International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5B : Contributions : 673 Recently posted -  Search Meeting Documents
   
[673]  Draft liaison statement to Working Parties 3J and 3M and Working Party 4B (for information only) - Propagation end-to-end link availability of unmanned aircraft system operating with dual beyond line-of-sight (BLOS) satellite communications (SATCOM) links to achieve the desired link availability

Format

Size

Posted

English

Word  

832470 bytes 2011-06-02 [673] 
 

Document :

ITU-R WP5B  Contribution  673

Title :

Draft liaison statement to Working Parties 3J and 3M and Working Party 4B (for information only) - Propagation end-to-end link availability of unmanned aircraft system operating with dual beyond line-of-sight (BLOS) satellite communications (SATCOM) links to achieve the desired link availability

Date :

2011-06-01

Source :

United States of America

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2011-06-02