International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1C  C 

ITU-R WP1C

Spectrum Monitoring

Results:233 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 233 ]  
 
Liaison statement on work being carried out under study in ITU-T Q3/5     ITU-T SG 5     2019-10-15
[ 232 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 1A, 1B and 1C on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services     ITU-D SG 1     2019-10-02
[ 231 ]  
 
Liaison statement to Working Party 1C - Development of a new Report ITU-R SM.2454-0     WP 4C     2019-07-17
[ 230 ]  
 
Reply liaison statement to Working Party 7C (copy to ITU-R Working Parties 1C, 4A, 4B and 7D) - Interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors     WP 1A     2019-06-18
[ 229 ]  
 
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise     WP 1A     2019-06-18
[ 228 ]  
 
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reported cases of interference     WP 1A     2019-06-18
[ 227 ]  
 
Liaison statement on working being carried out under study in ITU-T Study Group 5 Question 3/5     ITU-T SG 5     2019-06-14
[ 226 ]  
+Ann.1-14 
Report of the meeting of Working Party 1C (Geneva, 28 May - 5 June 2019)     Chairman, WP 1C     2019-06-05
[ 225 ]  
 
Final list of participants - Working Party 1C (Geneva, 28 May - 5 June 2019)     Director, BR     2019-06-05
[ 224 ]  
 
Reply liaison statement to Working Party 1A (copy to ITU-R WP 1C, 4A, 4B and 7D) - Interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors     WP 7C     2019-05-31
[ 223 ]  
 
List of documents issued (Documents 1C/169 - 1C/223)     BR Study Groups Department     2019-05-27
[ 222 ]  
 
Proposal for revisions to preliminary draft new Recommendation ITU-R SM.[TDOA-ACC] - Test procedure for measuring geolocation accuracy of TDOA emitter location systems     Rohde & Schwarz GmbH & Co. KG   Q240/1   2019-05-21
[ 221 ]  
(Rev.1) 
Proposed new Annex 9 to include space radio monitoring station in Sultanate of Oman in the scope of Report ITU-R SM.2182     Oman (Sultanate of)     2019-05-21
[ 220 ]  
 
Report of Correspondence Group activities on the revision of Recommendation ITU-R SM.1392-2 on essential requirements for a spectrum monitoring system for developing countries     Chairman, CG on Rec. ITU-R SM.1392-2     2019-05-21
[ 219 ]  
 
Revision of Report ITU-R SM.2257-4 - Addition of result for spectrum management and monitoring during 2018 PyeongChang Winter Olympic and Paralympic Games     Korea (Republic of)     2019-05-21
[ 218 ]  
 
Method for the identification and the measurement of interference caused by indoor man-made noise in VHF band II and band III (contribution to ITU-R Working Party 1C with copy to Working Party 3L)     European Broadcasting Union     2019-05-21
[ 217 ]  
 
Key parameters for FHSS signal monitoring     China (People's Republic of)     2019-05-21
[ 216 ]  
 
Analysis of cuboid spectrum data of Internet based spectrum monitoring system     China (People's Republic of)     2019-05-21
[ 215 ]  
 
Working document towards a preliminary draft new Report and Recommendation - Use of small satellites for Spectrum Monitoring     China (People's Republic of)     2019-05-21
[ 214 ]  
 
This document has been withdrawn     Chairman, CG on Spectrum Monitoring Evolution     2019-05-27
[ 213 ]  
 
Activity Report of the Correspondence Group on preliminary draft new Recommendation on field strength measurement accuracy - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range     Chairman, CG on Field Strength Measurement Accu.     2019-05-21
[ 212 ]  
 
Proposal for a new Recommendation on test procedures for measuring accuracy of TDOA-based emitter location systems - Test procedures for measuring geolocation accuracy     CG on Geolocation accuracy     2019-05-21
[ 211 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R SM.[APP10] - Reporting Harmful Interference in support of Appendix 10 of the Radio Regulations     China (People's Republic of)   Q232/1   2019-05-21
[ 210 ]  
 
Proposed working document regarding a possible modification of preliminary draft new Report ITU-R SM.[EMF-MON] - Methodology for measuring WiFi exposure levels and description of the procedure for establishing the optimal frequency domain configuration of the measuring equipment     Universidad Del País Vasco   Q239/1   2019-05-21
[ 209 ]  
 
Proposals towards developing new version of the ITU Spectrum Monitoring Handbook     Russian Federation     2019-05-20
[ 208 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1875-2 - DVB T/T2 coverage measurements and comparison with coverage predictions     Russian Federation     2019-05-20
[ 207 ]  
 
Proposed modification to the working document towards a preliminary draft new Recommendation ITU R SM.[FS-MEAS-ACC] - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range     Japan     2019-05-20
[ 206 ]  
 
Proposed editorial revision of thirty one Recommendations assigned to ITU-R Working Party 1C     Chairman, SG 1 CG on editorial review     2019-05-17
[ 205 ]  
 
Comments for mandatory format to the ITU-R Recommendations assigned to ITU-R Working Party 1C     Chairman, SG 1 CG on editorial review     2019-05-17
[ 204 ]  
 
Report of measurement results in support of the working document towards a preliminary draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of Mobile DF units in operational environment     Greece     2019-05-17
[ 203 ]  
 
Proposal for revisions to preliminary draft new Recommendation ITU-R SM.[TDOA-ACC] - Test procedure for measuring geolocation accuracy of TDOA emitter location systems     United States of America   Q210/1   2019-05-14
[ 202 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of mobile DF units in operational environment     Egypt (Arab Republic of)     2019-05-14
[ 201 ]  
 
Activity Report - Electromagnetic field measurements to assess human exposure     Chairman, CG on Report ITU-R SM.[EMF-MON]   Q239/1   2019-05-14
[ 200 ]  
 
Draft new Report ITU-R SM.[EMF-MON] - Electromagnetic field measurements to assess human exposure     ATDI   Q239/1   2019-05-14
[ 199 ]  
 
Report of the CG work after the 2018 meeting of SG 1 on a preliminary draft revision of Report ITU-R SM.2355-0     Chairman, CG on Spectrum Monitoring Evolution     2019-05-13
[ 198 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[POPULATION_COVERAGE] - Population coverage measurement with public wireless networks     Chairman, CG on Population Coverage     2019-05-13
[ 197 ]  
 
Activity report of the Correspondence Group on developing a draft new Report on population coverage - Population coverage measurement with public wireless networks     Chairman, CG on Population Coverage     2019-05-13
[ 196 ]  
 
Activity Report of the Correspondence Group on preliminary draft new recommendation on field strength measurement accuracy - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range     Chairman, CG on Field Strength Measurement Accu.     2019-05-10
[ 195 ]  
 
Proposed modifications to the working document towards a preliminary draft new Recommendation ITU-R SM.[APP10] - Reporting Harmful Interference in support of Appendix 10 of the Radio Regulations     World Broadcasting Unions - Technical Committee     2019-05-07
[ 194 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1875-2 - DVB T/T2 coverage measurements and comparison with coverage predictions     CG DVB-T Coverage     2019-05-03
[ 193 ]  
 
Report of Correspondence Group activities on preliminary draft revision of Recommendation ITU-R SM.1875-2 on DVB-T/T2 Coverage measurements and verification of planning criteria     Chairman, CGon DVB-T Coverage Measurements     2019-05-03
[ 192 ]  
 
Proposed draft revision of Recommendation ITU-R SM.1268-4 - Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations     Germany (Federal Republic of)     2019-05-03
[ 191 ]  
 
Report on the activities of the Correspondence Group on radiomonitoring in the GNSS bands     Chairman, CG Meas-GNSS     2019-04-30
[ 190 ]  
 
Liaison statement on strategies and policies concerning human exposure to EMF     ITU-D SG 2     2019-04-11
[ 189 ]  
 
Reply liaison statement to ITU-R Working Parties 1A and 1C (copy to 3GPPRAN4/RAN5) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas     WP 5D     2019-03-05
[ 188 ]  
 
Liaison statement on ITU inter-Sector coordination     ITU-T TSAG     2018-12-17
[ 187 ]  
 
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1)     WP 1B   AI9.1   2018-11-29
[ 186 ]  
 
Proposed draft revision of Recommendation ITU-R SM.1054-0 - Monitoring of radio emissions from spacecraft at monitoring stations     Germany (Federal Republic of)     2018-11-27
[ 185 ]  
 
Draft new Report ITU-R SM.[SAT MON COOPERATION]     Germany (Federal Republic of)     2018-11-27
[ 184 ]  
 
Liaison statement to Working Parties 1C and 3L - Working document towards a preliminary draft new Report ITU-R M.[HF NOISE AT SEA]     WP 5B     2018-11-16
Results:233 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18