Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 50 ]
|
Proposed revision of preliminary draft new Recommendation ITU-R RS.[DEGRAD]
|
United States of America
|
243/7
|
2008-09-23 |
|
[ 49 ]
|
Proposed revisions to preliminary draft new Recommendation ITU-R RS.[PASSIVE_CAHRS]
|
United States of America
|
243/7
|
2008-09-23 |
|
[ 48 ]
|
Proposed draft CPM text for WRC-11 Agenda item 1.6 (Res 950)
|
United States of America
|
|
2008-09-23 |
|
[ 47 ]
|
Working document towards a preliminary draft new Report or Recommendation on sharing the 31.5-31.8 GHz band by the earth exploration-satellite service (passive) and the fixed service
|
United States of America
|
232/7
|
2008-09-23 |
|
[ 46 ]
|
Preliminary draft new Report ITU-R [Essential Role Observations] - The essential role and global importance of radio spectrum use for observations of climate change, weather, water, space and disaster prediction, detection and mitigation
|
Netherlands (Kingdom of the)
|
|
2008-09-22 |
|
[ 45 ]
|
Preliminary WMO position on WRC-11 agenda
|
WMO
|
|
2008-09-12 |
|
[ 44 ]
|
Liaison statement to relevant Working Parties of Study Groups 3, 4, 5, 6, 7 - Information on short-range devices required for WRC-11 Agenda item 1.22
|
WP 1A
|
|
2008-07-25 |
|
[ 43 ]
|
Reply to liaison statement from Working Party 7C - Interference protection requirements from power line Telecommunication systems on Radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 1A
|
|
2008-07-24 |
|
[ 42 ]
|
Liaison statemento to Working Parties 7C and 7D - WRC-11 Agenda item 1.6, Resolution 950 (Rev. WRC-07)
|
WP 1A
|
|
2008-07-24 |
|
[ 41 ]
|
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy for information to ITU-R WPs 1A, 3J and 3K) - On the study of software-defined radio and cognitive radio systems
|
WP 1B
|
|
2008-07-23 |
|
[ 40 ]
|
Liaison statement to Working Party 7C - Considerations relating to propagation models for studies in support of WRC-11 - Agenda item 1.16 (Resolution 671 [COM6/16] (WRC-07))
|
WP 3L
|
|
2008-06-25 |
|
[ 39 ]
|
Liaison statement to ITU-R Working Party 5B on additional allocations to the maritime mobile service below 1 GHz - (Copy for information to ITU-R Working Parties 5A, 5C, 7B, 7C and 7D)
(WRC-11 Agenda item 1.10)
|
WP 6A
|
|
2008-06-20 |
|
[ 38 ]
|
Liaison reply to Working Party 4C (copied to Working Parties 3J, 3K, 3L, 3M, 7A, 7B, 7C, 7D, 4A, 4B, 6A, 6B, 6C, 1A, 1B, 1C, 5A, 5B, 5C and 5D for information) - Studies related to WRC-11 Agenda item 1.25
|
WP 6A
|
|
2008-06-11 |
|
[ 37 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 1A, 7B, 7C and 7D) - WRC-11 Agenda item 1.8
|
WP 4A
|
|
2008-05-06 |
|
[ 36 ]
|
Liaison statement to Working Party 5C for information and possible action to Working Parties 3M, 5A, 5B, 7B and 7C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz (WRC-11 Agenda item 1.20)
|
WP 4A
|
|
2008-05-06 |
|
[ 35 ]
|
Liaison statement to Working Parties 7A, 7B, 7C, 7D, 4A, 4B, 6D, 6X, 6G, 1A, 1B, 1C, 5A, 5B, 5C and 5D (copy for information to Working Parties 3J, 3K, 3L and 3M) - Information for studies related to WRC-11 Agenda item 1.25
|
WP 4C
|
|
2008-04-22 |
|
[ 34 ]
|
Liaison to ITU-R Working Party 1A regarding status of the 275 3 000 GHz frequency band
|
IEEE
|
|
2008-03-28 |
|
[ 33 ]
|
Liaison statement to Working Party 1B concerning the study of software defined radio and cognitive radio systems in Working Party 1B (copy for information to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6D, 6G, 7C, 7D)
|
WP 7B
|
|
2008-04-04 |
|
[ 32 ]
+Ann.1-8 |
Report to Working Party 7C on its meeting (31 March - 4 April 2008) with a view to its next meeting (October 2008)
|
Chairman, WP 7C
|
|
2008-04-04 |
|
[ 31 ]
|
Final list of participants
|
Director, BR
|
|
2008-04-04 |
|
[ 30 ]
|
This document has been withdrawn
|
BR Study Group Department
|
|
2008-04-02 |
|
[ 29 ]
|
ITU-R Study Group Question to be brought to the attention of Study Groups 1, 4, 5 and 7 - Question 212-3/8 "Nomadic wireless access systems including radio local area networks for mobile applications"
|
BR Study Group Department
|
|
2008-03-31 |
|
[ 28 ]
|
List of documents issued
|
BR Study Group Department
|
|
2008-03-28 |
|
[ 27 ]
|
Liaison statement to ITU-R Working Party 1B on software defined radio and cognitive radio systems (copy for information to ITU-R WP 5B and ITU-R Study Groups 3, 4, 6 and 7)
|
WP 5A
|
|
2008-03-28 |
|
[ 26 ]
|
Liaison statement to ITU-R Working Party 1B (copy for information to ITU-R WP 5B and ITU-R Study Groups 3, 4, 6 and 7) - Studies of software defined radio and cognitive radio systems
|
WP 5C
|
|
2008-03-28 |
|
[ 25 ]
|
WRC Resolutions and Recommendations related to the work of Study Group 7
|
Chairman, SG 7
|
|
2008-03-24 |
|
[ 24 ]
|
The operation and technical characteristics of the Meteor-M-1 mission
|
Russian Federation
|
235/7, 141/7, 139/7
|
2008-03-21 |
|
[ 23 ]
|
Preliminary draft new Recommendation ITU-R RS.[PATTERN EESS] - Reference antenna pattern for passive sensors operating in the Earth exploration-satellite service (passive) to be used in compatibility analsyses [in the frequency range 1.4-100 GHz]
|
France
|
232/7, 215/7, 233/7
|
2008-03-21 |
|
[ 22 ]
|
List and definition of parameters concerning the technicla and operational characteristics of passive sensors below 275 GHz
|
France
|
|
2008-03-21 |
|
[ 21 ]
|
Agenda item 1.6, WRC-11: Spectrum use by the passive services between 275 GHz and 3 000 GHz
|
France
|
235/7
|
2008-03-21 |
|
[ 20 ]
|
Beam efficiency of the proposed antenna pattern for passive sensors
|
France
|
|
2008-03-21 |
|
[ 19 ]
|
Draft reply liaison to ITU-D SG 2 RG Q22/2 - Proposed replacement annex for ITU-D Study Group 2 Document 138, Annex 4
|
United States of America
|
|
2008-03-20 |
|
[ 18 ]
|
Proposed modifications to Recommendation ITU-R RS.1166-3 - Performance and interference criteria for active spaceborne sensors
|
United States of America
|
|
2008-03-20 |
|
[ 17 ]
|
Working document towards a report or recommendation on the use of passive remote sensing spectrum between 275 and 3 000 GHz
|
United States of America
|
235/7
|
2008-03-20 |
|
[ 16 ]
|
Proposed preliminary draft revision to Recommendation ITU-R RS.577-5: Preferred frequencies and necessary bandwidths for spaceborne active remote sensors
|
United States of America
|
|
2008-03-20 |
|
[ 15 ]
|
Draft reply liaison statement to Working Party 3J (copy to Working Party 1A) - Typical bandwidths for radiocommunication systems under the purview of Working Party 7C
|
United States of America
|
|
2008-03-20 |
|
[ 14 ]
|
Working document - Planning for studies in support of WRC-11 Agenda item 1.16 - (Resolution 671[COM6/16] (WRC-11)) - Recognition of systems in the meteorological aids service in the frequency range below 20 kHz
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 13 ]
|
Draft liaison statement to Working Party 7A - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16] (WRC-07))
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 12 ]
|
Draft liaison statement to Working Party 5C - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16](WRC-07))
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 11 ]
|
Draft liaison statement to Working Party 5B - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16](WRC-07))
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 10 ]
|
Draft liaison statement to Working Parties 3J and 3L - Considerations relating to propagation models for studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16](WRC-07))
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 9 ]
(Rev.1) |
WRC-11 AI 1.6: Review No. 5.565 (Passive sensing 275-3 000 GHz) and optical links
|
European Space Agency
|
|
2008-03-18 |
|
[ 8 ]
|
Structure of Study Group 7 and its Working Parties
|
Chairman, SG 7
|
|
2008-03-13 |
|
[ 7 ]
|
Liaison statement to WP 4A (copied to WPs 3M, 5A, 5B, 7B and 7C) - Gateway links for high altitude platforms stations in the range from 5 850 to 7 075 MHz
|
WP 5C
|
|
2008-02-19 |
|
[ 6 ]
|
Liaison statement to Working Parties 1A, 4A, 7B, 7C and 7D - WRC-11 Agenda item 1.8 - consideration of technical and regulatory issues relative to the fixed service in the bands between 71 GHz and 238 GHz
|
WP 5C
|
|
2008-02-19 |
|
[ 5 ]
|
Preparation of the CPM Report to WRC-11 following the results of the first session of CPM-11
|
Chairman, CPM-11
|
|
2008-01-29 |
|
[ 4 ]
|
Recommendation to be brought to the attention of Study Groups 3, 4 and 7
|
BR, Study Group Department
|
|
2008-01-16 |
|
[ 3 ]
|
Recommendation to be brought to the attention of Study Group 7
|
BR Study Group Department
|
|
2008-01-16 |
|
[ 2 ]
|
Reply liaison statement to ITU-R Study Group 7 regarding a working document towards a ITU-D Study Group 2 Report on the use of remote sensing for disaster prediction, detection and mitigation
|
ITU-D Study Group 2
|
22/2
|
2007-11-20 |
|
[ 1 ]
|
Documents to be carried over from the 2003-2007 Study period
|
WP 7C
|
|
2007-11-19 |
Results:275 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6
-
|
Multiple Document Download: Formats and Languages to be included (when available):