Contributions  |
|
Number
|
Title
|
Source
|
Date
|
|
[ 187 ]
|
Liaison statement to WPs 9A, 9B and 9D - Proposed deletion of Recommendation ITU-R SF.615-1
|
WP 4-9S
|
2001-10-01 |
|
[ 186 ]
|
Liaison statement to ITU-R Working Parties 1B, 4A, 6E, 6M, 7E, 8A, 8A, 8F, 9B, JRG 8A-9B and ITU-T SG 16 (Q.6/16)-Terrestrial wireless interactive multimedia applications (WRC-03)
|
JTG 1-6-8-9
|
2001-10-01 |
|
[ 185 ]
|
Liaison statement to ITU-R WP 9B - Response to ITU-R WP 9B liaison tracking to access network transport (ANT) work plan and standardization plan
|
ITU-T SG 15
|
2001-10-01 |
|
[ 184 ]
|
Liaison statement to Working Parties 4B and 9B and Joint Rapporteur Group 8A-9B - New versions of the access network transport (ANT) standardization plan and work plan
|
ITU-T SG 15
|
2001-10-01 |
|
[ 183 ]
|
Liaison statement to ITU-R Joint Task Group 1-6-8-9 - Terrestrial wireless interactive multimedia systems
|
WP 8A
|
2001-10-01 |
|
[ 182 ]
+Add.1 |
Chairman's Report of the Working Party 9B meeting (Geneva, 3-11 April 2002)
|
Chairman, WP 9B
|
2001-10-01 |
|
[ 181 ]
|
Results of the submissions from JRG 8A-9B on FWA to Working Parties 9B, 9D and Study Group 9
|
JRG 8A-9B
|
2001-10-01 |
|
[ 180 ]
|
Report of the fourth meeting of JRG 8A-9B (Geneva, 3-9 April 2002)
|
JRG 8A-9B
|
2001-10-01 |
|
[ 179 ]
|
Liaison from WP 4A
|
WP 4A
|
2001-10-01 |
|
[ 178 ]
|
Liaison statement to Working Parties 8A, 9B and 9D- Characteristics of FWA systems to be used in performing sharing studies
|
JRG 8A-9B
|
2001-10-01 |
|
[ 177 ]
|
Liaison statement to ITU-R WP 9B - Preliminary draft new Recommendation ITU-R F.[9A/DOEP] and preliminary draft new Question ITU-R [9A/DOEP]/9 - Diagnosis and optimization of the error performance of digital fixed wireless systems
|
WP 9A
|
2001-10-01 |
|
[ 176 ]
|
Liaison statement to WPs 8A and 9B - Draft revision of Recommendation ITU-R F.757-2
|
JRG 8A-9B
|
2001-10-01 |
|
[ 175 ]
|
Liaison statement to WP 9B - Preliminary draft revision to Recommendation ITU-R F.1520
|
WP 9D
|
2001-10-01 |
|
[ 174 ]
|
List of documents issued
|
BRSGD
|
2001-10-01 |
|
[ 173 ]
|
Frequency bands used for FWA systems
|
Israel (State of)
|
2001-10-01 |
|
[ 172 ]
|
Review of the term "radio-relay" in the texts within WP 9B
|
Correspondence Group on Terminology
|
2001-10-01 |
|
[ 171 ]
|
Compatibility between Earth Exploration Satellite System (passive) operating in the band 31.3-31.5 GHz and Fixed Service Systems operating in the band 31.0-31.3 GHz
|
France
|
2001-10-01 |
|
[ 170 ]
|
Revision of Recommendation ITU-R F.746-5 concerning Channel arrangements for FS systems in the band 31.0-31.3 GHz
|
France
|
2001-10-01 |
|
[ 169 ]
|
Effect of rain on the choice of the bands for mobile networks fixed service (FS) infrastructure
|
France
|
2001-10-01 |
|
[ 168 ]
|
Response to JTG 1-6-8-9 on terrestrial wireless interactive multimedia applications
|
Sweden
|
2001-10-01 |
|
[ 167 ]
|
Proposed modification of the CPM text on Agenda item 1.13 - Resolutions 122 and 734
|
Japan
|
2001-10-01 |
|
[ 166 ]
|
Draft liaison statement to Joint Task Group 1-6-8-9 - CPM text for WRC-2003 agenda item 1.21 - Terrestrial wireless interactive multimedia systems
|
Canada
|
2001-10-01 |
|
[ 165 ]
|
Proposed amendment of preliminary Draft Revision of Recommendation ITU-R F.1401 - Frequency bands for fixed wireless access systems and the identification methodology
|
Brazil (Federative Republic of)
|
2001-10-01 |
|
[ 164 ]
|
Proposed amendment of document 9/49 REV.1 + ADD.1 - Revision of Recommendation ITU-R F.595-6 - Radio-Frequency Channel Arrangement for Radio-Relay Sustems Operating in the 18 GHz frequency band
|
Brazil (Federative Republic of)
|
2001-10-01 |
|
[ 163 ]
|
Review of the term "Radio-Relay" in the texts within Working Party 9B
|
Chairman, WP 9B
|
2001-10-01 |
|
[ 162 ]
|
Revision of Recommendation ITU-R F.1401
|
France
|
2001-10-01 |
|
[ 161 ]
|
Work for CPM-02 preparation
|
Chairman, WP 9B
|
2001-10-01 |
|
[ 160 ]
|
Spectrum vision for the fixed service
|
Canada
|
2001-10-01 |
|
[ 159 ]
|
Proposed modification to preliminary draft revision of Recommendation ITU-R F.1401
|
Canada
|
2001-10-01 |
|
[ 158 ]
|
Editorial amendments to draft CPM texts in Doc. 9B/TEMP/86 addresing Resolution 734 (WRC-2000)
|
Chairman, WP 9B
|
2001-10-01 |
|
[ 157 ]
|
Draft new Recommendation ITU-R [9B/HAPS1]
|
United Kingdom of Great Britain and Northern Ireland
|
2001-10-01 |
|
[ 156 ]
|
Poposal for modifications to PDNR ITU-R [9B/Coordination-FWS] - A coordination process for area-licensed fixed wireless systems
|
Germany (Federal Republic of)
|
2001-10-01 |
|
[ 155 ]
+Corr.1 |
Liaison statement to ITU-R JTG 1-6-8-9, WP's 1B, 6E, 6M, 8A, 9B and JRG 8A-9B
|
WP 8F
|
2001-10-01 |
|
[ 154 ]
|
PDNR ITU-R F.[HAPS-MT] - Interference mitigation techniques proposed for use by HAPS in the frequency range 18-32 GHz and their advantages
|
Japan
|
2001-10-01 |
|
[ 153 ]
|
Proposed draft new Recommendation ITU-R F.[HAPS-FWA] - Interference from fixed service system using high altitude platform stations to fixed ...
|
Japan
|
2001-10-01 |
|
[ 152 ]
|
Proposed draft new Recommendation ITU-R F.[HAPS-IB] - Power flux-density produced at the surface of the Earth by high altitude platform stations operating in the 27.5-28.35 GHz band to protect the fixed service across the international border
|
Japan
|
2001-10-01 |
|
[ 151 ]
|
Proposed elements for reply liaison statement to JTG 1-6-8-9
|
Japan
|
2001-10-01 |
|
[ 150 ]
|
Proposed amendments to working document on Consideration of the use of the fixed service in the deployment of IMT-2000 infrastructure networks
|
Japan
|
2001-10-01 |
|
[ 149 ]
|
Proposed amendments to Report on Spectrum vision for the fixed service
|
Japan
|
2001-10-01 |
|
[ 148 ]
|
Draft revisions of Questions ITU-R 125/9 and ITU-R 127/9
|
Japan
|
2001-10-01 |
|
[ 147 ]
|
Liaison statement to WP 9B on radio access network infrastructure requirements
|
WP 8F
|
2001-10-01 |
|
[ 146 ]
|
Liaison statement - Draft new Question Q.[ets/16] on Emergency Telecommunications Service (ETS)
|
ITU-T SG 16
|
2001-10-01 |
|
[ 145 ]
|
Liaison statement to WPs 4-9S, 9B and 9D - CPM text elements regarding WRC-03 Agenda item 1.13 - Compatibility between HAPS and EESS (passive) around 31.3 GHz
|
WP 7C
|
2001-10-01 |
|
[ 144 ]
|
Liaison statement to WPs 9B and 9D and TG 1/7 on Agenda item 1.8.2 - Compatibility between FS and EESS (passive) operating in adjacent bands at 31 GHz and 52 GHz
|
WP 7C
|
2001-10-01 |
|
[ 143 ]
|
Report of the third meeting (Geneva, 22-26 October 2001)
|
JRG 8A-9B
|
2001-10-01 |
|
[ 142 ]
|
Liaison statement - Preparation of a new ITU Project on next generation network by SG 13
|
ITU-T SG 13
|
2001-10-01 |
|
[ 141 ]
|
Liaison statement - Coordination and management of the GII Project
|
ITU-T SG 13
|
2001-10-01 |
|
[ 140 ]
+Add.1 |
Chairman's Report of the Working Party 9B meeting (Geneva, 1-9 October 2001)
|
Chairman, WP 9B
|
2001-10-01 |
|
[ 139 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 6S, 7E, 7B, 8D, 9A, 9B and 9D - A draft new Recommendation and a draft new revision of Recommendations dealing with sharing bewtween the FS and FSS ....
|
WP 4-9S
|
2001-10-01 |
|
[ 138 ]
|
Liaison statement to Working Parties 9B and 9D and JWP 4-9S - Draft CPM text addressing Resolutions 122 and 734
|
WP 8B
|
2001-10-01 |
Results:187 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):