Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 606 ]
|
Liaison statement to Working Party 4A (copy to Working Party 4C for information) - Preliminary draft new Report ITU-R M.[ADS-B]
|
WP 5B
|
|
2014-12-17 |
|
[ 605 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C as responsible Groups for WRC-15 agenda item 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1 (Issues 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8), 10 (copy to Working Party 5D)
|
World Meteorological Organizaiton
|
|
2014-12-10 |
|
[ 604 ]
|
Liaison statement to ITU-R Working Parties 4A and 4B (copy for information to Working Party 4C - WRC-15 agenda item 1.5)
|
WP 5B
|
|
2014-12-10 |
|
[ 603 ]
|
Liaison statement to Working Party 5C (copied to Working Parties 4A, 4C, 5A, 7B and 7C) - Television broadcast receiving antenna pattern for use in sharing studies in the frequency range 470-862 MHz
|
WP 6A
|
|
2014-12-01 |
|
[ 602 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - New Report ITU-R F.2323 - Fixed service use and future
|
WP 5C
|
|
2014-11-28 |
|
[ 601 ]
|
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Preliminary draft revision of Recommendation ITU-R F.758-5 - Systems parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference
|
WP 5C
|
|
2014-11-10 |
|
[ 600 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems
|
WP 5A
|
|
2014-11-10 |
|
[ 599 ]
|
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.6
|
WP 5C
|
|
2014-11-07 |
|
[ 598 ]
|
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.9.1
|
WP 5C
|
|
2014-11-07 |
|
[ 597 ]
|
Liaison statement to Working Party 4A - SRS/FSS sharing in the 37.5-38 GHz band
|
WP 7B
|
|
2014-10-16 |
|
[ 596 ]
|
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.6
|
WP 7B
|
|
2014-10-16 |
|
[ 595 ]
|
Liaison statement to Working Party 4A - PDN Report on WRC-15 agenda item 1.9.1
|
WP 7B
|
|
2014-10-16 |
|
[ 594 ]
|
Liaison statement to Working Party 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (for information)
|
WP 7B
|
|
2014-10-16 |
|
[ 593 ]
|
Report of the tenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
|
International Maritime Organization
|
|
2014-10-15 |
|
[ 592 ]
|
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6
|
WP 7C
|
|
2014-10-15 |
|
[ 591 ]
+Ann.1-38 |
Report on the meeting of Working Party 4A - (Geneva, 2-10 July 2014)
|
Chairman, WP 4A
|
|
2014-07-11 |
|
[ 590 ]
|
Final List of Participants - Working Party 4A (Geneva, 2-10 July 2014)
|
Director, BR
|
|
2014-07-11 |
|
[ 589 ]
|
List of documents issued (Documents 4A/468 - 4A/589)
|
BR Study Group Department
|
|
2014-07-01 |
|
[ 588 ]
(Rev.1) |
Draft CPM text on WRC-15 agenda item 7 - Possible method to mitigate excessive filings issue (Issue D)
|
Egypt (Arab Republic of)
|
|
2014-06-24 |
|
[ 587 ]
|
Liaison statement to Working Parties 4A and 5C - WRC-15 agenda item 1.8
|
WP 4C
|
|
2014-06-30 |
|
[ 586 ]
|
Preliminary draft new Report ITU-R S.[R1.FSS] - Compilation of proposed modification texts coming from Luxembourg contributions
|
Luxembourg
|
|
2014-06-25 |
|
[ 585 ]
|
Proposed modification of working document towards a preliminary draft new Report ITU-R S.[R1.FSS] and CPM text on WRC-15 agenda items 1.6.1 AND 1.6.2 - Compatibility studies related to the band 14.50-15.35 GHz between AMS and FSS (E-s)
|
Luxembourg
|
|
2014-06-25 |
|
[ 584 ]
|
Proposed modification of working document towards a preliminary draft new Report ITU-R S.[R1.FSS] and CPM text on WRC-15 agenda items 1.6.1 and 1.6.2 - Compatibility studies related to the band 13.40-13.75 GHz between SRS and FSS (E-s and s-E)
|
Luxembourg
|
|
2014-06-25 |
|
[ 583 ]
|
Proposed modification of working document towards a preliminary draft new Report ITU-R S.[R1.FSS] and CPM text on WRC-15 agenda items 1.6.1 and 1.6.2 - Compatibility studies related to the band 13.40-13.75 GHz between RLS, RNS and FSS (E-s)
|
Luxembourg
|
|
2014-06-25 |
|
[ 582 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Sanity check of the Report
|
Luxembourg
|
|
2014-06-25 |
|
[ 581 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS], ITU-R S.[R2R3.FSS] and ITU-R S.[FSS.DEPLOYMENT] - Assessment of the current and future frequency reuse factor in the band 14.00-14.50 GHz
|
Luxembourg
|
|
2014-06-25 |
|
[ 580 ]
|
Working document - Draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2 - Compilation of proposed modification texts coming from Luxembourg contributions
|
Luxembourg
|
|
2014-06-25 |
|
[ 579 ]
|
Technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7
|
Director, BR
|
|
2014-06-25 |
|
[ 578 ]
|
Working document - Draft CPM text on WRC-15 agenda item 9.1, issue 9.1.2
|
Sweden
|
|
2014-06-25 |
|
[ 577 ]
|
Proposed changes to draft CPM text on WRC-15 agenda item 9.1, issue 9.1.2
|
Telenor ASA
|
|
2014-06-25 |
|
[ 576 ]
|
Evaluating the effect of increase of the current interference criterion (T/T > 6%) and proposing the optimum possible change
|
Iran (Islamic Republic of)
|
|
2014-06-25 |
|
[ 575 ]
|
Proposed modifications to Annex 25 to Working Party 4A Chairman's Report - Working document - Draft CPM text on WRC-15 agenda item 1.8
|
Iran (Islamic Republic of)
|
|
2014-06-25 |
|
[ 574 ]
|
Proposed modifications to Annex 12 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S.[ESV] - Interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on terrestrial co-frequency stations
|
Iran (Islamic Republic of)
|
|
2014-06-25 |
|
[ 573 ]
|
Consideration on WRC-15 agenda item 1.8
|
Iran (Islamic Republic of)
|
|
2014-06-25 |
|
[ 572 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] under WRC-15 agenda item 1.6.1 - Consideration of possible FSS (s-E) allocation in band 13.4-13.75 GHz
|
Eutelsat S.A.
|
|
2014-06-25 |
|
[ 571 ]
|
Proposals toward draft CPM Report under WRC-15 agenda item 1.6.1
|
Eutelsat S.A.
|
|
2014-06-25 |
|
[ 570 ]
|
Proposed revision to Annex 27 to Working Party 4A Chairman's Report - Working document - Draft CPM text on WRC-15 agenda item 1.9.1
|
France
,
Luxembourg
,
Sweden
,
United Kingdom of Great Britain and Northern Ireland
|
|
2014-06-25 |
|
[ 569 ]
|
Analysis of near-Earth phases of deep space missions
|
France
,
Luxembourg
,
Sweden
|
|
2014-06-25 |
|
[ 568 ]
|
Compatibility between proposed FSS emissions and GSO SRS mission in the band 7 190-7 235 MHz
|
France
,
Luxembourg
,
Sweden
,
United Kingdom of Great Britain and Northern Ireland
|
|
2014-06-25 |
|
[ 567 ]
|
Compatibility between proposed FSS emissions and SRS in the band 7 150-7 190 MHz
|
France
|
|
2014-06-25 |
|
[ 566 ]
|
Proposed draft CPM text on WRC-15 agenda item 1.7
|
France
|
|
2014-06-25 |
|
[ 565 ]
|
Proposed revision to Annex 21 to Working Party 4A Chairman's Report - Draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2
|
France
|
|
2014-06-25 |
|
[ 564 ]
|
Proposed draft CPM text on WRC-15 agenda item 7 - General use of modern electronic means of communications in coordination and notification procedures (Issue [X])
|
France
|
|
2014-06-25 |
|
[ 563 ]
|
Proposed draft CPM text on WRC-15 agenda item 7 - Review of the advance publication mechanism for satellite networks subject to coordination under Section II of Article 9 of the Radio Regulations (Issue C)
|
France
|
|
2014-06-25 |
|
[ 562 ]
|
Proposed revisions to preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0 GHz] - Technical and operational requirements for earth stations on moving platforms operating with geostationary FSS satellite networks in the bands 29.5-30.0/19.7-20.2 GHz
|
Croatia (Republic of)
,
France
,
Germany (Federal Republic of)
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
,
United Kingdom of Great Britain and Northern Ireland
|
|
2014-06-25 |
|
[ 561 ]
|
Proposed modifications to the draft CPM text on WRC-15 agenda item 7 - Informing the Bureau of a suspension under Radio Regulation No. 11.49 beyond six months (issue A)
|
Germany (Federal Republic of)
,
United Kingdom of Great Britain and Northern Ireland
|
|
2014-06-25 |
|
[ 560 ]
|
Proposed modifications to the draft CPM text on WRC-15 agenda item 7 - Possible cancellation of advance publication mechanism for satellite networks subject to coordination under Section II of Article 9 of the Radio Regulations (Issue C)
|
United Kingdom of Great Britain and Northern Ireland
|
|
2014-06-25 |
|
[ 559 ]
|
Comments on the draft CPM text on WRC-15 agenda item 1.8
|
ASTRIUM SAS
,
European Space Agency
|
|
2014-06-25 |
|
[ 558 ]
|
WRC-15 agenda item 1.6.1 and 1.6.2, frequency band 14.5-14.8 GHz - Modifications to Annexes 9 and 10 to Working Party 4A Chairman's Report
|
HISPASAT, S.A.
|
|
2014-06-25 |
|
[ 557 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S 29.5-30.0/19.7-20.2 GHz] Technical and operational guidelines for earth stations on [mobile/moving] platforms communicating with geostationary space stations in the fixed-satellite service in the frequency bands 19.7-20.2 GHz and 29.5-30.0 GHz
|
Canada
|
|
2014-06-24 |
Results:681 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):