarding draft CPM text for WRC-19 agenda item 1.5
|
United States of America
|
AI1.5
|
2018-06-26 |
|
[ 539 ]
|
Revisions to working document toward preliminary draft CPM text for WRC-19 agenda item 1.5
|
United States of America
|
AI1.5
|
2018-06-26 |
|
[ 538 ]
|
Revisions to working document toward a preliminary draft new Report ITU-R S.[AGENDA ITEM 1.5] - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
United States of America
|
AI1.5
|
2018-06-26 |
|
[ 535 ]
|
Proposed addition to Section 4.2.1 of working document towards a preliminry draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency bands 27.5-29.5 GHz and 17.7-19.7 GHz
|
United States of America
|
AI1.5
|
2018-06-26 |
|
[ 534 ]
|
Proposed addition to Section 4.2.3 of working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency bands 27.5-29.5 GHz and 17.7-19.7 GHz
|
United States of America
|
AI1.5
|
2018-06-26 |
|
[ 513 ]
|
Comments on the example Resolution for WRC-19 agenda item 1.5
|
Kenya (Republic of)
,
Rwanda (Republic of)
|
AI1.5
|
2018-06-26 |
|
[ 509 ]
|
Earth stations in motion (ESIM) compatibility with non-GSO MSS feeder links in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2018-06-26 |
|
[ 508 ]
|
Proposed changes to working document towards draft CPM text for WRC-19 agenda item 1.5
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2018-06-26 |
|
[ 507 ]
|
Sharing and compatibility between ESIM and mobile service
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2018-06-26 |
|
[ 506 ]
|
Proposed changes to the example Resolution for the WRC-19 agenda item 1.5
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2018-06-26 |
|
[ 503 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
China (People's Republic of)
|
AI1.5
|
2018-06-26 |
|
[ 502 ]
|
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 1.5
|
China (People's Republic of)
|
AI1.5
|
2018-06-26 |
|
[ 496 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
China (People's Republic of)
|
AI1.5
|
2018-06-26 |
|
[ 482 ]
|
Revisions for the draft CPM text for WRC-19 agenda item1.5
|
Canada
|
AI1.5
|
2018-06-25 |
|
[ 478 ]
|
Proposed executive sumary for the working document towards draft CPM text for WRC-19 agenda item 1.5
|
Brazil (Federative Republic of)
|
AI1.5
|
2018-06-25 |
|
[ 474 ]
|
Proposed changes to example ESIM Resolution of Annex 29 Document 4A/675 Working Party 4A Chairman's Report - Working document toward draft CPM text for WRC-19 agenda item 1.5
|
Australia
|
AI1.5
|
2018-06-25 |
|
[ 462 ]
|
Proposed amendments to example Resolution [AI 1.5/XXX] for WRC-19 agenda item 1.5
|
Russian Federation
|
AI1.5
|
2018-06-22 |
|
[ 459 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MSS in the frequency band 27.5-29.5 GHz
|
Japan
|
AI1.5
|
2018-06-18 |
|
[ 458 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
Japan
|
AI1.5
|
2018-06-18 |
|
[ 439 ]
|
Proposed operational and regulatory considerations for use of ESIMs in the frequency bands 17.7-19.9 GHz and 27.5-29.5 GHz
|
Kenya (Republic of)
|
AI1.5
|
2018-02-13 |
|
[ 438 ]
|
Proposed changes to Annex 29 to Working Party 4A Chairman's Report - Working document toward draft CPM text for WRC-19 agenda item 1.5
|
Russian Federation
|
AI1.5
|
2018-02-13 |
|
[ 432 ]
|
Revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
Canada
|
AI1.5
|
2018-02-13 |
|
[ 421 ]
|
Modifications to working document towards a preliminary draft new Report/Recommendation ITU-R [LESIM-FS] - Statistical methodologies to estimate the interference into fixed service stations operating in the 27.5-29.5 GHz frequency band from land earth stations in motion (L-ESIM) communicating with FSS geostationary space stations
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 420 ]
|
Working document towards a PDN Report on sharing between ESIM and stations in the mobile service (WRC-19 agenda item 1.5)
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 410 ]
|
Revisions to working document towards a preliminary draft new Report ITU-R S.[ESIM] - Operation of earth stations in motion (ESIM) in fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 409 ]
|
Revisions to workig document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 408 ]
|
Revisions to working document toward preliminary draft CPM text for WRC-19 agenda item 1.5
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 407 ]
|
Revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 394 ]
|
Proposed changes to working document towards draft CPM text for WRC-19 agenda item 1.5
|
United Kingdom of Great Britain and Northern Ireland
,
Austria
,
France
,
Hungary
|
AI1.5
|
2018-02-13 |
|
[ 393 ]
|
ESIM compatibility with NGSO MSS feeder links in 19.3-19.7 GHz and 29.1-29.5 GHz bands
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2018-02-13 |
|
[ 392 ]
|
Sharing and compatibility between ESIM and terrestrial services
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2018-02-13 |
|
[ 391 ]
|
Maritime-ESIM coexistence with FS stations
|
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2018-02-13 |
|
[ 376 ]
|
Comments on Annex 11 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
Iran (Islamic Republic of)
|
AI1.5
|
2018-02-13 |
|
[ 375 ]
|
Comments on Annex 29 to Working Party 4A Chairman's Report - Working document toward draft CPM text for WRC-19 agenda item 1.5 - Agenda item 1.5 (WP 4A / WP 4B, WP 4C, WP 5A, WP 5C, WP 7C, (WP 3M), (WP 5D), (WP 7B))
|
Iran (Islamic Republic of)
|
AI1.5
|
2018-02-13 |
|
[ 374 ]
|
Comments on Annex 10 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S.[AGENDA ITEM 1.5] - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
Iran (Islamic Republic of)
|
AI1.5
|
2018-02-13 |
|
[ 373 ]
|
Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
China (People's Republic of)
|
AI1.5
|
2018-02-13 |
|
[ 359 ]
|
Analysis of the applicability of Resolution 156 (WRC-15) off-axis E.I.R.P. spectral density mask for WRC-19 agenda item 1.5 studies
|
Russian Federation
|
AI1.5
|
2018-02-12 |
Results:85 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):