International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions : 300 Recently posted -  Search Meeting Documents
   
[300]  On the use of simulation techniques to verify compliance of non-GSO FSS satellite systems with the additional operational limits to epfd down and proposed modification of PDNR S.[4A/TEMP/100]

Format

Size

Posted

English

Zip (Document)  

1078356 bytes 0001-10-3 [300]  - [4A/300] On the use of simulation techniques to verify compliance of non-GSO FSS satellite systems with the additional operational limits to epfd down and proposed modification of PDNR S.[4A/TEMP/100]
 

Document :

ITU-R WP4A  Contribution  300

Title :

On the use of simulation techniques to verify compliance of non-GSO FSS satellite systems with the additional operational limits to epfd down and proposed modification of PDNR S.[4A/TEMP/100]

Date :

2001-10-03

Source :

United Kingdom of Great Britain and Northern Ireland

Meeting :

2001-10-03

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2002-07-19