Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 545 ]
|
Proposals for revision of Recommendation ITU-R M.493-13
|
TDC A/S
|
|
2014-05-09 |
|
[ 544 ]
|
Working document of proposals on revisions to the preliminary draft new Report ITU-R M.[VDES]
|
China (People's Republic of)
|
|
2014-05-12 |
|
[ 543 ]
|
Proposals on revision to draft CPM text
|
China (People's Republic of)
|
|
2014-05-09 |
|
[ 542 ]
|
Assessment of the inter-system interference caused by other FSS satellites to earth station receiver on-board UAV for link 2 - WRC-15 agenda item 1.5
|
China (People's Republic of)
|
|
2014-05-09 |
|
[ 541 ]
|
Proposed modifications to the working document toward a preliminary report on agenda item 1.18
|
France
|
|
2014-05-09 |
|
[ 540 ]
|
Proposed modifications to draft CPM text on agenda item 1.18
|
France
|
|
2014-05-09 |
|
[ 539 ]
|
On the compatibility of radiolocations service and radio amateur service in the band 77.5-78 GHz
|
France
|
|
2014-05-09 |
|
[ 538 ]
|
Modification to working document towards draft CPM text
|
Finland
,
France
,
Germany (Federal Republic of)
,
Ireland
,
Netherlands (Kingdom of the)
,
Norway
,
Romania
,
Spain
,
Sweden
|
|
2014-05-09 |
|
[ 537 ]
|
Justification of the channel plan for VDES under agenda item 1.16
|
France
,
Germany (Federal Republic of)
,
Ireland
,
Netherlands (Kingdom of the)
,
Romania
,
Spain
,
Sweden
|
|
2014-05-09 |
|
[ 536 ]
|
Practical guidance for GMDSS
|
Indonesia (Republic of)
|
|
2014-05-09 |
|
[ 535 ]
|
Proposed liaison statement to Joint Task Group 4-5-6-7 mitigation techniques - Possible mitigation techniques to address interference to radiodetermination from the potential use of the frequency bands 5 350-5 470 MHz and 5 725-5 850 MHz by RLANs
|
Germany (Federal Republic of)
|
|
2014-05-08 |
|
[ 534 ]
|
Bistatic radars in the 5 GHz-band
|
Germany (Federal Republic of)
|
|
2014-05-08 |
|
[ 533 ]
|
Comments on the studies carried out within the scope of Report ITU-R M.[UAS-FSS] - WRC-15 agenda item 1.5
|
Germany (Federal Republic of)
|
|
2014-05-08 |
|
[ 532 ]
|
Revision of Recommendation ITU-R M.1174-2, experiences of compatibility between analogue and digital systems in the land mobile service in the UHF band
|
Germany (Federal Republic of)
|
|
2014-05-08 |
|
[ 531 ]
|
Proposed modifications on the draft CPM text on agenda item 1.5
|
Germany (Federal Republic of)
,
Finland
,
Latvia (Republic of)
,
Lithuania (Republic of)
,
Luxembourg
,
Norway
,
Portugal
,
Romania
,
Spain
|
|
2014-05-08 |
|
[ 530 ]
|
Proposed amendments to Annex 3 of working document towards a preliminary draft new Report ITU-R M.[UAS-FSS] - Techniques to mitigate the impairments and failures affecting unmanned aircraft system command and non-payload communication links
|
Germany (Federal Republic of)
|
|
2014-05-08 |
|
[ 529 ]
|
VDES channel sounding campaign trial report
|
Australia
,
United Kingdom of Great Britain and Northern Ireland
|
|
2014-05-08 |
|
[ 528 ]
|
Proposal for modification of draft CPM text on WRC-15 agenda item 1.16
|
Russian Federation
|
|
2014-05-08 |
|
[ 527 ]
|
Working document towards draft revised Recommendation ITU-R M.1174-2
|
Russian Federation
|
|
2014-05-08 |
|
[ 526 ]
|
Proposals on modifications to draft CPM Report (WRC-15 agenda item 1.15)
|
Russian Federation
|
|
2014-05-08 |
|
[ 525 ]
|
Proposed amendments to the draft CPM text - WRC-15 agenda item 1.18
|
Russian Federation
|
|
2014-05-08 |
|
[ 524 ]
|
Review of the Study Group 5 Questions assigned to the Working Parties
|
Chairman, SG 5
|
|
2014-05-08 |
|
[ 523 ]
|
Working document towards a preliminary draft new Report ITU-R M.[AUTOMOTIVE RADARS] - [Systems characteristics and compatibility of automotive radars operating in the frequency band 77.5-78 GHz for sharing studies]
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
|
|
2014-05-07 |
|
[ 522 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R M.493-13 - Digital selective-calling system for use in the maritime mobile service
|
Australia
|
|
2014-05-06 |
|
[ 521 ]
|
Working document towards a preliminary draft new Report ITU-R M.[COM RAD] - Impact on radar probability of detection due to interference from International Mobile Telecommunication systems
|
Australia
|
|
2014-05-06 |
|
[ 520 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R M.1464-1 - Characteristics of radiolocation radars, and characteristics and protection criteria for sharing studies for aeronautical radionavigation radars in the radiodetermination service operating in the frequency band 2 700-2 900 MHz
|
Australia
|
|
2014-05-06 |
|
[ 519 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R M.1460-1 - Technical and operational characteristics and protection criteria of radiodetermination radars in the frequency band 2 900-3 100 MHz
|
Australia
|
|
2014-05-06 |
|
[ 518 ]
|
Proposed revision to working document towards a preliminary draft new Report ITU-R M.[ADS-OCEAN] on expanding the operational benefits of automatic dependent surveillance broadcast to oceanic and remote areas without ground infrastructure
|
International Civil Aviation Organization
|
|
2014-05-01 |
|
[ 517 ]
|
Proposed modification of draft CPM text Chapter 3 - WRC-15 agenda item 1.15
|
United Kingdom of Great Britain and Northern Ireland
|
|
2014-04-30 |
|
[ 516 ]
|
Preliminary draft revision of Recommendation ITU-R M.1174-2
|
United Kingdom of Great Britain and Northern Ireland
|
|
2014-04-30 |
|
[ 515 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R M.1465-1 - Characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency band 3 100-3 700 MHz
|
Australia
|
|
2014-05-06 |
|
[ 514 ]
|
Liaison statement to Working Party 1A - Proposal of revision of Recommendation ITU-R SM.337 - Impact of duty cycle on frequency and distance separation for various wave signal interferers
|
France
|
|
2014-04-29 |
|
[ 513 ]
|
Working document towards a preliminary draft new Report - Guidelines for the use of spectrum by oceanographic radars in the frequency range 3 to 50 MHz
|
France
|
|
2014-04-29 |
|
[ 512 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, Joint Task Group 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2., 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)
|
World Meteorological Organization
|
|
2014-04-28 |
|
[ 511 ]
|
Liaison statement on considerations on wired telecommunication systems being developed under G.fast
|
ITU-T SG 15
|
|
2014-04-22 |
|
[ 510 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4B, 4C, 5A, 5C and 5D) - Development of draft new Recommendation on main functionalities of consumer receivers for worldwide broadcasting roaming
|
WP 6A
|
|
2014-04-11 |
|
[ 509 ]
|
Liaison statement to Working Party 1A - Copy to Working Parties 1C, 5A, 5B, 5C and ITU-T Study Group 5 - Recommendations ITU-T K.60 and K.mhn - Coexistence of wired and wireless communication systems
|
WP 6A
|
|
2014-04-10 |
|
[ 508 ]
|
Liaison statement to Working Party 5B - WRC-15 agenda items 1.10 and 1.17
|
WP 4C
|
|
2014-03-24 |
|
[ 507 ]
|
Liaison statement to Working Party 5B - WRC-15 agenda item 1.10 - Technical characteristics, protection criteria, and sharing studies for aeronautical mobile service systems in the frequency bands 22.5-23.6 and 25.25-27.5 GHz
|
WP 4C
|
|
2014-03-24 |
|
[ 506 ]
|
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5B, 5C and 7B - WRC-15 agenda item 1.9.2
|
WP 4C
|
|
2014-03-24 |
|
[ 505 ]
|
Liaison statement to Working Party 5B - Terminology and associated definitions produced by on-going work in Working Party 5B
|
CCV
|
|
2014-03-19 |
|
[ 504 ]
|
Liaison statement to Working Party 5B - Satellite reception of ADS-B signals
|
WP 4C
|
|
2014-03-07 |
|
[ 503 ]
|
Liaison statement to Working Party 5B - WRC-15 agenda item 1.5
|
WP 4A
|
|
2014-03-07 |
|
[ 502 ]
|
Liaison statement to Working Party 5B - WRC-15 agenda item 1.7
|
WP 4A
|
|
2014-03-07 |
|
[ 501 ]
|
Liaison statement to Working Party 5B - WRC-15 agenda item 1.6
|
WP 4A
|
|
2014-03-07 |
|
[ 500 ]
|
Liaison statement to Working Parties 5A, 5B and 7C - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency band 5 350-5 470 MHz by RLANs
|
JTG 4-5-6-7
|
|
2014-03-07 |
|
[ 499 ]
|
Liaison statement to ITU-T Study Group 15 and ITU-R Working Party 1A (copy to ITU-R Working Party 5B for information) - Coexistence of wired telecommunications (including PLT) with radiocommunications systems - consideration with respect to work on Recommendation ITU-T G.fast
|
WP 4C
|
|
2014-03-05 |
|
[ 498 ]
|
Liaison statement to Working Party 5B (copy to Working Party 4A) - Summary of generic unwanted emission characteristics found in (1) Recommendation ITU-R M.1580/81 (IMT-2000) and (2) preliminary draft new Recommendation ITU-R M.[IMT.OOBE X] (IMT-Advanced)
|
WP 5D
|
|
2014-02-28 |
|
[ 497 ]
|
Question ITU-R 236-1/7
|
SG 7
|
|
2014-02-27 |
|
[ 496 ]
|
Reply liaison statement to Working Party 5B - WRC-15 agenda item 1.5
|
WP 4B
|
|
2014-02-26 |
Results:895 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):