International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP3K : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP3K  C 

ITU-R WP3K

Point-to-Area Propagation

Results:14 total items.
Contributions  [ Source: WP 6A ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 324 ]  
 
Reply liaison statement to Working Party 3K - Guidance for implementing second generation DTTB systems and methods for the evaluation of their quality of service and time variation in Monte Carlo simulations for coverage and interference assessment in the broadcasting service     WP 6A     2019-07-29
[ 275 ]  
 
Liaison statement to Working Parties 3L and 3K (copy for information to Working Parties 1A, 1B and 5A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field)     WP 6A     2019-04-30
[ 259 ]  
 
Liaison statement to Working Parties 1C and 3K - Guidance for implementing beyond 1st generation DTTB systems and methods for evaluation of their quality of service performance requirements     WP 6A     2018-10-31
[ 210 ]  
 
Liaison statement to Working Party 5A - Copied for information to Working Parties 3K, 3M, 5B and 5C - WRC-19 agenda item.1.1 sharing and compatibility studies     WP 6A   AI1.1   2018-05-11
[ 209 ]  
 
Liaison statement to Working Party 3K (copy for information to Working Party 3J and Working Party 3M) - Use of Modulation Error Ratio (MER) to assess ducting     WP 6A     2018-05-10
[ 206 ]  
 
Liaison statement to ITU-R Working Party 3K - Location variability in land area-coverage prediction     WP 6A     2017-10-23
[ 205 ]  
 
Liaison statement to Working Party 3K (copy for information to Working Parties 3J and 3M) - Use of Modulation Error Ratio (MER) to assess ducting     WP 6A     2017-10-23
[ 165 ]  
 
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13     Chairman, WP 6A   AI1.13   2017-04-05
[ 164 ]  
 
Liaison statement to Working Party 3K - Use of Modulation Error Ratio (MER) to assess ducting     WP 6A     2017-04-03
[ 163 ]  
 
Liaison statement to Working Party 3K - Location variability in land area-coverage prediction     WP 6A     2017-04-03
[ 84 ]  
 
Liaison statement to Working Party 3K (copy to ITU-R Study Group 3) - Ducting effects on received signal quality of digital TV services     WP 6A     2016-11-04
[ 83 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies     WP 6A     2016-11-04
[ 82 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) WRC-19 agenda item 1.1     WP 6A   AI1.1   2016-11-04
[ 3 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda item 1.1     WP 6A   AI1.1   2016-02-03
Results:14 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-5-3