Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 34 ]
|
Elements for a proposed liaison statement to Working Party 6E - Regarding the draft CPM Report to WRC-07 Agenda item 1.13 Resolution 544
|
Canada
|
|
2004-09-08 |
|
[ 33 ]
|
Working document towards a preliminary draft new Recommendation - Channel access requirements for HF adaptive systems in the Fixed Service [HF-AR]
|
Canada
|
205-1/9
|
2004-09-08 |
|
[ 32 ]
|
Proposed draft revision of Recommendation ITU-R F.339-6 - Bandwidths, signal-to-noise ratios and fading allowances in complete systems
|
Canada
|
|
2004-09-06 |
|
[ 31 ]
|
Elements of a liaison statement to WP 1A - Methodology for protection of the fixed service from interference caused by high data rate communications using the electricity supply wiring
|
Canada
|
|
2004-09-06 |
|
[ 30 ]
|
Use of the band 4 MHz to 10 MHz by fixed, mobile and broadcasting services
|
Australia
|
|
2004-09-06 |
|
[ 29 ]
|
Graphical presentation of the utilization of Appendix 17
|
France
|
|
2004-08-30 |
|
[ 28 ]
|
Understanding WRC-07 agenda item 1.13
|
France
|
|
2004-08-30 |
|
[ 27 ]
|
Liaison statement to WPs 3L, 8A and 9C - Establishment of a Rapporteur for the preparation of CPM-06 text on Agenda item 1.13, Resolution 544
|
WP 6E
|
|
2004-05-18 |
|
[ 26 ]
|
Liaison statement to Working Parties 8A, 8B, and 9C concerning WRC-07 Agenda item 1.13
|
WP 6E
|
|
2004-05-18 |
|
[ 25 ]
+Ann.2-5 |
Chairman's Report of the WP 9C meeting
|
Chairman, WP 9C
|
|
2004-03-11 |
|
[ 24 ]
|
Final List of Participants - Working Party 9C
|
Director, BR
|
|
2004-02-26 |
|
[ 23 ]
|
List of documents issued
|
BR Study Group Department
|
|
2004-02-23 |
|
[ 22 ]
|
Draft liaison statement to Working Party 3L - Discussion of ionospheric parameters for consideration by WP 3L in connection with modelling approaches supporting adaptive HF communication systems in the fixed service
|
United States of America
|
|
2004-02-13 |
|
[ 21 ]
|
Review pre-2000 ITU-R F. series Recommendations and existing Questions related to WP 9C work for current telecommunications technology application
|
United States of America
|
|
2004-02-13 |
|
[ 20 ]
|
Draft liaison statement to Working Party 1A - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distribution wiring
|
United States of America
|
|
2004-02-13 |
|
[ 19 ]
|
Use of the band 4 MHz to 10 MHz by fixed, mobile, broadcasting and amateur services
|
Brazil (Federative Republic of)
|
|
2004-02-12 |
|
[ 18 ]
|
Optimizing spectrum use by the fixed and land mobile services in the HF bands
|
United Kingdom of Great Britain and Northern Ireland
|
|
2004-02-11 |
|
[ 17 ]
|
The climatic control of intensity of a field strength terrestrial wave on communication lines in an MF band
|
Russian Federation
|
225/3
|
2004-02-11 |
|
[ 16 ]
|
Proposal from WP 6E for the establishment of a JRG for coordinated development of documentation from the ITU-R on WRC-07 Agenda item 1.13 (Resolution 544 (WRC-03)) (HF in the 4-10 MHz portion of the spectrum)
|
Australia
|
|
2004-02-04 |
|
[ 15 ]
|
Proposed reply liaison statement to Working Party 6E concerning WRC-07 Agenda item 1.13
|
Canada
|
|
2004-01-29 |
|
[ 14 ]
|
Draft reply to Liaison statement from Working Party 1A - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distribution wiring
|
Chairman, WP 9C
|
|
2004-01-26 |
|
[ 13 ]
|
Liaison statement to Working Parties 6E, 8A and 9C concerning WRC-07 Agenda item 1.13
|
WP 8B
|
|
2004-01-14 |
|
[ 12 ]
|
Liaison statement to Working Party 9C - Prediction methods for adaptive HF system operation
|
WP 3L
|
|
2004-01-08 |
|
[ 11 ]
|
Liaison statement to Working Parties 8B and 9C concerning WRC-07 Agenda item 1.13
|
WP 8A
|
|
2004-01-06 |
|
[ 10 ]
|
Reply to Liaison statement from WP 6E concerning WRC-07 Agenda item 1.13
|
WP 8A
|
|
2003-12-15 |
|
[ 9 ]
|
Proposed draft revision of Recommendation ITU-R F.763-4 - Data transmission over HF circuits using phase shift keying or quadrature amplitude modulation
|
Canada
|
145-1/9
|
2003-12-12 |
|
[ 8 ]
|
Liaison statement to WPs 1A, 8B and 9C concerning WRC-07 Agenda item 1.15
|
WP 8A
|
|
2003-12-12 |
|
[ 7 ]
|
Liaison statement to Working Party 3L - Prediction methods for adaptive HF system operation
|
Chairman, WP 9C
|
|
2003-11-11 |
|
[ 6 ]
|
Liaison statement to WPs 8A and 8B - Use of frequency adaptive systems in the HF and MF bands
|
Chairman, WP 9C
|
|
2003-11-10 |
|
[ 5 ]
|
Liaison statement to WPs 7A, 8A, 8B and 9C - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distributing wiring
|
WP 1A
|
221/1
|
2003-11-06 |
|
[ 4 ]
|
Summary of results of RA-03, WRC-03 and CPM06-1
|
Chairman, SG 9
|
|
2003-11-05 |
|
[ 3 ]
|
Liaison statement to Working Party 9C - Review of allocations to all services in the HF bands between 4 and 10 MHz
|
WP 7D
|
|
2003-10-09 |
|
[ 2 ]
|
Liaison statement to WP's 8A and 9C - Proposal for the establishment of a JRG for coordinated development of documentation from the ITU-R on WRC-07 Agenda item 1.13 (Resolution 544 WRC-03) (HF in the 4-10 MHz portion of the spectrum)
|
WP 6E
|
|
2003-11-06 |
|
[ 1 ]
|
Documents to be carried over from the 2000-2003 study period
|
WP 9C
|
|
2003-07-21 |
Results:159 total items. Result page:
Previous -
1 -
2 -
3 -
4
-
|
Multiple Document Download: Formats and Languages to be included (when available):