International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 15 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2016-04-01
[ 14 ]  
 
Proposals on WRC-19 agenda item 9.1, issue 9.1.9     Russian Federation   AI9.1   2016-03-31
[ 13 ]  
 
Liaison statement on Network Security Requirements for Public Protection and Disaster Relief (PPDR) and Emergency Communications to ITU-R Working Parties 4A, 4B, 4C; and ITU-R Working Party 5A     ITU-T SG 17     2016-03-30
[ 12 ]  
 
Proposal on the studies under WRC-19 agenda item 9.1 issue 9.1.2     China (People's Republic of)   AI9.1   2016-03-29
[ 11 ]  
 
Information and provisional work plan for WRC-19 agenda item 1.6     China (People's Republic of)   AI1.6   2016-03-29
[ 10 ]  
 
Draft revision of Report ITU-R BO.2019 - Interference calculation methods     Japan     2016-03-24
[ 9 ]  
 
Draft Note to the Director, Radiocommunication Bureau - Proposed modifications to Section B3, Part B of the Rules of Procedure in the application of RR No. 11.32A - Rules concerning calculation methodology for calculating the probability of harmful interference between space networks     Japan     2016-03-24
[ 8 ]  
 
Application of coordination arc in the Ka band, to determine coordination requirements between FSS and other satellite services     HISPASAT, S.A.     2016-03-17
[ 7 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5D     2016-03-09
[ 6 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 5C) - Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA]     WP 5D     2016-03-08
[ 5 ]  
 
Liaison statement on deliverables of ITU-T Focus Group AC (Focus Group on Aviation applications of cloud computing for flight data monitoring)     ITU-T (TSAG)     2016-02-12
[ 4 ]  
 
Liaison statement to ITU-R Study Groups 4 and 5 and ITU-T Study Groups 9 and 16 on Global Platform for the Broadcasting Service - Global Platform for the Broadcasting Service     WP 6B   140/6   2016-02-04
[ 3 ]  
 
Liaison statement on new ITU-T SG 20     ITU-T SG 20     2015-12-15
[ 2 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5     ITU-T SG 5     2015-12-08
[ 1 ]  
 
Documents to be carried over from the 2012-2015 study period     WP 4A     2015-12-08
Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18