International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF systems in the Fixed and Land Mobile Services

Results:603 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 53 ]  
 
Liaison statement to Working Parties 5D, 5B and 5C and for information to Joint Task Group 5-6 - Sharing studies between IMT and the primary services, including broadcasting, to which the UHF band is allocated     WP 6D     2008-05-28
[ 52 ]  
 
Work on the topic addressed in document 5D/118 from Study Group 4     Chairman, SG 5     2008-05-20
[ 51 ]  
 
Liaison statement to Working Parties 5A and 5C - Compatibility of broadband wireless access (BWA) networks and fixed-satellite service (FSS) networks in the 3 400-4 200 MHz band     WP 4A     2008-05-07
[ 50 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 1A, 7B, 7C and 7D) - WRC-11 Agenda item 1.8     WP 4A     2008-05-06
[ 49 ]  
 
Liaison statement to Working Parties 5A, 5C and 6X (copy for information and possible action to Working Parties 3M, 4B, 6D, 6G and 7D) - Use of the band 21.4-22 GHz for broadcasting-satellite service and associated feeder-link bands in Regions 1 and 3 (WRC-11 Agenda item 1.13)     WP 4A     2008-05-06
[ 48 ]  
 
Liaison statement to Working Party 5C for information and possible action to Working Parties 3M, 5A, 5B, 7B and 7C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz (WRC-11 Agenda item 1.20)     WP 4A     2008-05-06
[ 47 ]  
 
Liaison statement to Working Parties 7A, 7B, 7C, 7D, 4A, 4B, 6D, 6X, 6G, 1A, 1B, 1C, 5A, 5B, 5C and 5D (copy for information to Working Parties 3J, 3K, 3L and 3M) - Information for studies related to WRC-11 Agenda item 1.25     WP 4C     2008-04-22
[ 46 ]  
 
Liaison statement to Working Parties 5A, 5B, 5C, 5D and Study Group 5 - Definition of networks that utilize both satellite and terrestrial components     WP 4B     2008-04-22
[ 45 ]  
 
Liaison statement to Working Party 5C - Sharing analyses between NON-GSO meteorological satellite systems operating in the Space-to-earth direction and fixed service systems in the band 7 850-7 900 MHz for WRC-11 Agenda item 1.24     WP 7B     2008-04-08
[ 44 ]  
 
Liaison statement to WP 5C - Working document towards a preliminary draft new Recommendation ITU-R SA.[23 GHz SRS SHARING] - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz     WP 7B     2008-04-08
[ 43 ]  
 
Liaison statement to Working Party 5C - Preliminary draft revision of Recommendation ITU-R SA.1275-1     WP 7B     2008-04-07
[ 42 ]  
 
Liaison statement to Working Party 5C - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 7B     2008-04-07
[ 41 ]  
 
Liaison statement to Working Party 5C - WRC-11 Agenda item 1.11     WP 7B     2008-04-07
[ 40 ]  
 
Liaison statement to Working Party 5C - Preliminary draft revision of Recommendation ITU-R SA.1276-1     WP 7B     2008-04-07
[ 39 ]  
 
Draft new Question ITU-R [CHAR]/5 - Technical and operational characteristics for fixed wireless systems operating below 57 GHz     SG 5     2008-04-07
[ 38 ]  
 
Liaison statement to Working Parties 1A and 5C - Considerations for satellite optical links     WP 7B     2008-04-07
[ 37 ]  
 
Liaison statement to Working Party 5C - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 7D     2008-04-07
[ 36 ]  
 
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz     WP 7C     2008-04-07
[ 35 ]  
 
Liaison statement to Working Party 5C - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671 [COM6/16] (WRC-07))     WP 7C     2008-04-07
[ 34 ]  
 
Liaison statement to Working Party 1B concerning the study of software defined radio and cognitive radio systems in Working Party 1B (copy for information to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6D, 6G, 7C, 7D)     WP 7B     2008-04-04
[ 33 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B and 5C - WRC-11 agenda item 1.12     WP 7B     2008-04-04
[ 32 ]  
 
Liaison statement to WPs 5B, 5C, 6D, 7B and 7D on studies related to WRC-11 Agenda item 1.15     WP 5A     2008-03-31
[ 31 ]  
 
Liaison statement to Working Parties 5B, 5C and 6D on studies related to WRC-11 Agenda item 1.23     WP 5A     2008-03-31
[ 30 ]  
 
Liaison statement to Working Parties 5B, 5C and ITU-T Study Group 2 on possible suppression of message formats in Recommendation ITU-R M.1677     WP 5A     2008-03-31
[ 29 ]  
 
Liaison statement to ITU-T Study Group 9 (copy to ITU-R WPs 5C, 6D, 6G and 6X, and SG 6) - Response to the comment from ITU-T Study Group 9 on Recommendation ITU-R M.1824     WP 5A     2008-03-31
[ 28 ]  
 
Liaison statement to WPs 5A, 5C, 6D, 7A and 7D - Sharing studies required for WRC-11 Agenda item 1.15     WP 5B     2008-03-04
[ 27 ]  
 
Liaison statement to WPs 5A and 5C - Compatibility studies between radiolocation and mobile/fixed service in the band 30-300 MHz     WP 5B     2008-02-15
[ 26 ]  
+Ann.1-8 
Chairman's Report - Meeting 5-14 February 2008     Chairman, WP 5C     2008-03-18
[ 25 ]  
 
Final List of Participants - Working Party 5C (Geneva, 5-14 February 2008)     Director, BR     2008-02-13
[ 24 ]  
 
Liaison statement to ITU-T Study Group 15 on ANTS     WP 5A     2008-02-11
[ 23 ]  
 
Liaison statement to ITU-T Study Group 15 on ANTS (Copy for information to ITU-R WP 5A and WP 5C)     WP 5D     2008-02-11
[ 22 ]  
 
Liaison statement to Working Parties 5B, 5C, 6D and for information to JTG 5-6     WP 5D     2008-02-07
[ 21 ]  
 
List of documents issued     BR Study Group Department     2008-02-04
[ 20 ]  
 
WRC Resolutions and Recommendations related to the work of Study Group 5     Chairman, SG 5     2008-01-31
[ 19 ]  
 
Development of the analytical list of the Recommendations within Study Group 5     Chairman, SG 5     2008-01-31
[ 18 ]  
 
Future updating of SF-Series Recommendations developed by the former Working Party 4-9S     Chairmen, SGs 4 and 5     2008-01-29
[ 17 ]  
 
WRC-11 Agenda item 1.8     France     2008-01-28
[ 16 ]  
 
WRC-11 Agenda item 1.8 - Sharing/Compatibility between FS and EESS (Passive)     France     2008-01-28
[ 15 ]  
 
Draft revision of Recommendation ITU-R F.1336-2 - Reference radiation patterns of omnidirectional, sectoral and other antennas in point-to-multipoint systems for use in sharing studies in the frequency range from 1 GHz to about 70 GHz     Japan   202/9   2008-01-28
[ 14 ]  
 
Proposed actions for certain old Recommendations within former Working Party 4-9S     Japan     2008-01-28
[ 13 ]  
 
Reorganization of the Questions to be assigned to Working Party 5C     Japan     2008-01-28
[ 12 ]  
 
Comments to the Annex 4 OF Chairman's Report related to revision of Recommendation ITU-R F.758 - Considerations of FS system parameter in the development of criteria for sharing between the terrestrial fixed service and other services     Korea (Republic of)   225/9   2008-01-25
[ 11 ]  
 
Harmonization of Spectrum for electronic news gathering(eng)     Korea (Republic of)   RES COM6/5   2008-01-25
[ 10 ]  
 
Issues relating to electronic news gathering from the previous study period - Harmonisation of spectrum for use by terrestrial electronic news gathering systems     Australia     2008-01-25
[ 9 ]  
 
ITU-R foundation studies on electronic news gathering - Harmonisation of spectrum for use by terrestrial electronic news gathering systems     Australia     2008-01-25
[ 8 ]  
 
Proposed framework for studies on WRC-11 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems (ENG)     Australia     2008-01-25
[ 7 ]  
 
Proposal to update two preliminary draft new ITU-R Questions     Russian Federation     2008-01-25
[ 6 ]  
 
Draft revision of Question ITU-R 234/9 - Technical and operational characteristics of fixed wireless systems operating in frequency bands allocated to the fixed service above 57 GHz     United Kingdom     2008-01-22
[ 5 ]  
 
Preparation of the CPM Report to WRC-11 following the results of the first session of CPM-11     Chairman, CPM-11     2008-01-29
[ 4 ]  
 
Recommendation to be brought to the attention of Study Groups 1, 3, 4 and 5     BR Study Group Department     2008-01-16
Results:603 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2011-12-16