International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7D  C 

ITU-R WP7D

Radio Astronomy

Results:183 total items.
Result page:   -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 158 ]  
+Ann.1-3 
Report of the meeting of Working Party 7D (Geneva, 20-25 May 2015)     Chairman, WP 7D     2015-05-25
[ 157 ]  
 
Final list of participants - Working Party 7D (20-25 May 2015)     Director, BR     2015-05-25
[ 156 ]  
 
List of documents issued (Documents 7D/140 - 7D/156)     BR Study Groups Department     2015-05-19
[ 155 ]  
 
Editorial correction to Annex 2 of Recommendation ITU-R RS.2066-0 - Protection of the radio astronomy service in the frequency band 10.6-10.7 GHz from unwanted emissions of synthetic aperture radars operating in the Earth exploration-satellite service (active) around 9 600 MHz     Committee on Radio Astronomy Frequencies     2015-05-13
[ 154 ]  
 
Proposals to changings of working document towards a preliminary draft new Report ITU-R RA.[SPACE-RA-THRESHOLD LEVELS]     Russian Federation   230/7   2015-05-12
[ 153 ]  
 
Working document toward a preliminary draft new Recommendation ITU-R RA.[PASSIVEBANDPROTECTION] - Protection of the radio astronomy service operating in passive service bands from unwanted emissions of active services     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science   146-2/7, 145-2/   2015-05-11
[ 152 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D - Revision of Recommendation ITU-R P.619 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth     WP 3M     2015-05-08
[ 151 ]  
 
Liaison statement to Working Party 5B - Compatibility studies with the Radio Astronomy Service operating in the band 14.47 - 14.5 GHz in the working document toward a preliminary draft new Report M.[UAS-FSS] (5B/761 Annex 18)     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science     2015-05-02
[ 150 ]  
 
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6.1 - Compatibility studies with the Radio Astronomy Service operating in the passive band 15.35 - 15.4 GHz relevant to proposed methods to satisfy agenda item 1.6     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science     2015-05-02
[ 149 ]  
(Rev.1) 
Liaison statement to Study Group 1 - Copy to Study Groups 5 and 7, ITU-D Study Group 2 and ITU-T Study Group 15     SG 6     2015-02-25
[ 148 ]  
 
Recommendation ITU-R M.1463-3 - Characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency band 1 215-1 400 MHz     SG 5     2015-02-25
[ 147 ]  
 
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     WP 5D     2015-02-10
[ 146 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - New Report ITU-R F.2323 - Fixed service use and future     WP 5C     2014-11-28
[ 145 ]  
 
Liaison statement to ITU-T Study Groups 5, 9 & 15 and ITU-R Working Parties 1A & 3M (copy to for information ITU-R Working Parties 5A, 5C, 6A & 7D) - Co-existence between Radiocommunication systems and new wired telecommunications standards     WP 5B     2014-11-10
[ 144 ]  
 
Reply liaison statement to Working Party 7D - WRC-15 agenda item 1.16     WP 5B     2014-11-10
[ 143 ]  
 
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Preliminary draft revision of Recommendation ITU-R F.758-5 - Systems parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference     WP 5C     2014-11-10
[ 142 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     WP 5A     2014-11-10
[ 141 ]  
 
Liaison statement to Working Party 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (for information)     WP 7B     2014-10-16
[ 140 ]  
+Ann.1-5 
Report of the meeting of Working Party 7D (Geneva, 1-7 October 2014)     Chairman, WP 7D     2014-10-07
[ 139 ]  
 
Final list of participants - Working Party 7D (Geneva,1-7 October 2014)     Director, BR     2014-10-07
[ 138 ]  
 
List of documents issued (Documents 7D/111 - 7D/138)     BR Study Groups Department     2014-09-30
[ 137 ]  
 
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)     ITU-T SG 9     2014-09-30
[ 136 ]  
 
Draft liaison statement to Working Party 7C - Recommendation ITU-R RA.1750 - Mutual planning between the Earth exploration-satellite service (active) and the radio astronomy service in the 94 GHz and 130 GHz band     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science     2014-09-24
[ 135 ]  
 
Draft new Recommendation ITU-R RS.[EESS9GHz-RAS-MITIGATION] - Protection of the radio astronomy service in the frequency band 10.6-10.7 GHz from unwanted emissions of synthetic aperture radars operating in the Earth exploration-satellite service (active) around 9 600 MHz     France , Germany (Federal Republic of)     2014-09-23
[ 134 ]  
 
Draft revision of Annex 2 to Document 7D/111 "Working document towards a preliminary draft new Report ITU-R RA.[RAS-VRADAR]"     United States of America     2014-09-19
[ 133 ]  
 
Recommendation ITU-R RA.1513     United States of America   227/7   2014-09-19
[ 132 ]  
 
Working document towards draft revision of Recommendation ITU-R RA.1513-1 - Levels of data loss to radio astronomy observations and percentage-of-time criteria resulting from degradation by interference for frequency bands allocated to the radio astronomy on a primary basis     United States of America     2014-09-19
[ 131 ]  
 
Working document towards a preliminary draft new Report ITU-R RA.[SPACE-RA-THRESHOLD LEVELS]     United States of America   230/7   2014-09-19
[ 130 ]  
 
Draft replay reply liaison statement to Working Party 5B on WRC-15 agenda item 1.16     Russian Federation     2014-09-18
[ 129 ]  
 
Working document toward a preliminary draft new Report ITU-R RA.[RAS-BRADAR] - Considerations related to compatibility between the radio astronomy service and automotive applications of the radiolocation service in the 76-81 GHz band     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science     2014-09-15
[ 128 ]  
 
Working document toward a preliminary draft new Recommendation ITU-R RA [PASSIVEBANDPROTECTION] - Protection of the radio astronomy service operating in passive service bands from unwanted emissions of active services     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science     2014-09-15
[ 127 ]  
 
Reply liaison statement to Working Party 7D - WRC-15 agenda item 1.10     WP 4C     2014-07-17
[ 126 ]  
 
Liaison statement to Working Parties 7C and 7D - Preliminary draft new Report ITU-R SM.[THZ_TREND] - Technology trends of active services in the bands above 275 GHz     WP 1A     2014-06-23
[ 125 ]  
 
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems     WP 1A     2014-06-20
[ 124 ]  
 
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - ITU-R interest in K series Recommendations     WP 1A     2014-06-20
[ 123 ]  
 
Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast     WP 1A     2014-06-20
[ 122 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D) - Considerations on the G.9700 power spectral density (PSD) limit mask     WP 1A     2014-06-20
[ 121 ]  
 
Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment     WP 1A     2014-06-20
[ 120 ]  
 
Liaison statement to ITU-T Study Group 15 and CENELEC (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference     WP 1A     2014-06-20
[ 119 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 1B     2014-06-19
[ 118 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     WP 1A     2014-06-19
[ 117 ]  
 
Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     WP 5A     2014-06-03
[ 116 ]  
 
Liaison statement to Working Party 7D - WRC-15 agenda item 1.16     WP 5B     2014-05-30
[ 115 ]  
 
Reply liaison statement to Working Party 7D - Possible modification of RR No. 5.511F     WP 5B     2014-05-29
[ 114 ]  
 
Reply liaison statement to Working Party 7D - Agenda item 1.18 - Systems characteristics and compatibility of automotive radars operating in the frequency band 77.5-78 GHz for sharing studies     WP 5B     2014-05-29
[ 113 ]  
 
Liaison statement to Working Parties 4C and 5B (copy for information to Working Parties 3M, 4A, 4B, 5A, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     WP 5C     2014-05-28
[ 112 ]  
 
Liaison statement to Working Party 1B (copy to Working Parties 7C and 7D for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 7B     2014-05-13
[ 111 ]  
+Ann.1-4 
Report of the meeting of Working Party 7D (Geneva, 6-13 May 2014)     Chairman, WP 7D     2014-05-13
[ 110 ]  
 
Final List of Participants - Working Party 7D (Geneva, 6-13 May 2014)     Director, BR     2014-05-13
[ 109 ]  
 
Possible modification of RR Footnote 5.511F     France     2014-04-29
Results:183 total items.
Result page:   -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-10-23