International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG09 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R SG09  C 

ITU-R SG09

Fixed service

Results:26 total items.
Contributions  [ Source: WP 9B ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 193 ]  
(Rev.1) 
Draft new Recommendation ITU-R F.[9B/Coordination-FWS] - Guidelines for a process to address the deployment of area-licensed fixed wireless systems operating in neighbouring countries     WP 9B   231/9   2003-04-15
[ 191 ]  
 
Executive summary of the meeting of Working Party 9B - (Geneva, 7-14 April 2003)     Chairman, WP 9B     2003-04-14
[ 190 ]  
 
Draft revision of Question ITU-R 119-1/9 - Limitation of unwanted emissions from fixed wireless systems in the fixed service     WP 9B     2003-04-14
[ 189 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R F.1401 - Considerations for the possible identification of frequency bands for fixed wireless access and related sharing studies     WP 9B     2003-04-14
[ 187 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R F.384-7 - Radio-frequency channel arrangements for medium and high capacity digital fixed wireless systems operating in the upper 6 GHz band     WP 9B     2003-04-14
[ 186 ]  
 
Status of Questions assigned to WP 9B     WP 9B     2003-04-14
[ 185 ]  
 
Draft new Question ITU-R [9B/DOEP]/9 - Analysis and optimization of error performance of digital fixed wireless systems for the purpose of maintenance and operation     WP 9B     2003-04-14
[ 178 ]  
 
Draft new Question ITU-R[57 GHz] - Technical and operational characteristics of fixed wireless systems operating in frequency bands allocated to the fixed service above 57 GHz     WP 9B     2003-04-14
[ 141 ]  
(Rev.1) 
Proposed draft CPM text for WRC-03 agenda item 1.13 Resolution 734     WP 9B     2001-10-11
[ 137 ]  
 
Draft revision of Question ITU-R 125-5/9 - Point-to-multipoint fixed wireless systems used in access or back-haul networks     WP 9B     2001-10-11
[ 136 ]  
 
Draft revision of Question ITU-R 136-1/9 - Radio-frequency channel arrangements for digital fixed wireless systems operating in frequency bands below about 17 GHz     WP 9B     2001-10-11
[ 129 ]  
 
Report of the April 2002 meeting     Chairman, WP 9B     2001-10-11
[ 127 ]  
 
Summary of draft Recommendations     WP 9B     2001-10-11
[ 114 ]  
 
Updating of certain maintained Recommendations     WP 9B     2001-10-11
[ 82 ]  
 
Chairman's Report on the Working Party 9B meeting     Chairman, WP 9B     2001-10-11
[ 81 ]  
 
Summaries of draft Recommendations     WP 9B     2001-10-11
[ 80 ]  
 
Draft Revision of Question ITU-R 108-1/9 - Radio-frequency channel arrangements for fixed wireless systems operating in frequency bands above about 17 GHz     WP 9B     2001-10-11
[ 79 ]  
 
Draft Revision of Question ITU-R 107-1/9 - Characteristics of fixed wireless systems operating in frequency bands above about 17 GHz     WP 9B     2001-10-11
[ 67 ]  
 
Questions assigned to Working Party 9B     WP 9B     2001-10-11
[ 64 ]  
 
Draft new Question ITU-R [Coordination-FWS/9] - Technical and operational aspects of coordination for area-licensed fixed wireless systems     WP 9B     2001-10-11
[ 59 ]  
 
Draft revision of Recommendation ITU-R F.1520 - Radio-frequency arrangements for systems in the fixed service operating in the band 31.8-33.4 GHz     WP 9B     2001-10-11
[ 53 ]  
 
Draft revision of Recommendation ITU-R F.1102 - Characteristics of fixed wireless systems operating in frequency bands above about 17 GHz     WP 9B     2001-10-11
[ 52 ]  
 
Draft revision of Recommendation ITU-R F.1497 - Radio-frequency channel arrangements for systems in the fixed service operating in the band 55.78-59 GHz     WP 9B     2001-10-11
[ 51 ]  
+Corr.1 
Draft revision of Recommendation ITU-R F.1496 - Radio-frequency channel arrangements for radio-relay systems in the fixed service operating in the band 51.4-52.6 GHz     WP 9B     2001-10-11
[ 21 ]  
 
Summary of draft Recommendations     WP 9B     2001-10-11
[ 19 ]  
 
Report of the Working Party 9B meeting     Chairman, WP 9B     2001-10-11
Results:26 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-7-19