Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 95 ]
|
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1
|
WP 5D
|
|
2012-10-16 |
|
[ 94 ]
|
Note to Study Group 5 (copy for information to WPs 5A, 5B and 5C) - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications
|
WP 5D
|
|
2012-10-16 |
|
[ 93 ]
|
Liaison statement to Working Party 5B - (copy to WPs 5A and 5C for information) - WRC-15 Agenda item 1.15
|
WP 5D
|
|
2012-10-15 |
|
[ 92 ]
|
Reply liaison statement to Working Party 5B - WRC-15 Agenda item 1.12 - Characteristics for radars operating in the radiodetermination service in the frequency bands 8 700-9 300 MHz and 9 900-10 500 MHz
|
WP 7C
|
|
2012-10-15 |
|
[ 91 ]
|
Liaison statement to Working Party 5B - Compatibility between EESS (active) and radiolocation within the 35.5-36 GHz band
|
WP 7C
|
|
2012-10-15 |
|
[ 90 ]
|
Liaison statement to Working Party 5B - WRC-15 Agenda item 1.18
|
WP 7D
|
|
2012-10-10 |
|
[ 89 ]
|
Liaison statement to Working Party 5B - Technical and operational characteristics of SRS systems operating in the frequency range 76-81 GHz in support of WRC-15 Agenda item 1.18
|
WP 7B
|
|
2012-10-09 |
|
[ 88 ]
|
Liaison statement to Working Parties 5A and 5C (for action) and Working Parties 4C, 5B, 7A, 7B, 7C and 7D (for information) - WRC-15 Agenda item 1.8
|
WP 4A
|
|
2012-10-05 |
|
[ 87 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3M, 4C and 5A) - WRC-15 Agenda item 1.7
|
WP 4A
|
|
2012-10-05 |
|
[ 86 ]
|
Liaison statement to Working Party 5B - WRC-15 Agenda item 1.5
|
WP 4A
|
|
2012-10-05 |
|
[ 85 ]
|
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B, 7C and 7D (copy to Working Parties 3M and 6B for information) - WRC-15 Agenda item 1.6
|
WP 4A
|
|
2012-10-05 |
|
[ 84 ]
|
Liaison statement to Study Group 5 and note to the Director, Radiocommunication Bureau - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications
|
SG 4
|
|
2012-10-04 |
|
[ 83 ]
|
Progress of the studies in response to ITU-R Resolutions
|
Chairman, SG 5
|
|
2012-09-24 |
|
[ 82 ]
|
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D
|
WP 4C
|
|
2012-09-18 |
|
[ 81 ]
|
Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2
|
WP 4C
|
|
2012-09-14 |
|
[ 80 ]
|
Proposal on the arrangement of ITU-R Recommendations of the "M"-series
|
Russian Federation
|
|
2012-08-29 |
|
[ 79 ]
|
Liaison statement to Working Party 5B - Compatibility studies in relation to Resolution 224 (Rev.WRC-12)
|
WP 5D
|
|
2012-07-23 |
|
[ 78 ]
|
Liaison statement to ITU-R Working Party 5B - World Radiocommunication Conference 2015 (WRC-15), Agenda item 1.16 - To consider regulatory provisions and spectrum allocations to enable possible new automatic identification system (AIS) technology applications and possible new applications to improve maritime radiocommunication in accordance with Resolution 360 (WRC-12)
|
International Maritime Organization
|
|
2012-07-10 |
|
[ 77 ]
|
Liaison statement to ITU-R Working Party 5B - Revision of Recommendation ITU-R M.1371-4 - Technical characteristics for an automatic identification system using time-division multiple access in the VHF maritime mobile band
|
International Maritime Organization
|
|
2012-07-10 |
|
[ 76 ]
|
Results of the 19th RAG meeting
|
Chairman, SG 5
|
|
2012-07-03 |
|
[ 75 ]
|
Liaison statement to Working Party 5B on propagation methods for the calculation of the target detection distance of automotive radars in the 77-78 GHz band
|
WP 3M
|
|
2012-07-02 |
|
[ 74 ]
|
Liaison statement to ITU-R Working Party 5B - World Radiocommunication Conference (WRC-15) Agenda Item 1.15
|
WP 3K
|
|
2012-06-29 |
|
[ 73 ]
(Rev.1) |
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies
|
WP 3M
|
|
2012-06-29 |
|
[ 72 ]
|
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS)
|
WPs 1A and 1B
|
|
2012-06-25 |
|
[ 71 ]
|
Reply liaison statement to Working Party 5B - WRC-15 Agenda item 1.18
|
WP 1B
|
|
2012-06-22 |
|
[ 70 ]
|
Liaison statement to Working Party 5B - Use of the fixed-satellite service to support safe operation of UAS in non-segregated air space (WRC-15 Agenda item 1.5)
|
WP 4A
|
|
2012-06-21 |
|
[ 69 ]
|
Liaison statement to Working Party 5B - WRC-15 Agenda item 1.6
|
WP 4A
|
|
2012-06-19 |
|
[ 68 ]
|
Liaison statement to CISPR and ITU-R Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - A database for the protection of radio services
|
WP 1A
|
|
2012-06-19 |
|
[ 67 ]
|
Liaison statement to ITU-R WPs 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (copy to ITU-R WP 3L and to ITU-T SGs 5, 9 and 15 for information and/or action if any) - Developments on coexistence of wired telecommunication (including PLT) and radiocommunication systems
|
WP 1A
|
|
2012-06-19 |
|
[ 66 ]
|
Liaison statement to Study Groups 3, 4, 5, 7 and relevant Working Parties - Active services operating above 275 GHz
|
SG 1
|
|
2012-06-15 |
|
[ 65 ]
|
Liaison statement to Working Parties 5B and 5C regarding studies related to WRC-15 Agenda item 1.4
|
WP 5A
|
|
2012-06-05 |
|
[ 64 ]
|
Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS) (copy for information to relevant Working Parties of Study Groups 1, 4, 6 and 7)
|
WP 5A
|
|
2012-06-05 |
|
[ 63 ]
|
Liaison statement to Working Parties 5B, 5C and 5D (copy to Working Parties 1B, 4A, 4B, 4C, 6A, 7B, 7C, 7D for information) - Preparations for WRC-15 Agenda item 1.3 in response to decisions of CPM15-1
|
WP 5A
|
|
2012-06-05 |
|
[ 62 ]
+Ann.2-32 |
Report of the meeting of Working Party 5B (Geneva, 22 May - 1 June 2012)
|
Chairman, WP 5B
|
|
2012-06-01 |
|
[ 61 ]
|
Final List of Participants - Working Party 5B (Geneva, 22 May-1 June 2012)
|
Director, BR
|
|
2012-06-01 |
|
[ 60 ]
|
Liaison statement to Working Party 5B - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.17
|
WP 5C
|
|
2012-05-30 |
|
[ 59 ]
|
Liaison statement to Working Party 5B - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.15
|
WP 5C
|
|
2012-05-29 |
|
[ 58 ]
|
Liaison statement to Working Parties 5A and 5B - Potential impact to the fixed service from vehicular collision avoidance radar in adjacent frequency bands 76-77 GHZ AND 77-81 GHz
|
WP 5C
|
|
2012-05-29 |
|
[ 57 ]
|
Liaison statement to Working Party 5B - Protection of RNSS receivers operating in 5 010-5 030 MHz from AM(R)S transmitters operating in 5 030-5 091 MHz
|
WP 4C
|
|
2012-05-28 |
|
[ 56 ]
|
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10
|
WP 4C
|
|
2012-05-28 |
|
[ 55 ]
|
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10
|
WP 4C
|
|
2012-05-28 |
|
[ 54 ]
|
Liaison statement to Working Parties 4A, 5A, 5C and 7B (copy to Working Parties 3M, 4B and 5B for information) - WRC-15 Agenda item 1.9.2
|
WP 4C
|
|
2012-05-28 |
|
[ 53 ]
|
Liaison statement to Working Party 5B - (Copy to WP 5C and WP 5D for information) - WRC-15 Agenda item 1.15
|
WP 5A
|
|
2012-05-25 |
|
[ 52 ]
|
List of documents issued
|
BR Study Groups Department
|
|
2012-05-21 |
|
[ 51 ]
|
Preliminary draft new Recommendation - Operational and technical characteristics and protection criteria of radio altimeters utilizing the band 4 200-4 400 MHz
|
France
|
|
2012-05-15 |
|
[ 50 ]
|
Characteristics of and protection criteria for radars operating in the radionavigation service in the frequency band 76-81 GHz
|
Germany (Federal Republic of)
|
|
2012-05-15 |
|
[ 49 ]
|
Proposed modification to working document toward a preliminary draft new Report ITU-R M.[MAN OVERBOARD SYSTEM] - Specifications, design and use of maritime survivor locating systems and devices (man overboard systems)
|
Germany (Federal Republic of)
|
|
2012-05-15 |
|
[ 48 ]
|
Working document towards a preliminary draft new Report ITU-R M.[MAN OVERBOARD SYSTEM] - Specifications, design and use of maritime survivor locating systems and devices (man overboard systems)
|
Australia
|
|
2012-05-15 |
|
[ 47 ]
|
Draft liaison statement to Working Party 7C - WRC-15 Agenda item 1.12 - Characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency bands 8 700-9 300 MHz and 9 900-10 500 MHz
|
Germany (Federal Republic of)
|
|
2012-05-15 |
|
[ 46 ]
|
Report on live trials of AIS personal locator beacons for signalling and resolving man overboard incidents
|
United Kingdom of Great Britain and Northern Ireland
|
|
2012-05-14 |
Results:895 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):