International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1C  C 

ITU-R WP1C

Spectrum Monitoring

Results:10 total items.
Contributions  [ Source: WP 5D ]   Documents / Contributions
 
Number 
Title Source Date
[ 189 ]  
 
Reply liaison statement to ITU-R Working Parties 1A and 1C (copy to 3GPPRAN4/RAN5) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas     WP 5D   2019-03-05
[ 180 ]  
 
Reply liaison statement on revision of Recommendation ITU-R SM.329 (reply to ITU-R Working Parties 1A and 5D) - Unwanted emissions in the spurious domain     WP 5D   2018-10-19
[ 173 ]  
 
Liaison statement to Working Parties 1A and 1C - Definition of and test methods for OTA unwanted emission of IMT radio equipment     WP 5D   2018-07-11
[ 126 ]  
 
Response liaison statement to ITU-T Study Group 5 - Copy to ITU-R Study Group 1 - Considerations of EMC/EMI in relation to IMT     WP 5D   2018-02-13
[ 125 ]  
 
Liaison statement to Working Party 1C - Adjacent Channel Leakage Ratio (ACLR) measurements for IMT technologies     WP 5D   2018-02-12
[ 110 ]  
 
Liaison statement to Working Party 1A on unwanted emissions of IMT-2020 systems utilizing active antenna systems (AAS) and total radiated power (copy to Working Party 1C for information)     WP 5D   2017-10-13
[ 65 ]  
 
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means...     WP 5D   2017-02-24
[ 44 ]  
 
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017 (copied to ITU-R Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A for information)     WP 5D   2016-06-28
[ 9 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5D   2016-03-09
[ 8 ]  
 
Reply liaison statement to ITU-T Study Group 5, ITU-D Study Group 2, ITU-R Working Party 6A (copy for information to Working Parties 3L, 1B, 1C, 5A, 5B, 5C) on information about work that is being carried out within work under study in ITU-T Q7/5 (Human exposure to electromagnetic fields (EMFS) due to radio systems and mobile equipment)     WP 5D   2016-03-08
Results:10 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-7-17