International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7B  C 

ITU-R WP7B

Space Radiocommunication Applications

Results:381 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 106 ]  
 
Liaison statement to JTG 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M)     WP 5D     2013-02-18
[ 105 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz     WP 5D     2013-02-18
[ 104 ]  
 
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics     JTG 4-5-6-7     2012-12-06
[ 103 ]  
 
Liaison statement to ITU-R Working Party 7B (copied for information to Working Party 5C) - Sharing the 7-8 GHz band between proposed EESS (Earth-to-space) under WRC-15 Agenda item 1.11 and existing terrestrial services     WP 5A     2012-11-28
[ 102 ]  
 
Liaison statement to Working Parties 4A, 7B, 7C and 7D (copy to Working Parties 5B, 5C and 5D) - WRC-15 Agenda item 1.6 - Characteristics of and protection criteria for mobile systems operating in the frequency range 14.5-15.35 GHz     WP 5A     2012-11-21
[ 101 ]  
 
Liaison statement to ITU-R Working Party 4A (copy to Working Parties 3M and 7B for information) - WRC-15 Agenda item 1.9 issue 1.9.1     WP 5A     2012-11-20
[ 100 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 and Study Group 4, 5, 6 and 7 - WRC-15 Agenda item 1.1 - Modelling considerations and other considerations for 5-6 GHz frequency range     WP 5B     2012-11-16
[ 99 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 98 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 97 ]  
 
Liaison statement to Working Party 7B - Draft revisions of Recommendations ITU-R F.1247-2, ITU-R F.1249-2 and ITU-R F.1509-1     WP 5C     2012-11-14
[ 96 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 7A, 7B, 7C and 7D for information) - WRC-15 Agenda item 1.8 - Possible review of the provisions relating to earth stations on board vessels in the 5 925-6 425 MHz and 14-14.5 GHz bands     WP 5C     2012-11-14
[ 95 ]  
 
Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))     WP 5C     2012-11-14
[ 94 ]  
 
Liaison statement to Working Party 7B - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.11     WP 5C     2012-11-14
[ 93 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 1B, 3M, 5C, 7B, 7D) - Information on amateur service systems at 77.5-78 GHz for use in sharing studies for WRC-15 Agenda item 1.18     WP 5A     2012-11-12
[ 92 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 91 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 90 ]  
 
Liaison statement to Working Parties 5A and 5C (for action) and Working Parties 4C, 5B, 7A, 7B, 7C and 7D (for information) - WRC-15 Agenda item 1.8     WP 4A     2012-10-05
[ 89 ]  
 
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B, 7C and 7D (copy to Working Parties 3M and 6B for information) - WRC-15 Agenda item 1.6     WP 4A     2012-10-05
[ 88 ]  
+Ann.1-21 
Report on the September 2012 meeting of Working Party 7B with a view to its next meeting (April 2013) (Manta, Ecuador, 24-28 September 2012)     Chairman, WP 7B     2012-09-28
[ 87 ]  
 
Final List of Participants - Working Party 7B (Manta, Ecuador, 24-28 September 2012)     Director, BR     2012-09-27
[ 86 ]  
 
Proposal for a new working document towards a preliminary draft new Recommendation ITU-R RS.[9GHZ-EESS-CHAR] - Characteristics of synthetic aperture radars operating in the Earth exploration-satellite service (active) around 9.6 GHz     Germany (Federal Republic of)     2012-09-14
[ 85 ]  
 
Working document towards a preliminary draft new Report - Compatibility between the Earth exploration-satellite Service (active) and the space research service in the frequency band 8 400-8 500 MHz     Germany (Federal Republic of)     2012-09-14
[ 84 ]  
 
Liaison statement to Working Parties 3M, 5A, 5C, 7B - WRC-15 Agenda item 1.9.1     WP 4A     2012-09-24
[ 83 ]  
 
Liaison statement to Working Party 7B - WRC-15 Agenda item 1.6     WP 4A     2012-09-24
[ 82 ]  
 
Liaison statement to Working Party 7B - WRC-15 Agenda item 9.1.1     WP 4C     2012-09-19
[ 81 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 Agenda item 1.10     WP 4C     2012-09-18
[ 80 ]  
 
Sharing study between the EESS (Earth-to-space) and the fixed service in the 7-8 GHz range     France , European Space Agency     2012-09-17
[ 79 ]  
 
Separation distance to protect SRS earth stations from FSS stations in the 8.45-8.5 GHz band     European Space Agency     2012-09-17
[ 78 ]  
 
Separation distance to protect SRS deep space stations from FSS and MMSS stations in the 8.4-8.45 GHz band - WRC-15 Agenda item 1.9.1 and 1.9.2     European Space Agency     2012-09-17
[ 77 ]  
 
Proposal for a preliminary draft new Report ITU-R SA.[EESS E-S 7-8 GHz_SHARING]: "Feasibility of sharing between EESS (Earth-to-space) systems and SRS (Earth-to-space) systems in the band 7 145-7 235 MHz     European Space Agency     2012-09-17
[ 76 ]  
 
Proposal for preliminary draft new Report ITU-R SA.[SPECTRUM REQUIREMENTS]: Spectrum requirements for future EESS uplinks in the 7/8 GHz range WRC-15 Agenda item 1.11     European Space Agency     2012-09-17
[ 75 ]  
 
Damage level of ESA deep space stations in the 8.4-8.5 GHz band - WRC-15 Agenda item 1.12     European Space Agency     2012-09-17
[ 74 ]  
 
WRC-15 Agenda item 1.9.2 - Sharing study between the EESS (space-to-Earth) and the maritime mobile satellite service in the band 8 025 - 8 400 MHz     European Space Agency     2012-09-17
[ 73 ]  
 
Characteristics, definitions and spectrum requirements of nano and picosatellites     Access Partnership Limited   [TBA]/7   2012-09-17
[ 72 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[NANOSAT-PICOSAT] - WRC-15 Agenda item 9.1.8 - Spectrum challenges in a nano/pico satellite environment     Canada     2012-09-14
[ 71 ]  
 
Proposed revisions to preliminary draft new Recommendation ITU-R SA.[EES/METSAT USAGE 401-403 MHz] - Basic general partitioning and sharing conditions for the band 401-403 MHz for future long-term coordinated use of data collection systems on geostationary and non-geostationary METSAT and EESS systems     Brazil (Federative Republic of)     2012-09-14
[ 70 ]  
 
Proposed revisions to preliminary draft new Recommendation ITU-R SA.[EES/MET CHAR] - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies     Brazil (Federative Republic of)   141-4/7, 139-4/7   2012-09-14
[ 69 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SA.1626 - Feasibility of sharing between the space research service (space-to-Earth) and the fixed and mobile services in the band 14.8-15.35 GHz     Russian Federation     2012-09-14
[ 68 ]  
 
Proposed modifications to preliminary draft revision of Recommendation ITU-R SA.1414 - Characteristics of data relay satellite systems     Russian Federation     2012-09-14
[ 67 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2     WP 4C     2012-09-14
[ 66 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R S.[R1.FSS]     Russian Federation     2012-09-14
[ 65 ]  
 
Proposed liaison statement to ITU-R Working Parties 5A and 5C - Sharing in 7-8 GHz band between proposed EESS (Earth-to-space) and existing terrestrial services     Japan     2012-09-14
[ 64 ]  
 
Proposed liaison statement to ITU-R Working Party 4C - Sharing and compatibility between proposed MMSS in the band 7 375-7 750 MHz (space-to-Earth) and 8 025-8 400 MHz (Earth-to-space) and existing science services     Japan     2012-09-14
[ 63 ]  
 
Proposal for working document - Compatibility between proposed MMSS in the band 8 025-8 400 MHz (Earth-to-space) and existing science services     Japan     2012-09-14
[ 62 ]  
 
Proposal for working document - Sharing between proposed FSS in the band 7 150-7250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space) and existing SRS systems     Japan     2012-09-14
[ 61 ]  
 
Proposed liaison statement to ITU-R Working Party 4A - Sharing between proposed FSS in the band 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space) and existing SRS systems     Japan     2012-09-14
[ 60 ]  
 
Considerations on compatibility studies under WRC-15 Agenda item 1.11     China (People's Republic of)     2012-09-14
[ 59 ]  
 
Proposed update of preliminary draft revision of Recommendation ITU-R SA.1414     China (People's Republic of)     2012-09-14
[ 58 ]  
 
Provisional work plan of WP 7B for WRC-15 Agenda item 1.13     China (People's Republic of)     2012-09-14
[ 57 ]  
 
Proposed liaison statement to Working Party 4C - WRC-15 Agenda item 1.10     France     2012-09-10
Results:381 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-19