Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 469 ]
|
Studies on WRC-15 agenda item 1.16 in particular a compatibility with mobile service for which 160 MHz band is allocated on a primary basis
|
Russian Federation
|
|
2014-05-08 |
|
[ 468 ]
|
Proposals on update of working document towards a preliminary draft new Report ITU-R M.[5 MHz COMPAT] - Compatibility analysis of possible amateur systems with fixed, land mobile, maritime mobile and radiolocation services in the frequency band 5 250-5 450 kHz and the aeronautical mobile service in an adjacent band
|
Russian Federation
|
|
2014-05-08 |
|
[ 467 ]
|
Proposals on update of working document towards the draft CPM text for WRC-15 agenda item 1.4
|
Russian Federation
|
|
2014-05-08 |
|
[ 466 ]
|
Working document towards revision of Resolution 646 for broadband mobile public protection and disaster relief (PPDR) under WRC15 agenda item 1.3
|
Israel (State of)
|
|
2014-05-05 |
|
[ 465 ]
|
An examination of possible mitigation techniques to address sharing between EESS (active) and RLANS in the band 5 350-5 470 MHz
|
Canada
|
|
2014-05-01 |
|
[ 464 ]
|
Proposed draft reply liaison statement to Working Party 1B - WRC-15 agenda item 9.1, issue 9.1.7
|
Canada
|
|
2014-05-01 |
|
[ 463 ]
|
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5C, 5D, ITU-T Study Group 15 Question 1 and ITU-T Study Group 13 Question 15 - Access technology for broadband telecommunications including IMT, for developing countries
|
ITU-D SG 2
|
|
2014-04-29 |
|
[ 462 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, Joint Task Group 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2., 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)
|
World Meteorological Organization
|
|
2014-04-28 |
|
[ 461 ]
|
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan
|
ITU-T SG 15
|
|
2014-04-22 |
|
[ 460 ]
|
Liaison statement on considerations on wired telecommunication systems being developed under G.fast
|
ITU-T SG 15
|
|
2014-04-22 |
|
[ 459 ]
|
Liaison statement to Working Party 5A - Working document toward a preliminary draft new Report ITU-R M.[ITS_USAGE] - The usage of Intelligent Transport Systems in ITU-R member countries
|
Asia-Pacific Telecommunity
|
|
2014-04-16 |
|
[ 458 ]
|
Liaison statement to ITU-R Working Party 5A - The proposed revision of Recommendation ITU-R M.2015 (Frequency arrangements for public protection and disaster relief radiocommunication systems in UHF bands in accordance with Resolution 646 (Rev. WRC-12)) and the proposed revision of Recommendation ITU-R M.2009 (Radio interface standards for use by public protection and disaster...
|
Asia-Pacific Telecommunity
|
|
2014-04-16 |
|
[ 457 ]
|
Report
|
CG on Rep. M.[PPDR]
|
|
2014-04-15 |
|
[ 456 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4B, 4C, 5A, 5C and 5D) - Development of draft new Recommendation on main functionalities of consumer receivers for worldwide broadcasting roaming
|
WP 6A
|
|
2014-04-11 |
|
[ 455 ]
|
Liaison statement to Working Party 1A - Copy to Working Parties 1C, 5A, 5B, 5C and ITU-T Study Group 5 - Recommendations ITU-T K.60 and K.mhn - Coexistence of wired and wireless communication systems
|
WP 6A
|
|
2014-04-10 |
|
[ 454 ]
|
Liaison statement to Working Party 5A (copy for information to Working Parties 5C and 5D) - The use of mobile broadband networks for Electronic news gathering (ENG) applications in the mobile service
|
WP 6A
|
|
2014-04-10 |
|
[ 453 ]
|
Liaison statement on IoT-Roadmap, IoT-work program, contacts and invitation to participate in IoT-GSI events
|
ITU-T JCA-IoT
|
|
2014-04-09 |
|
[ 452 ]
|
Liaison statement on fixed service backhaul networks for IMT and other terrestrial mobile broadband systems
|
ITU-T SG 13
|
|
2014-04-07 |
|
[ 451 ]
|
Liaison statement to Working Party 5A - WRC-15 agenda item 9.1, issue 9.1.1
|
WP 4C
|
|
2014-03-24 |
|
[ 450 ]
|
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10
|
WP 4C
|
|
2014-03-24 |
|
[ 449 ]
|
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5B, 5C and 7B - WRC-15 agenda item 1.9.2
|
WP 4C
|
|
2014-03-24 |
|
[ 448 ]
|
Reply liaison statement to Working Party 5C (copy to Working Parties 5A and 7B for information) WRC-15 agenda item 1.9.1
|
WP 4A
|
|
2014-03-07 |
|
[ 447 ]
|
Liaison statement to Working Party 5A - WRC-15 agenda item 1.6
|
WP 4A
|
|
2014-03-07 |
|
[ 446 ]
|
Liaison statement to Working Parties 5A, 5B and 7C - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency band 5 350-5 470 MHz by RLANs
|
JTG 4-5-6-7
|
|
2014-03-07 |
|
[ 445 ]
|
Liaison Statement/r on the ITU-T G.fast physical layer specification (ITU-T G.9701) (reply to ITU-R Liaison Statement 21)
|
ITU-T SG 15
|
|
2014-03-03 |
|
[ 444 ]
|
Liaison statement to Working Party 1B (copy to Working Parties 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
|
WP 5D
|
|
2014-02-25 |
|
[ 443 ]
|
Liaison statement to ITU-T FG Innovation, TSAG and Study Group 17 (copy for information to ITU-R Study Group 5, Working Parties 5A, 5B and 5C) - New standardization activities for the International Telecommunication Union - Standardization Sector (ITU-T)
|
WP 5D
|
|
2014-02-25 |
|
[ 442 ]
|
Liaison statement to Working Party 5A - WRC-15 agenda item 9.1, issue 9.1.7 - Resolution 647 (Rev. WRC-12) - Spectrum management guidelines for emergency and disaster relief radiocommunication
|
WP 1B
|
|
2014-02-06 |
|
[ 441 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 agenda item 9.1, issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station
|
WP 1B
|
|
2014-01-30 |
|
[ 440 ]
|
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5D, 7B, 7C, 7D and CCV - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
|
WP 1B
|
|
2014-01-30 |
|
[ 439 ]
(Rev.1) |
Liaison statement on ITU-T standardization efforts related to ISO TC22-TC204 JWG2 for VSG to [ISO TC22-TC204 JWG2 for VSG]
|
ITU-T SG 16
|
|
2014-01-28 |
|
[ 438 ]
|
Wireless billboard channels (WBC) - An example of wireless control channels
|
Director, BR
|
|
2014-01-24 |
|
[ 437 ]
|
Implementation examples of a CPC piggybacked on a broadcast digital platform
|
Director, BR
|
|
2014-01-24 |
|
[ 436 ]
|
Recommendation ITU-R SA.1626-1 - Feasibility of sharing between the space research service (space-to-Earth) and the fixed and mobile service in the band 14.8-15.35 GHz
|
SG 7
|
|
2014-01-21 |
|
[ 435 ]
|
Liaison statement on coexistence of wired telecommunications with radiocommunication systems
|
ITU-T SG 5
|
|
2014-01-21 |
|
[ 434 ]
|
Liaison statement on coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)
|
ITU-T SG 9
|
|
2014-01-07 |
|
[ 433 ]
|
Liaison statement on coexistence of wired telecommunications with radiocommunication systems
|
ITU-T SG 9
|
|
2014-01-06 |
|
[ 432 ]
|
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WP 5B
|
|
2013-12-20 |
|
[ 431 ]
|
Liaison statement to Working Party 7B - WRC-15 agenda item 9.1 (issue 9.1.8)
|
SC-WP
|
|
2013-12-20 |
|
[ 430 ]
|
Liaison statement to ITU-R Working Parties 1B and 6A (copy to ITU-R Working party 5A) - Definition and translation of the term "white space" and related terms
|
CCV
|
|
2013-12-19 |
|
[ 429 ]
|
Reply liaison statement to ITU-R Working Party 5A on PDR Recommendation ITU-R M.2003 and Report ITU-R M.2227 for Multi Gigabit Wireless systems (MGWS) in 60 GHz range
|
European Telecommunications Standards Institute
|
|
2013-11-13 |
|
[ 428 ]
|
Liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5, 9 & 15 for action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5C, 5D, 6A, 7B, 7C and 7D for information) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendations ITU-T G.fast and ITU-T J.195 (J.HINOC-REQ)
|
WP 5B
|
|
2013-12-05 |
|
[ 427 ]
|
Liaison statement to Working Parties 5A and 5B - Potential impact to the fixed service from automotive collision avoidance radar in adjacent frequency bands 76-77 GHz and 77-81 GHz
|
WP 5C
|
|
2013-12-04 |
|
[ 426 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1
|
WP 5C
|
|
2013-12-04 |
|
[ 425 ]
|
Liaison statement to Study Group 6 (copy to Working Parties 4A, 4B, 4C, 5A, 5C, 5D and 6A) - Development of Question ITU-R 136-2/6 on Worldwide broadcasting roaming
|
WP 5B
|
136-2/6
|
2013-12-03 |
|
[ 424 ]
|
Liaison statement to Working Party 5A (copy for information to Working Party 5D) - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
WP 5C
|
|
2013-12-03 |
|
[ 423 ]
|
Liaison statement to Working Parties 5A, 5D and ITU-T JCA-AHF - Working document towards a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems
|
WP 5C
|
|
2013-12-03 |
|
[ 422 ]
|
Liaison statement to Working Party 1B (copied for information to Working Parties 5A & 5C, International Civil Aviation Organization, International Maritime Organization and World Meteorological Organization) - Development of a draft new Report ITU-R SM.[WHITE-SPACE] spectrum management principles and spectrum engineering techniques for the use of "White spaces" by radio systems...
|
WP 5B
|
|
2013-12-03 |
|
[ 421 ]
+Ann.1-21 |
Report on the twelfth meeting of Working Party 5A (Geneva, 18-28 November 2013)
|
Chairman, WP 5A
|
|
2013-11-28 |
|
[ 420 ]
|
Final List of Participants - Working Party 5A (Geneva, 18-28 November 2013)
|
Director, BR
|
|
2013-11-28 |
Results:744 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):