Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 669 ]
|
Comments on working document toward a preliminary draft new Recommendation ITU-R M.[V2X]
|
Institute of Electrical and Electronics Engineers, Inc.
|
|
2015-06-05 |
|
[ 668 ]
|
Comments on working document towards a preliminary draft new Recommendation ITU-R M.[V2X]
|
Institute of Electrical and Electronics Engineers, Inc.
|
|
2015-05-23 |
|
[ 667 ]
|
Results of the 22nd RAG meeting
|
Chairman, SG 5
|
|
2015-05-13 |
|
[ 666 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D - Revision of Recommendation ITU-R P.619 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth
|
WP 3M
|
|
2015-05-08 |
|
[ 665 ]
|
Activity Report for Working Party 5A
|
CG on Local Coverage
|
|
2015-05-06 |
|
[ 664 ]
|
Liaison statement to Working Party 5A - Results of 5 GHz RLAN (802.11AC) access point emission pattern measurements of consumer and enterprise devices
|
WP 3K
|
|
2015-05-05 |
|
[ 663 ]
(Rev.1) |
Progress of the studies requested by WRC Resolutions and Recommendations (except those directly related to WRC-15 agenda items)
|
Chairman, SG 5
|
|
2015-04-15 |
|
[ 662 ]
|
Liaison statement to 3GPP regarding scope and status relevant to PPDR work items and study items (copy to Working Parties 5A and 5D)
|
Asia-Pacific Telecommunity
|
|
2015-03-26 |
|
[ 661 ]
|
Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters
|
WP 6A
|
|
2015-03-03 |
|
[ 660 ]
(Rev.1) |
Liaison statement to Study Group 1 - Copy to Study Groups 5 and 7, ITU-D Study Group 2 and ITU-T Study Group 15
|
SG 6
|
|
2015-02-25 |
|
[ 659 ]
|
Results from the Ninth meeting of Study Group 5 (10 - 11 November 2014) of interest to Working Party 5A
|
Chairman, WP 5A
|
|
2015-02-20 |
|
[ 658 ]
|
Note to the Director of Radiocommunication Bureau (copy for information to Working Party 5A) - Revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing
|
SG 5
|
|
2015-02-12 |
|
[ 657 ]
|
Liaison statement on comments to the WHO Monograph "Radio Frequency fields: Environmental Health Criteria, Chapter 2: Sources, measurements and exposures"
|
ITU-T SG 5
|
|
2015-02-10 |
|
[ 656 ]
|
Liaison statement to Working Party 1B (copy to WPs 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
|
WP 5D
|
|
2015-02-10 |
|
[ 655 ]
|
Liaison statement on the review of ITU-R Questions
|
WP 5D
|
|
2015-02-10 |
|
[ 654 ]
|
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
|
WP 5D
|
|
2015-02-10 |
|
[ 653 ]
|
Liaison statement on Recommendations ITU-T K.60 - Coexistence of wired and wireless communication systems
|
ITU-T SG 5
|
|
2015-02-10 |
|
[ 652 ]
|
Liaison statement on ITU-T Question 7/5 work items for the 2014-2018 study period (reply to ITU-D Study Group 2 - Document 2/113)
|
ITU-T SG 5
|
|
2015-02-10 |
|
[ 651 ]
|
Liaison statement to Working Parties 6A and 6B (copy for information to Working Party 5A) - Audio-visual capabilities and applications provided over terrestrial IMT systems
|
WP 5D
|
|
2015-02-09 |
|
[ 650 ]
|
Liaison statement from ITU-D Study Group 1 Question 7/1 to ITU-R Study Group 5 Working Party 5D on work on Question ITU-R 254/5 - Access to telecommunication/ICT services by persons with disabilities and with specific needs
|
ITU-D SG 1 Rapporteur
|
|
2015-01-19 |
|
[ 649 ]
|
Liaison statement from ITU-D/ITU-R Joint Group for Resolution 9 to ITU-R SG 1, ITU-R SG 5, ITU-R SG 6 and their relevant Working Parties on work items during the 2014-2017 study period
|
ITU-D SG 1
|
|
2015-01-08 |
|
[ 648 ]
|
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan
|
ITU-T SG 15
|
|
2015-01-07 |
|
[ 647 ]
|
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan
|
ITU-T SG 15
|
|
2015-01-07 |
|
[ 646 ]
|
Liaison statement on consented revised Recommendation ITU-T G.9959
|
ITU-T SG 15
|
|
2014-12-12 |
|
[ 645 ]
|
Liaison statement on treatment about FG-DR&NRR deliverables (reply to ITU-T SG2-LS056)
|
ITU-T SG 15
|
|
2014-12-12 |
|
[ 644 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C as responsible Groups for WRC-15 agenda item 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1 (Issues 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8), 10 (copy to Working Party 5D)
|
Organizaiton Meteorological Organization
|
|
2014-12-10 |
|
[ 643 ]
|
Liaison statement to Working Party 5C (copied to Working Parties 4A, 4C, 5A, 7B and 7C) - Television broadcast receiving antenna pattern for use in sharing studies in the frequency range 470-862 MHz
|
WP 6A
|
|
2014-12-01 |
|
[ 642 ]
|
Reply liaison statement to ITU-T Study Group 15, ITU-R Working Party 5D, MEF (copy to ITU-R Working Party 5A, 3GPP, BBF for information) - Work on draft new Report ITU-R F.[FS.IMT/BB]
|
WP 5C
|
|
2014-11-28 |
|
[ 641 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - New Report ITU-R F.2323 - Fixed service use and future
|
WP 5C
|
|
2014-11-28 |
|
[ 640 ]
|
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WP 5B
|
|
2014-11-11 |
|
[ 639 ]
|
Liaison statement to ITU-T Study Groups 5, 9 & 15 and ITU-R Working Parties 1A & 3M (copy to for information ITU-R Working Parties 5A, 5C, 6A & 7D) - Co-existence between Radiocommunication systems and new wired telecommunications standards
|
WP 5B
|
|
2014-11-10 |
|
[ 638 ]
|
Liaison statement to Working Party 1B (copied for information to Working Parties 5A, 5C & 5D) - Liaison statement on the development of a working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
|
WP 5B
|
|
2014-11-10 |
|
[ 637 ]
|
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Preliminary draft revision of Recommendation ITU-R F.758-5 - Systems parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference
|
WP 5C
|
|
2014-11-10 |
|
[ 636 ]
+Ann.1-14 |
Report on the fourteenth meeting of Working Party 5A (Geneva, 27 October - 6 November 2014)
|
Chairman, WP 5A
|
|
2014-11-06 |
|
[ 635 ]
|
Final list of participants - Working Party 5A (Geneva, 27 October - 6 November 2014)
|
Director, BR
|
|
2014-06-11 |
|
[ 634 ]
|
Report on relevant activities in certain countries in Region 2
|
Liaison Rapporteur
|
|
2014-11-05 |
|
[ 633 ]
|
Report on the recent activities of Wireless World Research Forum (WWRF)
|
WWRF Liaison Rapporteur
|
|
2014-10-27 |
|
[ 632 ]
|
Report on relevant activities in certain countries in Region 3
|
Liaison Rapporteur
|
|
2014-10-27 |
|
[ 631 ]
(Rev.1) |
List of documents issued (Documents 5A/543 - 5A/635)
|
BR Study Groups Department
|
|
2014-10-27 |
|
[ 630 ]
|
Report on disaster relief
|
Disaster Relief Liaison Rapporteur
|
|
2014-10-24 |
|
[ 629 ]
|
Liaison statement to Working Party 5C (copy to Working Party 5A) - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
WP 5D
|
|
2014-10-23 |
|
[ 628 ]
|
Liaison statement to ITU-T Study Group 13 (copy for information to ITU-D Study Groups 1 and 2, ITU-T Study Group 15, ITU-R Study Group 5, and ITU-T Working Party 5A) - Roadmap on IMT and new areas for study under IMT
|
WP 5D
|
|
2014-10-23 |
|
[ 627 ]
|
Liaison statement to Working Party 5A on revision of Recommendation ITU-R M.2009
|
WP 5D
|
|
2014-10-23 |
|
[ 626 ]
|
Liaison statement to Working Parties 5A and 6A - Interactive unicast and multicast audio-visual capabilities and applications provided over terrestrial International Mobile Telecommunication (IMT) systems
|
WP 5D
|
|
2014-10-23 |
|
[ 625 ]
|
Proposed modifications to the preliminary draft new Report ITU-R [LMS.CRS2]
|
Orange
,
Telecom Italia S.p.A.
|
|
2014-10-20 |
|
[ 624 ]
|
Draft new Recommendation ITU-R M.[MS 14.5-15.35 CHAR] - Characteristics of and protection criteria for systems operating in the mobile service in the frequency range 14.5-15.35 GHz
|
United States of America
|
|
2014-10-20 |
|
[ 623 ]
|
Guide to the use of ITU-R texts relating to the amateur and amateur-satellite services
|
International Amateur Radio Union
|
|
2014-10-20 |
|
[ 622 ]
|
Revision of remarks on a study within preliminary draft new Report ITU-R M.[5 MHZ COMPAT] - Elements of a compatibility study with aeronautical mobile (R) service in the 5 450-5 480 kHz frequency band
|
International Amateur Radio Union
|
|
2014-10-20 |
|
[ 621 ]
|
Impact of alternative RLAN channelisation on the compatibility between RLAN 5 GHz and EESS (active) in the band 5 350-5 470 MHz
|
European Space Agency
|
|
2014-10-20 |
|
[ 620 ]
|
Proposed modification to working document toward a preliminary new Report ITU-R M.[ITS USAGE] - Intelligent transport systems usage report in ITU-R member countries
|
Japan
|
|
2014-10-20 |
Results:744 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):