Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 266 ]
|
Liaison Statement to Working Party 1A (Copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448
and Appendix 7 (Rev.WRC-15) of the Radio Regulations
|
WP 4C
|
|
2018-02-20 |
|
[ 265 ]
|
Response liaison statement to ITU-T Study Group 5 - Copy to ITU-R Study Group 1 - Considerations of EMC/EMI in relation to IMT
|
WP 5D
|
|
2018-02-13 |
|
[ 264 ]
|
Revision of ITU-R SM.329 Unwanted emissions of IMT-2020 systems; measurement bandwidth
|
ATDI
|
Q222/1
|
2018-01-24 |
|
[ 263 ]
|
Further information regarding Documents 1/108-1A/262-1C/122-5D/790, 5D/791 and 5D/792
|
Director, BR
|
|
2018-01-12 |
|
[ 262 ]
|
Liaison statement on proposals to Recommendation ITU-R SM.329 about unwanted emission test
|
ITU-T SG 5
|
|
2017-12-19 |
|
[ 261 ]
|
Reply liaison statement to Working Party 7A (copy to Working Party 1A for information) - Work on WRC-19 agenda item 9.1, issue 9.1.6
|
WP 1B
|
AI9.1
|
2017-12-08 |
|
[ 260 ]
+Ann.1-13 |
Report on the fourth 2015-2019 meeting of Working Party 1A (Geneva, 23 - 30 November 2017)
|
Chairman, WP 1A
|
|
2017-11-30 |
|
[ 259 ]
(Rev.1) |
Final List of Participants - Working Party 1A (Geneva, 23-30 November 2017)
|
Director, BR
|
|
2017-11-30 |
|
[ 258 ]
|
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D
|
ITU-T SG 5
|
|
2017-11-23 |
|
[ 257 ]
|
List of documents issued (Documents 1A/208 - 1A/257)
|
BR Study Groups Department
|
|
2017-11-22 |
|
[ 256 ]
(Rev.1) |
Report of the work of the Rapporteur Group on Wireless Power Transmission
|
Acting Chairman, RG-WPT meeting
|
|
2017-11-22 |
|
[ 255 ]
|
Report on CISPR activities from June to November 2017
|
Rapporteur, SG 1 RG on liaison with CISPR
,
Rapporteur to CISPR on WPT issues
|
|
2017-11-21 |
|
[ 254 ]
|
Liaison statement to Working Parties 1A, 1B, 1C, 3L, 5A and 5C - Working document towards a preliminary draft new Report ITU-R M.[HF NOISE AT SEA]
|
WP 5B
|
|
2017-11-20 |
|
[ 253 ]
|
Reply liaison statement to ITU-R Working Party 1A (copy for information to Working Parties 5C, 7C and 7D) - WRC-19 agenda item 1.15
|
WP 5A
|
AI1.15
|
2017-11-17 |
|
[ 252 ]
|
Reply liaison statements from CISPR to ITU-R Study Group 1 Working Parties 1A and 1B on wireless power transfer
|
SG 1 Rapp. to CISPR on WPT issues
|
Q210/1, AI9.1
|
2017-11-17 |
|
[ 251 ]
|
Liaison statement to ITUR- Working Party 1A (copy to Working Parties 5A, 7C and 7D) - Input as related to WRC-19 agenda item 1.15
|
WP 5C
|
AI1.15
|
2017-11-17 |
|
[ 250 ]
|
Reply liaison statement to Working Party 1A (copied to Working Parties 5B, 5C and 5D for information) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services
|
WP 5A
|
|
2017-11-17 |
|
[ 249 ]
|
Proposed modifications to Annex 3 to Working Party 1B Chairman's Report - Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] - [Methodology for spectrum management of wireless power transmission (WPT)]
|
European Broadcasting Union
|
|
2017-11-16 |
|
[ 248 ]
|
Reply from IEC/TC69/WG7 and ISO/TC22/SC37/JPT19363 to liaison statement from Working Party 1A and Working Party 1B
|
International Electrotechnical Commission
,
International Organization for Standardization
|
|
2017-11-16 |
|
[ 247 ]
|
Recent developments concerning coexistence of wired telecommunication with radiocommunication systems (Questions ITU-R 221/1 and ITU-R 210-3/1)
|
Rapporteur, RG wired and radio
|
Q221/1, Q210/1
|
2017-11-16 |
|
[ 246 ]
|
Considerations on unwanted emissions of IMT-2020 system
|
China (People's Republic of)
|
|
2017-11-16 |
|
[ 245 ]
|
Sharing study between electric vehicle WPT system with other systems in China
|
China (People's Republic of)
|
|
2017-11-16 |
|
[ 244 ]
|
Comments to the ITU-R Recommendations and Reports assigned to ITU-R Working Party 1A
|
Korea (Republic of)
|
|
2017-11-16 |
|
[ 243 ]
|
Proposed revision to working document towards draft CPM text for WRC-19 agenda item 1.15 - Agenda item 1.15
|
Japan
|
AI1.15
|
2017-11-16 |
|
[ 242 ]
|
Proposed revision to working document towards a preliminary draft new Report ITU-R SM.[275-450GHZ_SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz
|
Japan
|
AI1.15
|
2017-11-16 |
|
[ 241 ]
|
Proposal of methodology of studies on the impact to sound broadcasting services in the MF band from wireless power transmission systems for electric vehicles
|
Japan
|
Q210/1, AI9.1
|
2017-11-16 |
|
[ 240 ]
|
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0
|
Japan
|
Q210/1, AI9.1
|
2017-11-16 |
|
[ 239 ]
|
Sharing studies between EESS (passive) and fixed service in the range 275-450 GHz
|
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
|
AI1.15
|
2017-11-15 |
|
[ 238 ]
|
Liaison statement to ITU-R Working Party 1A - Proposed revision of working document towards a preliminary draft new Report ITU-R SM.[WPT.WIDE-BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission via radio frequency wide-beam
|
Director, BR
|
Q210/1
|
2017-11-16 |
|
[ 237 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[VISIBLE-LIGHT] - Visible Light for Broadband Communications
|
Netherlands (Kingdom of the)
,
Korea (Republic of)
|
Q238/1
|
2017-11-15 |
|
[ 236 ]
|
Protection of sound broadcasting from emissions from WPT for EV (WRC-19 agenda item 9.1, issue 9.1.6) and text proposals for Report ITU-R SM.[WPT-SPEC-MNGM]
|
British Broadcasting Corporation (BBC)
|
AI9.1
|
2017-11-15 |
|
[ 235 ]
|
Draft revision of Report ITU-R SM.2351-2 - Smart grid utility management systems
|
United Kingdom of Great Britain and Northern Ireland
|
Q236/1
|
2017-11-14 |
|
[ 234 ]
|
Compatibility analyses between EESS (passive) and FS/LMS in the bands between 275-450 GHz identified for EESS operations under footnote 5.565
|
United States of America
|
AI1.15
|
2017-11-13 |
|
[ 233 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-150] - Technical characteristics and impact analyses of non-beam inductive Wireless Power Transmission (WPT) applications, excluding electric vehicle charging
|
United States of America
|
Q210/1
|
2017-11-13 |
|
[ 232 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[NAT-APR]- National approaches and experiences on the compatibility assessments between the sound-broadcasting service in the band 87-108 MHz and the aeronautical services in the band 108-137 MHz
|
United States of America
|
|
2017-11-13 |
|
[ 231 ]
|
Proposed revision of working document towards a preliminary draft new Report ITU-R SM.[275-450GHZ_SHARING] -Sharing studies between FS and EESS and RAS
|
Russian Federation
|
|
2017-11-13 |
|
[ 230 ]
|
Unwanted emissions in the spurious domain from wireless power transfer for Electric Vehicles
|
International Amateur Radio Union
|
AI9.1
|
2017-11-10 |
|
[ 229 ]
|
Reply liaison statement to Working Party 1A - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations on coordination areas around an earth-station
|
WPs 5A, 5B and 5C
|
|
2017-11-13 |
|
[ 228 ]
|
Liaison statement to Working Party 1A - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
|
WP 7C
|
|
2017-11-02 |
|
[ 227 ]
|
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
|
WP 4A
|
|
2017-11-01 |
|
[ 226 ]
|
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7D for information) - Studies on "Wireless Power Transmission (WPT)"
|
WP 7A
|
Q210/1
|
2017-11-01 |
|
[ 225 ]
|
Liaison statement to Working Party 1A (copy to Working Parties 5A, 5C) - WRC-19 agenda item 1.15
|
WP 7C
|
|
2017-10-31 |
|
[ 224 ]
|
Liaison statement to Working Parties 1A, 4A, 5A, 5C and Task Group 5/1 - Apportionment of EESS (passive) protection criteria in Recommendation ITU-R RS.2017
|
WP 7C
|
|
2017-10-31 |
|
[ 223 ]
(Rev.1) |
Liaison statement to ITU-R Working Parties 1A and 1C (copy to Working Parties 5D and 6A) - Interference to EESS (passive) sensors operating in the 1 400-1 427 MHz band caused by radiations at the intermediate frequency of satellite broadcast receiver equipment
|
WP 7C
|
|
2017-10-31 |
|
[ 222 ]
|
Reply liaison statement to ITU-R Working Party 1A on Resolution 63 (REV.WRC-12)
|
WP 7D
|
|
2017-10-30 |
|
[ 221 ]
|
Liaison statement to Working Party 1A - Compatibility between radio astronomy and fixed service operations in the spectrum band 275-450 GHz - WRC-19 agenda item 1.15
|
WP 7D
|
AI1.15
|
2017-10-30 |
|
[ 220 ]
|
Liaison statement to ITU-R Working Parties 1A and 1B Regarding - WRC-19 agenda item 9.1 issue 9.1.6
|
WP 6A
|
AI9.1
|
2017-10-23 |
|
[ 219 ]
|
Liaison statement to ITU-R Study Group 1 and ITU-R Working Parties 1A and 1B - Wireless Power Transmission (WPT)
|
WP 6A
|
Q210/1
|
2017-10-23 |
|
[ 218 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
|
WP 4C
|
|
2017-10-16 |
|
[ 217 ]
|
Liaison statement to Working Party 1A on unwanted emissions of IMT-2020 systems utilizing active antenna systems (AAS) and total radiated power (copy to Working Party 1C for information)
|
WP 5D
|
|
2017-10-13 |
Results:466 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):