International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1C  C 

ITU-R WP1C

Spectrum Monitoring

Results:7 total items.
Contributions  [ Source: WP 1B ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 187 ]  
 
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1)     WP 1B   AI9.1   2018-11-29
[ 116 ]  
 
Liaison statement to Working Party 4A (copy to Working Party 1C for information) - WRC-19 agenda item 9.1, issue 9.1.7     WP 1B   AI9.1   2017-12-08
[ 64 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...     WP 1B     2016-12-14
[ 63 ]  
 
Reply liaison statement from ITU-R Working Party 1B to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on Resolution 9 draft output Report (copy to ITU-D Study Group 1, ITU-R Working Parties 1C and 5A)     WP 1B     2016-12-14
[ 43 ]  
 
Liaison statement to Working Parties 1C and 4A (WRC-19 agenda item 9.1, issue 9.1.7) - Studies on managing uplink transmissions of terminals to be limited to authorized terminals     WP 1B   AI9.1   2016-06-20
[ 41 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...     WP 1B     2016-06-13
[ 40 ]  
 
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)     WP 1B     2016-06-13
Results:7 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-10-9